Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹91,770.22Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹92,244.54+₹474.32 (0.52%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹93,875+₹2,104.78 (2.29%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹97,827.63+₹6,057.41 (6.60%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
30 Jul 2026, 4:00 pmClosed
Xen Rew Office Kathua
Xen Rew Office Kathua
Construction of water Tank at Danni near Mohd.Shafi, Sadiq, Karam Din Mohalla., W.No 07 Pyt Dhar Mahanpur, Block Dhar Mahanpur.
2026_RDPR_316767_4
e-NIT No.127/REW/K of 2026-27 Dated 18/07/2026 2nd Call
Open Tender
Civil Works
Percentage
30 days
Dhar Mahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹1,960
7 Aug 2026
18 Jul 2026
31 Jul 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 m in depth,disposal of excavated earth upto one metre from cutting edge, disposed earth to be levelled and neatly dressed in: All Kinds of soil. | 1.5 | cum | 479.3 | ₹718.95 |
| 2 | Providing and laying in position cement concrete of (1:5:10)grade excluding the cost of centering and shuttering using 40mm size agg. | 0.45 | cum | 4,826.5 | ₹2,171.93 |
| 3 | Providing and laying in position cement concrete of (1:3:6) grade excluding the cost of centering and shuttering - | 2.4 | cum | 5,733.8 | ₹13,761.12 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.55 | cum | 7,778.4 | ₹4,278.12 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.34 | cum | 9,395.7 | ₹3,194.54 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 69.87 | kg | 123.2 | ₹8,607.98 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 2.4 | cum | 7,877.4 | ₹18,905.76 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level | 2.4 | cum | 1,455.65 | ₹3,493.56 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. | 2.33 | sqm | 562.15 | ₹1,309.81 |
| 10 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) over 75mm bed of dry stone agg. | 2.7 | sqm | 572.8 | ₹1,546.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
BOQ_1034845.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .