| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.5 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹44.3 L+₹15.8 L (55.6%)Rejected-Finance 1001 63 SHALIMAR GARDEN ISMAILGANJ NEAR INDIRA NAGAR SECTOR 08 CROSSING LUCKNOW 226016 | LUCKNOW | UTTAR PRADESH | 226016 | L2 | Rejected-Finance Not lowest bidder | |
| 3 | L3₹44.4 L+₹15.9 L (55.9%)Rejected-Finance | L3 | Rejected-Finance Not lowest bidder | |
| 4 | L4₹45.0 L+₹16.5 L (57.8%)Rejected-Finance | L4 | Rejected-Finance Not lowest bidder | |
| 5 | L5₹45.0 L+₹16.5 L (58.0%)Rejected-Finance | L5 | Rejected-Finance Not lowest bidder |
| Sl No | Description | Qty | Unit | S.R.M.K Enterprises L7 | S V CONSTRUCTION L4 | ShreHari Civil Enginneering and Contractors L8 | RK ENTERPRISES L2 | M/S K.D.MATE L1 | M/S J P ENTERPRISES L9 | M/S SANDEEP CONSTRUCTION COMPANY L3 | K.D.Electricals L5 | MANIYA CONSTRUCTION CO L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00NOTE FOR ALL PAINITNG ITEMS :- The following precautionary measures shall be ensured by the contractor during execution of work :- (i) Contractor shall deposit entire quantity of materials (proprietory materials) in sealed containers required for painting works covered under subject contract in the custody of Engineer-In-Charge/ Office in charge of unit. (ii) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis and the empty containers/ bags shall be deposited in the store of Engineer -In-Charge by the contractor, for verification as per standard consumption/ coverage prescribed by the manufacturers. (iii) Before applying cement base paint/weather proof acrylic emulsion paint contractor shall use the wire brush for the removal of loose paint, dust, algae, moss and filling of crack using crack sealent and cleaning of surface by spray jet. (iv) Application of cement base paint strictly done by spray/mechanical spray machine only, otherwise 30% cost shall be reecovered from the respective item. (v) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor, glasses and joinery. (d) Safety head gear, gloves, apron, shoes and safety glasses should be wear while carrying out the painting works. (e) The scafolding shall be having ease of access for inspection purpose. | ||||||||||||
| 2.00 | Rendering 15mm thick on brick /concrete or dubbed surface in CM 1:6 on wall with water profing compound finishing even & smooth without using extra cement and similar like at any height including necessary scaffolding, ladder including taking down cement plaster, raking out joints, hacking for key & scrubbing down with water and removing the debris outside defence land complete all as specified and as directed.
NOTE :- Water proofing compound shall be measured & paid separetely | 150 | Sqm | 325 ₹48,750 | 350 ₹52,500 | 300 ₹45,000 | 275 ₹41,250 | 150 ₹22,500 Lowest | 200 ₹30,000 | 300 ₹45,000 | 350 ₹52,500 | 280 ₹42,000 |
| 3.00 | Rendering 15mm thick on brick /concrete or dubbed surface in CM 1:4 on wall with water profing compound finishing even & smooth without using extra cement and similar like at any height including necessary scaffolding, ladder including taking down cement plaster, raking out joints, hacking for key & scrubbing down with water and removing the debris outside defence land complete all as specified and as directed.
NOTE :- Water proofing compound shall be measured & paid separetely | 200 | Sqm | 325 ₹65,000 | 400 ₹80,000 | 270 ₹54,000 | 350 ₹70,000 | 150 ₹30,000 Lowest | 200 ₹40,000 | 300 ₹60,000 | 350 ₹70,000 | 275 ₹55,000 |
| 4.00 | Supply only liquid water proofing compound complete all as specified and as directed. | 10 | Ltr | 190 ₹1,900 | 150 ₹1,500 | 150 ₹1,500 | 300 ₹3,000 | 100 ₹1,000 Lowest | 100 ₹1,000 Lowest | 500 ₹5,000 | 200 ₹2,000 | 170 ₹1,700 |
| 5.00 | Rendering 10 mm thick on concrete surfaces in cement mortar 1:3 finishing even and smooth without using extra cement to RCC ceiling, chhajjas, roof projection, facia,fins,parapet with WPT etc. and similar likes upto height 10 mtr including necessary scaffolding, ladder, formwork and including taking down cement/lime plaster of any description including raking out joints hacking for key scrubbing down with water etc and removing the debris outside the defence land complete all as specified and as directed. | 150 | Sqm | 250 ₹37,500 | 250 ₹37,500 | 230 ₹34,500 | 250 ₹37,500 | 150 ₹22,500 Lowest | 200 ₹30,000 | 300 ₹45,000 | 300 ₹45,000 | 230 ₹34,500 |
| 6.00 | Material and labour for preparation of new plastered surfaces of ceiling, chhajjas, roof projection, facia, fins, parapet etc and applying three coats of white wash complete all as specified and as directed. | 150 | Sqm | 25 ₹3,750 | 20 ₹3,000 | 50 ₹7,500 | 25 ₹3,750 | 2 ₹300 Lowest | 40 ₹6,000 | 250 ₹37,500 | 30 ₹4,500 | 21 ₹3,150 |
| 7.00 | Material and labour for preparation of new plastered wall surface and applying two coat of oil bond distemper emulsion white or tined over one coat of Priming plastered and other surfaces with alkali resistant priming paint, on plastered surfaces on wall complete all as specified and directed. | 150 | Sqm | 75 ₹11,250 | 65 ₹9,750 | 90 ₹13,500 | 75 ₹11,250 | 35 ₹5,250 Lowest | 80 ₹12,000 | 300 ₹45,000 | 80 ₹12,000 | 65 ₹9,750 |
| 8.00 | Material and labour for preparing new plastered surface of walls and applying two coat of cement base paint at any height including necessary scaffolding ladder etc complete all as specified and as directed. | 200 | Sqm | 70 ₹14,000 | 80 ₹16,000 | 70 ₹14,000 | 75 ₹15,000 | 35 ₹7,000 Lowest | 35 ₹7,000 Lowest | 36 ₹7,200 | 80 ₹16,000 | 70 ₹14,000 |
| 9.00 | Material and labour for preparation of old wood or wood based surfaces over 10cm width or girth, not otherwise described and applying one coat of synthetic enamel paint, complete all as specified and as directed. | 3,000 | Sqm | 90 ₹2,70,000 | 60 ₹1,80,000 | 65 ₹1,95,000 | 45 ₹1,35,000 | 25 ₹75,000 Lowest | 60 ₹1,80,000 | 45 ₹1,35,000 | 100 ₹3,00,000 | 75 ₹2,25,000 |
| 10.00 | Material and labour for preparation of old painted steel surface of any description, not otherwise described over 10cm width or girth and applying two coat of synthetic enamel paint complete all as specified and as directed | 1,200 | Sqm | 145 ₹1,74,000 | 70 ₹84,000 | 65 ₹78,000 | 75 ₹90,000 | 25 ₹30,000 Lowest | 80 ₹96,000 | 45 ₹54,000 | 150 ₹1,80,000 | 125 ₹1,50,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
22 Aug 2026, 6:00 pmClosed
GE CENTRAL KHADKI
GE CENTRAL KHADKI RANGE HILLS ROAD KHADKI PUNE-411003
PERIODICAL SERVICES AND ALLIED B/R WORK IN ME LINE, OFFICER MESS CAFVD, NEHRU RAOD, RA LINE ARA UNDER AGE B/R-I UNDER GE (CENTRAL) KHADKI.
2026_MES_782050_1
8410/E8 OF 2026-2027
Open Tender
Civil Works
Item Rate
270 days
CAFVD area
Class D Category a(i)
7 documents required · 7 mandatory
₹500
GE CENTRAL KHADKI
₹90,000
Yes
24 Sept 2026
31 Jul 2026
24 Aug 2026
31 Jul 2026
22 Aug 2026
15 Aug 2026
31 Jul 2026 - 7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Rendering 15mm thick on brick /concrete or dubbed surface in CM 1:6 on wall with water profing compound finishing even & smooth without using extra cement and similar like at any height including necessary scaffolding, ladder including taking down cement plaster, raking out joints, hacking for key & scrubbing down with water and removing the debris outside defence land complete all as specified and as directed.
NOTE :- Water proofing compound shall be measured & paid separetely | 150 | Sqm | - | - |
| 3 | Rendering 15mm thick on brick /concrete or dubbed surface in CM 1:4 on wall with water profing compound finishing even & smooth without using extra cement and similar like at any height including necessary scaffolding, ladder including taking down cement plaster, raking out joints, hacking for key & scrubbing down with water and removing the debris outside defence land complete all as specified and as directed.
NOTE :- Water proofing compound shall be measured & paid separetely | 200 | Sqm | - | - |
| 4 | Supply only liquid water proofing compound complete all as specified and as directed. | 10 | Ltr | - | - |
| 5 | Rendering 10 mm thick on concrete surfaces in cement mortar 1:3 finishing even and smooth without using extra cement to RCC ceiling, chhajjas, roof projection, facia,fins,parapet with WPT etc. and similar likes upto height 10 mtr including necessary scaffolding, ladder, formwork and including taking down cement/lime plaster of any description including raking out joints hacking for key scrubbing down with water etc and removing the debris outside the defence land complete all as specified and as directed. | 150 | Sqm | - | - |
| 6 | Material and labour for preparation of new plastered surfaces of ceiling, chhajjas, roof projection, facia, fins, parapet etc and applying three coats of white wash complete all as specified and as directed. | 150 | Sqm | - | - |
| 7 | Material and labour for preparation of new plastered wall surface and applying two coat of oil bond distemper emulsion white or tined over one coat of Priming plastered and other surfaces with alkali resistant priming paint, on plastered surfaces on wall complete all as specified and directed. | 150 | Sqm | - | - |
| 8 | Material and labour for preparing new plastered surface of walls and applying two coat of cement base paint at any height including necessary scaffolding ladder etc complete all as specified and as directed. | 200 | Sqm | - | - |
| 9 | Material and labour for preparation of old wood or wood based surfaces over 10cm width or girth, not otherwise described and applying one coat of synthetic enamel paint, complete all as specified and as directed. | 3,000 | Sqm | - | - |
| 10 | Material and labour for preparation of old painted steel surface of any description, not otherwise described over 10cm width or girth and applying two coat of synthetic enamel paint complete all as specified and as directed | 1,200 | Sqm | - | - |
| 11 | Material and labour for complete removal of existing treatement/old plastered surface of wall by wire brushes & stopping of surfaces & levelling/edging the disturbed places/edges using necessary filling compound of Birla/JK wall care putty to obtain smooth regular/even finish using sand paper and applying two coat of oil bound distemper emulsion upto height 10 mtr etc complete all as specified and as directed. | 3,500 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.12 MB
BOQ_876136.xls
BOQ • 0.31 MB
8410Tender.pdf
Tender Documents • 8.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .