| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹46.2 L+₹19,883.32 (0.43%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹54.4 L
EMD Value
₹1.1 L
Closing Date
8 Feb 2023, 11:00 amClosed
SE SK SINGH
OFFICE IRRIGATION WORK CIRCLE , 9 TB SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Construction of CR stone masonry boundary wall, renovation of inspection house and staff quarters at Laltara Inspection house, Prayagraj
2023_UPIDC_764223_15
07/SE/2022-23
Open Tender
Civil Works - Buildings
Item Wise
45 days
KHIRI
Construction of CR stone masonry boundary wall, renovation of inspection house and staff quarters at Laltara Inspection house, Prayagraj
2 documents required · 2 mandatory
₹2,354
₹1.1 L
Yes
1 Mar 2023
3 Feb 2023
8 Feb 2023
3 Feb 2023
8 Feb 2023
3 Feb 2023
Amount
Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60m. .
DismantIing brick mesonary work in cement mortar including stacking of materials as directed by Engineer- in-charge within a distance of 60 M
Dismantling existing plaster including disposal of refuse as directed by Engineer-in-charge within a distance of 6OM.
Dismantling cement concrete or brick or granolithic fIoor including base concrete including stacking of dismantled materials within a distance of 60 M. as directed by the Engineer-in-charge.
R.C.C 1:1:2 with coarse sand, cement Stone ballast 10 to 20 mm in size including Cost of all materials, Labour, T&P etc. required for proper completion of work.
Steel reinforcement in slab including cutting bending, binding and placing in proper position including cost of steel, binding wire, labour, and T&P etc.
Centering & shuttering for R.C.C. of slab including cost of labour, material ,T&P etc.
S/F pressed steel Chaukhat made of M.S. Sheet 18 gauge (1.25 mm.) including iron hinges of 100 X 3 MM. I.S.I. Mark drilling holes of L-drop, tower bolt and 230 x 40 X 6 mm. flat iron hold fast including supply of all materials, labor, T&P ,carriage up to site with one coat of red oxide primer
Supply and Fixing of 4.5 cm thick seasoned wood partly panelled and partly glazed door and window Shuliters including supply and lixing of wooden cleats and stops and including fixing & adjustment or hinges, bolts, lacks handles springs and/or other fittings but excluding painting with two coats of Black. Japan on all iron fittings if necessary and including fixing the glass panels with putty and brand, filling, with necessary screws to be supplied departmentally.
Painting two coat of Synthetic enamel paint on new surface (excluding cost of primer) superior quality such as luxol, higloss, apcolite, superiarc. dulux, including cost of all material, labour T&P etc. required for proper completion of work.
brick. masoanry with cement mortar 1:3 for wall including cost of all material, labour, T&P, etc.
Cement plastering on brick masonry . Rate are for 3m. height, lead upto 60M encluding cast of materials.
C.C. 1:3:6 in making base for flooring including cost of all material, labour, T&P, etc.
Granolithic Marble flooring 2.5 cm (1") thick consisting of 2 cm (3/4") thick layer of 1 part cement, 2 parts of approved coarse sand and 4 parts of 2 cm (3/4") graded approved stone chips including 5 mm (1/4") thick surface coat with ordinary cement, black and white or grey or mixed marble chips passing 3 mm (1/8") but retained on 1.5 mm (1/6") mesh screen in proportion of 1:2 as specified or directed by the Engineer Incharge and polished by hand or machine and finally finished with French Mansion Polish or any other approved polish and including 8 cm (3") 1:6:12, concrete base, including supply of all materials, labour & Tools and Plants etc. required for proper completion of the work. Excluding GST.
Granolithic marble dado 2 cm (1/4") thick consisting of 15 mm (9/16") thick layer of one part cement, 2 parts of approved coarse sand including 5 mm (3/16") thick surface coat with ordinary cement, black or white or grey or mixed marble chips passing 3 mm (1/8") but retained on 15 mm (9/16") mesh screen in proportion of 1:2 as specified or directed by the Engineer Incharge and polished by hand or by machine and finally finished with French Mansion Polish or other approved polish including supply of all materials, labour and Tools & Plants etc. required for proper completion of the work. Excluding GST.
Frixing glass strips 3 mm. thick 32 mm wide in joints of floor and skirting at the time of laying floors flush with floor level including cost of all material, laoour, T&P etc
Finishing wall and ceiling with white cloured two coat approved make of or Birla / J.K. wall putty including cost of all material latbour T&P required for proper completion of'work.
Distempering two coat of oil bound distemper of approed make of Burger, Asian, Nerolac, over one priming coat of cement primer on new surface after thoroughly brushing the surface free from mortar dropping making the surface even with plaster of paris/whiting and sand papered Smooth including cost of materials, Labour, T&P etc. required proper completion of work.
Painting two coat of synthetic enamel paint on new steel surface (excluding cost of primer) including cost of all material labour T&P etc. required for proper completion of work .
Electrical work including all material & labour and T&P etc.
Earth work in excavation of foundation including all lead , lift and labour & T&P cost etc.
C.C. 1 :3 :6 in bed of wall (one part of cement, 2 part of coarse sand FM>2.00, 4 part of stone ballast 22.4 to 53M.M.) including cost of all material, labour, T&P, etc.
C.R.S.masoanry with 1:3 (one part of cement three part of coarse sand F.M.>2.00) including cost of all material, labour, T&P, etc.
Cement pointing in stone masonry in 1:2 C.M. including cost of all material, labour. T&P, etc.
Fabrication and fixing of Mild steel/ iron work in grill, gates, railing, door,window frames including cutting, drilling, welding/ rewetting and fixing hinges where necessary with fixing in position including cost of all material, labour, T&P etc. required for proper completion of work with one coat of red oxide primer.
Providing fixing in position on angle iron section ISA-35x35x5MM thick for barbed wiar fancing including cutting, cost age with cost of all material labour T&P etc. with one cost of oxide primer.
Centering & shuttering for C.C. of coping including cost of labour, material ,T&P etc.
Painting two coat of synthetic enamel paint on new steel surface (excluding cost of primer) including cost of all material labour T&P etc. required for proper completion of work
coping on wall and coulmn with C.C. 1:2:4 with 10-20MM size stone grit including cost of all material, labour, T&P, etc
Providing barbed iron wire fancing including fixing it to post ofter stretching including cost of labour, material ,T&P etc. required for proper completion of the work.
M/S SURESH KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .