Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.6 LAccepted-AOC C O SRI HANUMAN PRASAD BAJAJ WARD NO 02 U T ROAD P O DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | L1 | Accepted-AOC Awarded | |
| 2 | L1₹86.6 LRejected-Finance VILL NIZ KAURBAHA P O BARGHULI P S TAMULPUR BAKSA BTAD ASSAM PIN 781367 | BAKSA | ASSAM | 781367 | L1 | Rejected-Finance Not Admitted | |
| 3 | L1₹86.6 LRejected-Finance | L1 | Rejected-Finance Not Admitted | |
| 4 | L1₹86.6 LRejected-Finance WARD NO 4 TANGLA TOWN P O P S TANGLA DIST UDALGURI ASSAM | TANGLA | UDALGURI | ASSAM | L1 | Rejected-Finance Not Admitted | |
| 5 | L1₹86.6 LRejected-Finance | L1 | Rejected-Finance Not Admitted |
Tender Value
₹96.2 L
EMD Value
₹1.9 L
Closing Date
11 Jan 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer,(MI),Assam
O/o Chief Engineer,(Irrigation),Assam
Rangapanijan Flow IScheme under RIDF-XXVI(NABARD) for the year 2020-21 under Suklai-Serfang-Goreswar Division(Irrigation) Goreswar
2021_ID_23694_1
NIT NO. 08(RIDF-XXVI,NABARD) 2021-22 Date 08.12.20
Open Tender
Civil Works
Item Rate
180 days
Goreswar
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
₹1.9 L
Yes
8 Feb 2022
14 Dec 2021
12 Jan 2022
14 Dec 2021
11 Jan 2022
15 Dec 2021
180 days
Amount
Construction of Diversion Channel, closing Bunds and Blind Dam
Item No. 1: Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M. In ordinary Soil
Item No. 2 :Construction of whole bamboo single pallasiding withmatured jati bamboo post of 6 cm to 7.5 cm dia fixed15 cm clear apart 1.2 M to 1.5 M above ground and 1 M to 1.20 M below ground with jati bamboo struts placed 1.2 M to 1.5 M apart tied with galvanized wire with 16 G to 18 G with three rows of horizontal half jati bamboo double kamies fixed with 16 G to 18 G, complete asdirected..
IItem No. 3: Supply and laying of cement bags filled with sand/ earth (as locally available) including stitching the mouth, laying, fixing in position as directed complete with supply of bags, sutlies etc, all complete as directed.
IItem No. 4: Earthwork in filling in canal embankment, approach road, afflux bund, guide bund etc. to the designed section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia. and uprooting roots and stumps from the seat of embankment and borrow pits area, including breaking clods to not more then 10 mm cube ramming, dressing, watering and roughening the seat of embankment, profiling etc. paying compensation of earth borrowed from private land if any, lead upto 30 M and lift upto 1.5 M complete as directed.
Construction of Head Works
Item No. 1 : Cutting jungles and trees upto 50 cm girth including uprooting roots and stumps and removing them from site of work etc, complete as directed.
Item No. 2 :Earthwork in excavation in foundation of structures bymeans of Hydraulic Excavator in all soils including mud,silt, sandy clay from the river bed, etc, including clearing the side, dressing, etc. and removing the earth by loading to dumpers for further carriage to a safedistance, complete as directed. (0.30 CuM bucket)Without dewatering
Item No. 3 : C work in proportion 1:2:4 in foundation / abutment/ piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 4 : RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirtwall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 5 : Supplying fitting fixing and laying reinforcement (TATA)in position in RCC work including cutting, bending,cranking with two piles 0.91 M (20 BWG) annealed wirehooking tying, complete as directed.
Item No. 6 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 7 : Collection and supply of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complet
Item No. 8 :Collection of hard river gravel, chips of size 6 mm to 20 mm free from dust and dirt from quarry including loading and unloading etc, complete as directed.
Item No. 9 : Supplying and laying of filter materials consisting of sand and river shingles free from dust dirt and other foreign materials and laying in three layers in position asper drawing and specification as directed by the department.
Item No. 10 : Labour charges for spreading hard river shingles / sandgravels to required thickness over approach subway etc.including ramming, dressing the seat before laying thematerials lead upto 30 M and lift 1.50 M, complete asdirected.
Item No. 11 : Vibrating in CC / RCC work with vibrator including local carriage of vibrator etc. complete as directed.
Item No. 12 : 12 mm cement plastering including clearing surface andcuring, complete as directed.
Item No. 13 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No. 14 : Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Item No. 15 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
Item No. 16 : Supply and carriage of hard river gravel of size 13mm to 38 mm including carrying to work site and stacking in measurable stakes etc within a radius of 51 km including loading and unloading and paying of necessary forest royalty etc, complete.
Item No. 17 : Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M, complete as directed.
Item No. 18 : Earthwork in back filling of structures, obtained fromoutside borrow pits filling in 15 cm layers, ramming,dressing, watering, including paying compensation ofland if any (with lead up to 30 M and lift 1.5 M).
Item No. 19: Cost of dewatering from river bed for C.C works and earthwork with the help of different types of water pumps sets of different H.P including providing all lead and lift at site where necesary and local movement of pump sets, hire charge, labour charge, fuel , lubricants etc.complete as directed.
Item No. 20: Supplying, fabricatimg fitting and fixing the steel gates of cross and head regulator as per design and drawing and specifications including supplying, fitting and fixing operating platform including supplying steel beam, channel sections, rubber seal etc. Embedded party where necessary and manual operated hoisting equipments including carriage of materials to work site complete as directed.
Construction of Afflux Bund , Guide Bunds and Protection works
Item No. 1 : Earthwork in cutting in river bank etc. to the design section and grade and removing the spoils to a safe distance including cutting, uprooting and removing trees upto 15 cm dia, uprooting and removing roots and stumps etc, including excavating the earth boulder sausages of 1.00 M dia, 50 cm under river bed shape, size and grade etc. with all lead and lift, complete as directed.
Item No. 2 : Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Item No. 3 : Construction of 1.00 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed. (ii) With river boulder
Item No. 4 : Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Item No. 5 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
Construction of Approach Road
Item No. 1 : Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Item No. 2 : Supply and carriage to the site sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Item No. 3 : Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as
Construction of RCC Canal
Item No.1: Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. (A) In ordinary soil
Item No. 2: Soling in foundation at all level including filling interstics ramming etc. complete as directed and as specified thickness with 9 cm brick on flat including sand packing
Item No. 3: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No. 4: R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed.(Shuttering, scaffolding cost will be paid separately).
Item No. 5:Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCCworks, completeasdirected.(Measurement to be taken on the face area timbered) ( C ) Shuttering (Column)
Item No. 6 :12 mm cement plastering including clearing surface and curing, complete as directed.
Item No. 7: Supplying, fitting, fixing and lying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Construction of Earthen Canal
Item No. 1:Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
construction of Outlet
Item No. 1: Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed. (A) In ordinary Soil
Item No. 2: Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including
Item No. 3: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard river shingles of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 4: 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed.
Item No 5 :- 12 mm plastering including clearing surface and curing complete as directed in proportion 1:3
Item No. 6 :- Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2 ), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately).
Item No.7 : Neat cement finishing 3 mm thick with cement slurry prepared by mixing 27.50 Kg of fresh cement in appropriate quantity of clean water to cover 10 (ten) SqM of work area and to give a smooth and hard finishing including rounding corners, brooming, curing etc, complete as directed.
Item No 8:- Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Construction of Signboard
Supply of sign board made of 1.60 mm thick MS ironn sheet fitted with steel frame of size of size 1.05 m X 0.75 m fixed with 2 nos 50mm dia GI ( medium) pipes 2.10 m above and 0.60 m below ground fited with C.C workin prop 1:3:6 and size 0.45m X 0.45m X 0.60m below ground including painting with approved paint inluding writing letters complete as directed.
suren ch baro
M/S REEVRAJ ENTERPRISE
ABDUL SAMAD CHOUDHURY
ASHOK KUMAR BAJAJ
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .