Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹7.9 LAdmitted-Finance | ₹7.9 L | L2 | Admitted-Finance |
| 3 | L3₹8.4 LAdmitted-Finance 97 19 JWALA HERI PASCHIM VIHAR NEW DELHI 110063 | WEST | DELHI | 110063 | ₹8.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ANUJ COOL WORKS L2 | RefAir Technical Services L3 | RK ELECTRICALS L1 |
|---|---|---|---|---|---|---|
| 1.00Comprehensive maintenance contract including all parts and spares such as gas, electronic circuit, all filter, repairing/ replacement of compressor, fan motor, condensor fan motor, LED display etc. complete in all respect, required for smooth functioning of A/C system. As per scope of work attached. NOTE- (1) Tenderer are requested to check physically the precision AC plant before quoting the rate. Rate quoted inclusive all taxes. (2) On award of work, the plant will be handed over to contractor in as it is condition. | ||||||
| 1.10 | 5 TR precision AC plant (Qty- 08 No.) (Vertive & Bluebox make) | 12 | Months | 13,100 ₹1.6 L | 13,000 ₹1.6 L | 8,400 ₹1.0 L |
| 1.20 | 10 TR precision AC plant (Qty- 05 No.) (Vertive & Danco Happel make) | 12 | Months | 13,100 ₹1.6 L | 16,250 ₹1.9 L | 9,400 ₹1.1 L |
| 1.30 | 12 TR precision AC plant (Qty- 01 No.) (Vertive make) | 12 | Months | 13,100 ₹1.6 L | 3,900 ₹46,800 | 5,000 ₹60,000 |
| 1.40 | 16 TR precision AC plant (Qty- 05 No.) (Bluestar make) | 12 | Months | 13,100 ₹1.6 L | 26,000 ₹3.1 L | 9,000 ₹1.1 L |
| 1.50 | 16 TR Capacity AC plant (Qty- 01 Job) (11 TR x 6 with 3 nos. AHU) (Voltas & Edgetech make) | 12 | Months | 13,100 ₹1.6 L | 10,890 ₹1.3 L | 13,710 ₹1.6 L |
Tender Value
₹8.9 L
EMD Value
₹18,000
Closing Date
19 Jan 2026, 2:00 pmClosed
Director NPL
CSIR-NPL (W and S Division)
Comprehensive annual maintenance contract of existing precision AC plant in various lab at NPL Campus.
2026_CSIR_261894_1
04/0306/2025-WS
Open Tender
Electrical Works
365 days
CSIR-NPL
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Director NPL
₹18,000
3 Feb 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
Comprehensive maintenance contract including all parts and spares such as gas, electronic circuit, all filter, repairing/ replacement of compressor, fan motor, condensor fan motor, LED display etc. complete in all respect, required for smooth functioning of A/C system. As per scope of work attached. NOTE- (1) Tenderer are requested to check physically the precision AC plant before quoting the rate. Rate quoted inclusive all taxes. (2) On award of work, the plant will be handed over to contractor in as it is condition.
5 TR precision AC plant (Qty- 08 No.) (Vertive & Bluebox make)
10 TR precision AC plant (Qty- 05 No.) (Vertive & Danco Happel make)
12 TR precision AC plant (Qty- 01 No.) (Vertive make)
16 TR precision AC plant (Qty- 05 No.) (Bluestar make)
16 TR Capacity AC plant (Qty- 01 Job) (11 TR x 6 with 3 nos. AHU) (Voltas & Edgetech make)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 29.92 MB
Tendernotice_2.pdf
PDF • 1.11 MB
BOQ_303145.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid