| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAdmitted-Finance C 33 3971 GALI NO 6 JALANDHAR CANTT 144005 | JALANDHAR | JALANDHAR | PUNJAB | 144005 | ₹6.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.0 Cr+₹82.7 L (13.4%)Admitted-Finance 16 PRATAP NAGAR CHARBHUJA RAWATBHATA RAJASTHAN 323307 | RAWATBHATA | CHITTORGARH | RAJASTHAN | 323307 | ₹7.0 Cr+₹82.7 L (13.4%) | L2 | Admitted-Finance |
| 3 | L3₹7.0 Cr+₹83.7 L (13.6%)Admitted-Finance | ₹7.0 Cr+₹83.7 L (13.6%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Does not fulfill requisite criteria |
| Sl No | Description | Qty | Unit | M/S Mukesh Kumar Gupta L1 | B S Ranbir & Co. L3 | GUPTA CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00 | Total amount of Sch 'A' Sec-I ( BUILDING WORKS ) Lump sum price worked out by the contractor for " BUILDING WORKS " as listed in schedule 'A' Part-I | 1 | Lump Sum | 5,90,00,000 ₹5,90,00,000 Lowest | 6,78,50,000 ₹6,78,50,000 | 6,75,00,000 ₹6,75,00,000 |
| 2.00 | Total amount of Sch 'A' Sec II (SITE CLEARANCE, SITE DEVELOPEMENT & MISC. EARTH WORKS) Lump sum price worked out by the contractor for " SITE CLEARANCE & Earth Works " as listed in schedule 'A' Part-II | 1 | Lump Sum | 2,25,000 ₹2,25,000 | 1,70,000 ₹1,70,000 Lowest | 2,00,000 ₹2,00,000 |
| 3.00 | Total amount of Sch 'A' Sec III (INTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY WORKS " as listed in schedule 'A' Part-III | 1 | Lump Sum | 1,10,000 ₹1,10,000 | 1,27,932.68 ₹1,27,932.68 | 1,00,000 ₹1,00,000 Lowest |
| 4.00 | Total amount of Sch 'A' Sec IV (INTERNAL ELECTRIFICATION WORKS) Lump sum price worked out by the contractor for " INTERNAL ELECTRIFICATION WORKS " as listed in schedule 'A' Part-IV | 1 | Lump Sum | 5,75,000 ₹5,75,000 | 4,54,423.81 ₹4,54,423.81 Lowest | 5,00,000 ₹5,00,000 |
| 5.00 | Total amount of Sch 'A' Sec V (SEWAGE DISPOSAL WORKS) Lump sum price worked out by the contractor for " SEWAGE DISPOSAL WORKS " as listed in schedule 'A' Part-V | 1 | Lump Sum | 5,20,000 ₹5,20,000 | 5,49,613.01 ₹5,49,613.01 | 5,00,000 ₹5,00,000 Lowest |
| 6.00 | Total amount of Sch 'A' Sec VI (AREA DRAINAGE WORKS) Lump sum price worked out by the contractor for " AREA DRAINAGE WORKS " as listed in schedule 'A' Part-VI. | 1 | Lump Sum | 80,000 ₹80,000 Lowest | 90,000 ₹90,000 | 1,00,000 ₹1,00,000 |
| 7.00 | Total amount of Sch 'A' Sec VII (EXTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY WORKS" as listed in schedule 'A' Part-VII. | 1 | Lump Sum | 72,000 ₹72,000 | 70,000 ₹70,000 Lowest | 1,00,000 ₹1,00,000 |
| 8.00 | Total amount of Sch 'A' Sec VIII (DEMOLITION OF EXISTING BUILDINGS WORKS) Lump sum price worked out by the contractor for "DEMOLITION OF EXISTING BUILDINGS WORKS" as listed in schedule 'A' Part-VIII. | 1 | Lump Sum | 2,65,000 ₹2,65,000 | 2,75,000 ₹2,75,000 | 10,000 ₹10,000 Lowest |
| 9.00Schedule 'A'Section-IX (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col. 6 siginifies this fact only. | ||||||
| 10.00 | INTERNAL ELECTRIFICATION WORKS
M&L for Earthing complete with galvanised steel earth plate electrode 600 mmx600 mmx6mm thick burried directly in ground (earth pit not less than 2.25 meters deep below ground level) with top edge of the plate not less than 1.5 meters deep below normal ground level and filled with alternate layers of charcoal and salt with 15 cm thick layer , connected to galvanised wire earth lead 4.0mm dia by means of bolts, nuts, check nuts and washers made of galvanised iron, 20 mm bore GI pipe (med grade) for watering, 15 mm bore GI pipe (light grade) for protection of earth lead, including necessary earth work in any type of soil, Earth pit of PCC (1:3:6) type C1 and precast earth pit cover made of RCC (1:11/2:3) type A1 duly reinforced with 8 mm dia TMT bar @ 150 mm c/c both ways, one lifting handle made of 8 mm dia TMT bar embedded in cover slab complete all as specified and as shown in Electrical Plate No 3 of SSR Part-I including testing on completion, complete all as specified and directed. | 2 | Each Set | 7,000 ₹14,000 | 6,500 ₹13,000 Lowest | 12,000 ₹24,000 |
Tender Value
₹5.2 Cr
EMD Value
₹5.8 L
Closing Date
23 May 2026, 6:00 pmClosed
Chief Engineer Chandigarh Zone
HQ CE Chandigarh Zone N Area, Airport Road Chandigarh-160003
CA NO CE CHZ CHM T 26 2025 26 PROVN OF GYMNASIUM AT SUBATHU MIL STATION
2026_MES_756076_1
CE CHZ/CHM/T-26/2025-26
Open Tender
Civil Works
Lump-sum
365 days
Subathu
As per tender documents
9 documents required · 9 mandatory
₹3,000
GE Kasauli
₹5.8 L
Yes
29 Jun 2026
20 Mar 2026
25 May 2026
20 Mar 2026
23 May 2026
9 May 2026
20 Mar 2026 - 30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Total amount of Sch 'A' Sec-I ( BUILDING WORKS ) Lump sum price worked out by the contractor for " BUILDING WORKS " as listed in schedule 'A' Part-I | - | Lump Sum | - | - |
| - | Total amount of Sch 'A' Sec II (SITE CLEARANCE, SITE DEVELOPEMENT & MISC. EARTH WORKS) Lump sum price worked out by the contractor for " SITE CLEARANCE & Earth Works " as listed in schedule 'A' Part-II | - | Lump Sum | - | - |
| - | Total amount of Sch 'A' Sec III (INTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY WORKS " as listed in schedule 'A' Part-III | - | Lump Sum | - | - |
| - | Total amount of Sch 'A' Sec IV (INTERNAL ELECTRIFICATION WORKS) Lump sum price worked out by the contractor for " INTERNAL ELECTRIFICATION WORKS " as listed in schedule 'A' Part-IV | - | Lump Sum | - | - |
| - | Total amount of Sch 'A' Sec V (SEWAGE DISPOSAL WORKS) Lump sum price worked out by the contractor for " SEWAGE DISPOSAL WORKS " as listed in schedule 'A' Part-V | - | Lump Sum | - | - |
| - | Total amount of Sch 'A' Sec VI (AREA DRAINAGE WORKS) Lump sum price worked out by the contractor for " AREA DRAINAGE WORKS " as listed in schedule 'A' Part-VI. | - | Lump Sum | - | - |
| - | Total amount of Sch 'A' Sec VII (EXTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY WORKS" as listed in schedule 'A' Part-VII. | - | Lump Sum | - | - |
| - | Total amount of Sch 'A' Sec VIII (DEMOLITION OF EXISTING BUILDINGS WORKS) Lump sum price worked out by the contractor for "DEMOLITION OF EXISTING BUILDINGS WORKS" as listed in schedule 'A' Part-VIII. | - | Lump Sum | - | - |
| - | Schedule 'A'Section-IX (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col. 6 siginifies this fact only. | - | - | - | - |
| - | INTERNAL ELECTRIFICATION WORKS
M&L for Earthing complete with galvanised steel earth plate electrode 600 mmx600 mmx6mm thick burried directly in ground (earth pit not less than 2.25 meters deep below ground level) with top edge of the plate not less than 1.5 meters deep below normal ground level and filled with alternate layers of charcoal and salt with 15 cm thick layer , connected to galvanised wire earth lead 4.0mm dia by means of bolts, nuts, check nuts and washers made of galvanised iron, 20 mm bore GI pipe (med grade) for watering, 15 mm bore GI pipe (light grade) for protection of earth lead, including necessary earth work in any type of soil, Earth pit of PCC (1:3:6) type C1 and precast earth pit cover made of RCC (1:11/2:3) type A1 duly reinforced with 8 mm dia TMT bar @ 150 mm c/c both ways, one lifting handle made of 8 mm dia TMT bar embedded in cover slab complete all as specified and as shown in Electrical Plate No 3 of SSR Part-I including testing on completion, complete all as specified and directed. | - | Each Set | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Drg.rar
Additional Documents • 7.69 MB
BOQ_848101.xls
BOQ • 1.65 MB
FinalTender.rar
Tender Documents • 3.30 MB
Corrig2.pdf
PDF • 0.27 MB
Corrig1.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .