Tender Value
₹97.0 L
EMD Value
₹1.9 L
Closing Date
27 Aug 2026, 3:00 pm3d left
Executive Engineer, CD-XIII. I and FC Deptt.
Executive Engineer, CD-XIII. I and FC Deptt.
Beautification of Water Body Bearing Kh. No. 77 in village Bakkargarh in N.G. Block.
2026_IFC_297338_1
EE/CD-XIII/Acs./2026-27/NIT No.42
Open Tender
Civil Works
Works
90 days
Najafgarh
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹1.9 L
20 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 2,430 | Sqm | 7.67 | ₹18,638.1 |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 973 | Sqm | 23.85 | ₹23,206.05 |
| 3 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 8,422.96 | Kg | 91.51 | ₹7,70,785.07 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 243 | Sqm | 206.5 | ₹50,179.5 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 48 | Cum | 7,608.36 | ₹3,65,201.28 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 7,274 | Kg | 60.26 | ₹4,38,331.24 |
| 7 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 1,420 | Sqm | 116.43 | ₹1,65,330.6 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 142 | Cum | 4,768.03 | ₹6,77,060.26 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : "1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). | 142 | Cum | 5,739.38 | ₹8,14,991.96 |
| 10 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :25 mm thick | 142 | Sqm | 1,233.06 | ₹1,75,094.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.60 MB
NIT42.pdf
Tender Documents • 15.58 MB
BOQ_396066.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].