| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹8.0 L+₹400.78 (0.05%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹8.0 L+₹801.56 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.0 L
EMD Value
₹8,100
Closing Date
14 Sept 2026, 12:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Vikash Khand Dobhi Bardiha Mode Ke Pass Naitional Highway Per Ismriti Dwar Ka Nirmarn At Dist. Jaunpur
2026_MSME_1183665_7
1083/EE4/26-27
Open Tender
Miscellaneous Works
Percentage
90 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineering UPSIC KANPUR
₹8,100
23 Sept 2026
9 Sept 2026
14 Sept 2026
9 Sept 2026
14 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in (2.1.1) depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:ll kinds of scil. 0 to 0.30 M DSR 2.6.1 | 16 | Cumt | 298.45 | ₹4,775.2 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 ( 1 cement : 5 coarse sand ( zone III ) : 10 graded stone aggregate 40mm (nominal size)) DSR 4.1.10 | 1.2 | Cumt | 4,921.54 | ₹5,905.85 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand ( zone III ) : 3 graded stone aggregate 40mm (nominal size)) DSR 5.1.2 | 9.19 | Cumt | 6,308 | ₹57,970.52 |
| 4 | Steel Reinforcement for RCC work including Straightening, cutting, bending, placing in position and binding all complete upto plinth level:
Thermo Mechanicallt Treated bars of grade FE-500D A/R (DSR 5.22.6) | - | - | - | - |
| 5 | 2% of RCC Quantity | 1,082.24 | Kgs | 81.43 | ₹88,126.8 |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes (DSR 10.16.1) | 2,940.87 | Kgs | 142.88 | ₹4,20,191.51 |
| 7 | Add crane charges for hoisting in position with driver and staff for vertical post (DSR 0028) | 1 | Day | 15,000 | ₹15,000 |
| 8 | Providing Retro-reflective regulatory sign board ................complete item DSR 16.60.1 | 30.6 | Sqm | 7,763.68 | ₹2,37,568.61 |
| 9 | Centering and shuttring including strutting , propping etc and removal of form work for :DSR 5.9.1 | - | - | - | - |
| 10 | Base of column Footings | 3.23 | Sqm | 288.23 | ₹930.98 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_2226517.xls
BOQ • 1.24 MB
TermsandConditionMarketing.pdf
Tender Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .