| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-Finance | ₹2.8 Cr | L1 | Accepted-Finance FOUND OK |
| 2 | L2₹3.9 Cr+₹1.1 Cr (39.8%)Accepted-Finance | ₹3.9 Cr+₹1.1 Cr (39.8%) | L2 | Accepted-Finance FOUND OK |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
27 May 2024, 12:00 pmClosed
SE EDC MAINPURI
POWER HOUSE CAMPUS MAINPURI
Installation of LTBYHT protection Tail Less Unit Installation of Distribution Transformers and related electrical works on SemiTurnkey basis in business plan year 2024BY25 Under Electricity Distribution Division I_II_III District mainpuri
2024_DVVNL_922745_2
EDC(M)-75/2023-24
Open Tender
Electrical Works
Lump-sum
180 days
DISTRICT MAINPURI
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹5,900
DVVNL
₹2.9 L
5 Jun 2024
3 May 2024
27 May 2024
3 May 2024
27 May 2024
3 May 2024
Amount
Supply of the Following Material with Freight etc. charges.
Tail Less Unit with all required accessories for 100 KVA and Above Capacity of Distribution Transformer As per Norms
LT Fuse Set with all required accessories Complete for 63 KVA Distribution Transformer
DO Fuse Set with all required accessories for 100 KVA and above Capacity Distribution Transformer As per Norms.
Boots and Sleeve's with all required accessories for 250 KVA and above Capacity Distribution Transformer As per Norms.
Battery Set 12 Volt with all required accessories As per Norms. (Qty In Set)
Battery Charger with all required accessories As per Norms.
Copper Control Cable As per Norms & Requirement of Concern EE EDD-I,II,III Mainpuri
WTI As per Norms.
OTI As per Norms.
Erection and Repairing of the Following Material and equipment.
Installation of Tail Less Unit with proper grouting of structure with make proper connection as per Norms.
Installation of LT Fuse Set Complete for 63 KVA Distribution Transformer
Installation of DO Fuse Set Complete for 100 KVA and above Capacity Distribution Transformer As per Norms.
Installation of Boots and Sleeve's Complete for 250 KVA and above Capacity Distribution Transformer As per Norms.
Installation of Battery Set 12 Volts Complete As per Norms. (Qty In Set)
Installation of Battery Charger Complete As per Norms.
Fixing of Control Cable and make proper connection As per Norms & Requirement of Concern EE EDD-I,II,III Mainpuri
Installation of WTI complete As per Norms.
Installation of OTI complete As per Norms.
Safe carriage of small line material from ESC, Mainpuri to Pit site of work including loading and unloading at both ends. Distance Approx 0 TO 30 KM.
Water level Pipe Earthing of Panel's Neutral & TF Neutral & body and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Replacement of 33 KV Fuse Set with New one.(As per RESPO Schedule)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of New 33 KV Fuse set with structure and proper grouting and make proper conncetion.(As per RESPO Schedule)
Safe Carriage from ESC, Mainpuri to Pit site of work and Replacement of Lightning Arrestor (LA) with New one. (As per RESPO Schedule)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of New Lightning Arrestor (LA) with structure and proper grouting and make proper conncetion.(As per RESPO Schedule)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of Buchholz relay (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Replacement of CT/PT Unit with New one. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of CT/PT Unit with structure and proper grouting and make proper conncetion. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Replacement of Line Isolator and Bus Isolator with New one. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of Line Isolator and Bus Isolator with structure and proper grouting and make proper conncetion. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Replacement of Control Pannel Relay with New one. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of Control Pannel Relay with structure and proper grouting and make proper conncetion. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Replacement of Line Breaker with New one. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of Line Breaker with structure and proper grouting and make proper conncetion. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of 33 KV breaker with structure and proper grouting and make proper conncetion. (IF REQUIRED)
Safe Carriage from ESC, Mainpuri to Pit site of work and Installation of 11 KV breaker with structure and proper grouting and make proper conncetion. (IF REQUIRED)
Opening of 33KV and 11KV side connections/Jumpers and removing the cables, Opening of top covers by opening of nut and bolts and lifting using Crane, Opening and removing the conservator taks, dranning out the Transformer Oil in drums upto desired level and its keeping at safe place. Changing Cork Sheet of Tank, Radiators and Valves, Changing 11K and 33KV side packing of Bushings, Changing damaged 33KV nad 11KV side Bushing and any associated part thereof. After changing the above parts and packings, setting carefully the top plate and cover of Transformer, Radiator and conservator Tank at there proper palce, using nut and bolts then filling of Transformer Oil, including the work of Cleaning of 11KV, 33KV Bushings and Conservator Tanks. Connecting the 33KV and 11KV site cables/Jumpers properly and other respective works for energisation of Transformers, including top up of transformer oil.(Oil will be provided by Department as per requirement)
Centrifusing of Oil For Power Transformer Different Capacity ( If Required)
Received back of all Scrap from Pit Site of work to ESC mainpuri.
AMIT ENGINEERING CORPORATION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .