SEKAR HIRUDHAYAM
TECHNIP ENERGIES INDIA LIMITED, CHENNAI
SUPPLY OF HV SOFT STARTER RAW WATER INTAKE (RWI) PUMPS FOR NUMALIGARH REFINERY EXPANSION PROJECT
2024_NRL_837350_1
TP/082176C/NRL/PQ/166
Limited
Electrical Goods/Equipment
Supply
180 days
NUMALIGARH
Please refer tender documents
7 documents required · 7 mandatory
₹0
Exempted
20 Mar 2025
29 Nov 2024
17 Jan 2025
29 Nov 2024
16 Jan 2025
24 Dec 2024
Scope shall include Design, engineering, manufacture, procurement of materials and bought out components,assembly at shop, inspection, testing at manufacturer's works & packing, transportation to site of HV Soft starter listed in this scope of supply document, including suitable base frame (ISMC 100 x 50) for installation, supply of all mandatory spares, operation & maintenance spares, commissioning spares & special tools and tackles,erection material & documentation as specified in the Specification & documentation as per job specification,data sheets, single line diagram, control schematics etc. and other codes and standards attached or referred in Material Requisition (MR) ref:TP-1ZZZA-EL-SOS-0019_D1
HV SOFT STATER FOR 1U66-PM-4803A MOTOR - 6.6 kV AC, 3Ph, 3W, 50Hz, 40kA FOR 1 SEC.
HV SOFT STATER FOR 1U66-PM-4803B MOTOR - 6.6 kV AC, 3Ph, 3W, 50Hz, 40kA FOR 1 SEC
HV SOFT STATER FOR 1U66-PM-4803C MOTOR - 6.6 kV AC, 3Ph, 3W, 50Hz, 40kA FOR 1 SEC.
Training to 2 Nos. of Owner personnel at OEM’s factory for 3 days for the entire Package (Including Condition monitoring).
Training to 5 Nos. of Owner personnel at NREP Site for 3 days for the entire Package (Including Condition monitoring).
Commissioning / Support Engineer from OEM shall be stationed at NREP Site for the duration of 1 month from the date of commissioning & handover for the entire package
Bidder shall provide Per Diem rate for Supervision services for Installation, testing and commissioning for the entire package
Cost for Additional Warranty period of "24 months after commissioning or 36 months after dispatch whichever is earlier” over and above the Standard Warranty Period Refer Note-11
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .