| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance | ₹2.1 L | L1 | Accepted-Finance Paper Complete |
| 2 | L2₹2.1 L+₹1,238.24 (0.60%)Accepted-Finance 0 12 UTTAR PRADESH | GHAZIABAD | UTTAR PRADESH | 201001 | ₹2.1 L+₹1,238.24 (0.60%) | L2 | Accepted-Finance Paper Complete |
| 3 | L3₹2.1 L+₹2,270.10 (1.10%)Accepted-Finance | ₹2.1 L+₹2,270.10 (1.10%) | L3 | Accepted-Finance Paper Complete |
Tender Value
₹2.1 L
EMD Value
₹21,000
Closing Date
11 Jun 2026, 5:00 pmClosed
Executive Office
Executive Officer Nagar Palika Parishad Bulandshah
4700WorkTender000046
2026_DOLBU_1150143_1
125 Date 15-05-2026
Open Tender
Civil Works
Percentage
60 days
Executive Officer Nagar Palika Parishad Bulandshah
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
Executive Officer Nagar Palika Parishad Bulandshah
₹21,000
18 Jun 2026
21 May 2026
12 Jun 2026
21 May 2026
11 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Of old RCC coverd slab/ Ramp including stacking of all material at site | 1 | cum | 1,340 | ₹1,338.66 |
| 2 | Dismantling of old damaged Cement concrete Interlocking paver Tiles road incloding stacking of all material at site | - | sqm | 35 | - |
| 3 | Dismantling Of old damaged Brick work in cement mortar | - | CUM | 600 | - |
| 4 | Excavation work for Drain/Nala in foul condition of Soil including, lift upto 1.50 M and lead Upto 30m | 1 | cum | 132 | ₹131.87 |
| 5 | First class B/w in 1:4 Cement C'sand mortor in Sub Structure including supply of all meterial labour t&P etc required for proper completion of work | 1 | cum | 5,170 | ₹5,164.83 |
| 6 | 12 mm thick Plaster with cement & course Sand of 1.25 FM Mortar in 1:4 | - | SQM | 200 | - |
| 7 | Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. | 1 | cum | 7,050 | ₹7,042.95 |
| 8 | Supply,Laying and Consolidation of 22.40-53 mm gauge stone Ballast | 8.82 | cum | 4,368 | ₹38,525.76 |
| 9 | Construction of un-reinforced dowl jointed at expansion and constructtion joint plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. | 1 | cum | 8,050 | ₹8,041.95 |
| 10 | Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually/ by various sizes including demolishing of R.C.C. work manually/ by various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge. | - | each | 599 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_2153470.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .