Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-Finance | ₹2.9 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹3.1 CrAccepted-Finance | ₹3.1 Cr | L2 | Accepted-Finance Accepted |
| 3 | L3₹3.2 CrAccepted-Finance | ₹3.2 Cr | L3 | Accepted-Finance Accepted |
| 4 | L4₹3.2 CrAccepted-Finance | ₹3.2 Cr | L4 | Accepted-Finance Accepted |
| 5 | L5₹3.5 CrAccepted-Finance | ₹3.5 Cr | L5 | Accepted-Finance Accepted |
Tender Value
₹4.5 Cr
EMD Value
₹9.0 L
Closing Date
29 May 2026, 3:00 pmClosed
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi.
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi, Basaidarapur Office Complex, New Delhi-110027.
Improvement of streets and side drain at E-Block Part-I Qutub vihar Phase- II in Matiala Assembly constituency AC-34(Regd No. 601)
2026_IFC_291630_1
EE/CD-XIX/DB/2026-27/04
Open Tender
Civil Works
Works
120 days
Qutab Vihar, Part-I
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹9.0 L
30 May 2026
20 May 2026
29 May 2026
20 May 2026
29 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire charges of JCB machine for demolishing steps, platform coming in the alingment of side drain including making plain undulations as per direction of Engineer-in-Charge. | 184 | Per Hrs | 1,395.96 | ₹2,56,856.64 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 23 | Cum | 3,551.25 | ₹81,678.75 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1,992 | Cubic Metre | 2,434.25 | ₹48,49,026 |
| 4 | Excavation of Silt including malba, earth debries, rubbish polythene bed all floating material etc. from the bed of the drain and disposal of excavted material at own sourse of contractor by mechanical transport upto all leads & Liftscomplete as per direction of Engineer-in-charge. | 429 | Cubic Metre | 473 | ₹2,02,917 |
| 5 | Supply and filling building rubbish in trenches plinth road in layers not exceeding 20cm depth, consolidating each layer each deposited layer by ramming and watering with all lead and lift. | 578 | Cubic Metre | 324.78 | ₹1,87,722.84 |
| 6 | Supply of earth including royalty excavation, loading, unloading and carriage by mechanical transport and banking the same in layer not exceeding 20cm in depth breaking clods watering rolling each layer with ½ tone roller or wooden or steel rammer sand dressing up in embankment for roads, flood banks, marginal banks and guide banks or filling up ground depressions with all lead & lifts in all kind of soil. | 520 | Cubic Metre | 523.4 | ₹2,72,168 |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 406 | Cubic Metre | 260.3 | ₹1,05,681.8 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 48 | Cubic Metre | 6,812 | ₹3,26,976 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA)). | 47 | Cubic Metre | 5,205.25 | ₹2,44,646.75 |
| 10 | Brick work with C&D bricks in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse san manufactured by using recycled C&D waste from authorized C&D waste recycling plant all complete as per t direction of Engineer-in-charge. | 124 | Cubic Metre | 7,931.04 | ₹9,83,448.96 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.54 MB
BOQ_387066.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].