Loading…
Loading…
Tender Value
₹16.7 L
EMD Value
₹16,740
Closing Date
9 Jul 2026, 5:00 pmClosed
EE,RWSS,GJP
EE,RWSS,GJP
CONSTRUCTION OF 200 KL OGR IN CONNECTION WITH PWS TO
2026_RWSS_133809_1
SERWSSGJP- 04/ 2026-27
National Competitive Bid
Civil Works - Water Works
Percentage
EE, RWSS, GJP
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,740
Yes
EE,RWSS,GJP
30 Jun 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
30 Jun 2026 - 8 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil in excavation of foundation with in 50m initial lead & 1.50m initial lift including rough dressing & breaking clods to max 5cm to 7 cm & layers not exceeding 0.30mtr. in depth & as per direction of Engineer-in charge.1st depth of 1.5m | 1 | cum | - | - |
| 2 | Supplying all labour T&P materials for Filling foundation and plinth with sand well watered and rammed including all cost, conveyance,taxes,royality etc.complete. | 1 | Cum | - | - |
| 3 | Supplying all labour T&P materials providing cement concrete (1:3:6)) with 40mm HBG metals including cost, conveyance & royalty of materials etc. all complete. | 1 | Cum | - | - |
| 4 | Supplying all labourmT&P, materials for R.C.C. work of M-30 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying .1st floor | - | Cum | - | - |
| 5 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting including cost of materials complete in ground floor. Beam outside and inside.Foundation | - | Sqm | - | - |
| 6 | Providing formwork for concrete with F2 finish for all permanently exposed surfaces not prominently exposed to public view such as in bucket , ogee pier noses other curved surfaces with steel shuttering plates including supply of rigid tie & supports with all labour ,materials & T&P complete including foinishing complete as directed by engineer-in-charge | 1 | Sqm | - | - |
| 7 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling then after casting including cost of materials complete in ground floor. Beam outside and inside | 1 | Sqm | - | - |
| 8 | Roof slab Top Slab(Shell Roof) | - | Sqm | - | - |
| 9 | Supplying,fitting & placing un-coated HYSD bar reinforcement complete including cost of binding wire HYSD bar, conveyance charges etc complete and as per direction of Engineer-in-charge. | 1 | Qntl | - | - |
| 10 | Supplying all labour, T&P materials providing 20mm thick cement plastering in CM(1:4) including cost, conveyance & royalty of materials.. | 1 | Sqm | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
dtcnrwss.pdf
Tender Documents • 1.01 MB
BOQ_598937.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .