Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.4 LAccepted-Finance | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹44.5 L+₹5.0 L (12.8%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹46.2 L+₹6.8 L (17.2%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹48.8 L+₹9.3 L (23.7%)Rejected-Finance | L4 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | M/S AALIA CONSTRUCTION & ENGINEERS L2 | MEGA CONCRETE CONSTRUCTION ENGINEERS AND CONTRACTORS L4 | M/S GHULAM AHMAD ABDUL SAMAD L3 | M/S TAHAA BUILDERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc 1.50m wide and n exc 1.5m depth for foundation etc or for shafts, wells, etc and getting out in hard/ dense soil complete all as specified and directed. | 132 | Cum | 50 ₹6,600 Lowest | 250 ₹33,000 | 95 ₹12,540 | 250 ₹33,000 |
| 2.00 | Excavating over areas, n exc 1.5 m deep and getting out in hard/dense soil complete all as specified and directed | 44 | Cum | 30 ₹1,320 Lowest | 250 ₹11,000 | 80 ₹3,520 | 250 ₹11,000 |
| 3.00 | Excavating over areas, exc 1.5m deep but n exc 3.0 m and getting out in hard/dense soil complete all as specified and directed | 41 | Cum | 30 ₹1,230 Lowest | 250 ₹10,250 | 75 ₹3,075 | 250 ₹10,250 |
| 4.00 | Returning filling incl spreading leveling watering and well rammings in layers n exc 25cm complete all as specified and directed. | 86 | Cum | 30 ₹2,580 Lowest | 80 ₹6,880 | 55 ₹4,730 | 90 ₹7,740 |
| 5.00 | Removal of surplus soil n exc 50m and depositing where dirtected at a level n exc 1.5m above the starting point complete all as specified and directed. | 131 | Cum | 20 ₹2,620 Lowest | 80 ₹10,480 | 70 ₹9,170 | 60 ₹7,860 |
| 6.00 | M&L for cement concrete 1:4:8 type D-2 (40mm graded aggregate) in foundation, filling and mass concrete complete all as specified and directed. | 10.53 | Cum | 1,500 ₹15,795 Lowest | 2,500 ₹26,325 | 2,800 ₹29,484 | 3,000 ₹31,590 |
| 7.00 | Use and waste formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping) rough finished complete all as specified and directed by Engr-in-charge. | 24 | Sqm | 200 ₹4,800 Lowest | 250 ₹6,000 | 300 ₹7,200 | 270 ₹6,480 |
| 8.00 | Use & waste formwork for sides of concrete foundations, footing, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter complete all as specified and directed. | 187.22 | Sqm | 150 ₹28,083 Lowest | 250 ₹46,805 | 200 ₹37,444 | 200 ₹37,444 |
| 9.00 | Use & waste formwork for sides of columns etc and similar work; vertical or to batter complete all as specified and directed. | 150.96 | Sqm | 200 ₹30,192 | 250 ₹37,740 | 210 ₹31,701.6 | 160 ₹24,153.6 Lowest |
| 10.00 | Use & waste for formwork to sides and soffits of floor or roof beam, beam hauchings, girders, bressum-mers, lintels, cantilevers, shelves including supports, overhangs, etc. also splays between floors and beams etc complete all as specified and directed. | 232.37 | Sqm | 200 ₹46,474 | 300 ₹69,711 | 200 ₹46,474 | 190 ₹44,150.3 Lowest |
Tender Value
₹43.5 L
EMD Value
₹87,000
Closing Date
7 Sept 2026, 6:00 pmClosed
Lt Col Ravinder Kumar, GE
GE 970 EWS, PIN-913970, c/o 56 APO
PROVN OF TWO SETS OF COMMUNITY TOILETS (EACH CONSISTING 10 x URINAL POINTS, 05 x WASHBASIN AND 20 x TOILET SEATS) AND WATER CONNECTION WITH 50 USERS SEPTIC TANK AND SOAKAGE WELL AT 256 TRANSIT CAMP IN OLD AIR FIELD, SRINAGAR UNDER GE 970 EWS
2026_MES_783691_1
GE 970 EWS-72(T)/2026-27
Open Tender
Civil Works
Item Rate
180 days
OLD AIR FIELD SRINAGAR
As per NIT
8 documents required · 8 mandatory
₹500
GE 970 EWS
₹87,000
Yes
6 Oct 2026
11 Aug 2026
9 Sept 2026
11 Aug 2026
7 Sept 2026
26 Aug 2026
11 Aug 2026 - 31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n.exc 1.50m wide and n exc 1.5m depth for foundation etc or for shafts, wells, etc and getting out in hard/ dense soil complete all as specified and directed. | 132 | Cum | - | - |
| 2 | Excavating over areas, n exc 1.5 m deep and getting out in hard/dense soil complete all as specified and directed | 44 | Cum | - | - |
| 3 | Excavating over areas, exc 1.5m deep but n exc 3.0 m and getting out in hard/dense soil complete all as specified and directed | 41 | Cum | - | - |
| 4 | Returning filling incl spreading leveling watering and well rammings in layers n exc 25cm complete all as specified and directed. | 86 | Cum | - | - |
| 5 | Removal of surplus soil n exc 50m and depositing where dirtected at a level n exc 1.5m above the starting point complete all as specified and directed. | 131 | Cum | - | - |
| 6 | M&L for cement concrete 1:4:8 type D-2 (40mm graded aggregate) in foundation, filling and mass concrete complete all as specified and directed. | 10.53 | Cum | - | - |
| 7 | Use and waste formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping) rough finished complete all as specified and directed by Engr-in-charge. | 24 | Sqm | - | - |
| 8 | Use & waste formwork for sides of concrete foundations, footing, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter complete all as specified and directed. | 187.22 | Sqm | - | - |
| 9 | Use & waste formwork for sides of columns etc and similar work; vertical or to batter complete all as specified and directed. | 150.96 | Sqm | - | - |
| 10 | Use & waste for formwork to sides and soffits of floor or roof beam, beam hauchings, girders, bressum-mers, lintels, cantilevers, shelves including supports, overhangs, etc. also splays between floors and beams etc complete all as specified and directed. | 232.37 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tender72T_merged.pdf
Tender Documents • 1.50 MB
BOQ_878081.xls
BOQ • 15.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .