Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 CrAccepted-AOC | ₹13.4 Cr | L1 | Accepted-AOC As per BoQ comparitive rated L1 |
| 2 | L2₹14.2 Cr+₹85.3 L (6.37%)Rejected-AOC | ₹14.2 Cr+₹85.3 L (6.37%) | L2 | Rejected-AOC As per BoQ comparitive rated L2 |
| 3 | L3₹15.1 Cr+₹1.7 Cr (12.9%)Rejected-AOC | ₹15.1 Cr+₹1.7 Cr (12.9%) | L3 | Rejected-AOC As per BoQ comparitive rated L3 |
| 4 | L4₹15.1 Cr+₹1.8 Cr (13.1%)Rejected-AOC | ₹15.1 Cr+₹1.8 Cr (13.1%) | L4 | Rejected-AOC As per BoQ comparitive rated L4 |
Tender Value
₹17.8 Cr
EMD Value
₹27.9 L
Closing Date
11 Feb 2020, 3:00 pmClosed
CEO, CSCL
Chandigarh Smart City Limited, Building No. 1, 2nd and 3rd Floor, Adjoining SCO 17,18,19, Over New Bridge, Sector 17A, Chandigarh 160017
Construction of 3 Material Recovery cum Transfer Stations Under Chandigarh Smart City
2020_CSCL_53921_1
CSCL_2019_MRF_Civil_2
Open Tender
Civil Works
Percentage
240 days
Chandigarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Chandigarh Smart City Limited
₹27.9 L
15 May 2020
3 Feb 2020
11 Feb 2020
3 Feb 2020
11 Feb 2020
3 Feb 2020
3 Feb 2020 - 11 Feb 2020
eProcurement System Chandigarh UT Administration Created By: sahil kumar Created Date/Time: 29-Apr-2020 02:51 PM Tender Title: Construction of 3 Material Recovery cum Transfer Stations Under Chandigarh Smart City Tender ID: 2020_CSCL_53921_1
Tender Inviting Authority: Chandigarh Smart City Limited, Chandigarh
Name of Work: Construction of 3 Material Recovery cum Trasnfer Station Under Chandigarh Smart City
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Vasu Construction Co. 178465795.861 -15.300 151160529.094 Fifteen Crore Eleven Lakh Sixty Thousand Five Hundred and Twenty Nine
2.00 SHAMLAL GUPTA AND SONS 178465795.861 -15.160 151410381.208 Fifteen Crore Fourteen Lakh Ten Thousand Three Hundred and Eighty One
3.00 Hans Raj Kohli and Company 178465795.861 -25.000 133849346.896 Thirteen Crore Thirty Eight Lakh Fourty Nine Thousand Three Hundred and Fourty Six
4.00 M/s SANJEEV KUMAR GOYAL CONTRACTOR 178465795.861 -20.220 142380011.938 Fourteen Crore Twenty Three Lakh Eighty Thousand Eleven
Lowest Amount Quoted BY: Hans Raj Kohli and Company(133849346.896)
BOQ Summary Details Tender Title: Construction of 3 Material Recovery cum Transfer Stations Under Chandigarh Smart City Tender ID: 2020_CSCL_53921_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Hans Raj Kohli and Company 133849346.896 L1
2 M/s SANJEEV KUMAR GOYAL CONTRACTOR 142380011.938 L2
3 Vasu Construction Co. 151160529.094 L3
4 SHAMLAL GUPTA AND SONS 151410381.208 L4
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .