| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance 48 A BOLDENPURAM 3RD STREET TUTICORIN 628003 TAMIL NADU | TUTICORIN | TAMIL NADU | 628003 | L1 | Accepted-Finance L1 bidder | |
| 2 | L2₹1.6 L+₹27,085.77 (20.1%)Accepted-Finance | L2 | Accepted-Finance L2 bidder | |
| 3 | L3₹1.8 L+₹44,241.57 (32.8%)Accepted-Finance | L3 | Accepted-Finance L3 bidder |
| Sl No | Description | Qty | Unit | SUNTECH L1 | KARUNAKARAN L2 | GANDHI LATHA L3 |
|---|---|---|---|---|---|---|
| 1.00Improvement works such as with allied Civil works | ||||||
| 1.01 | Dismantling of existing Brick in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 2.4 | Cum | 230 ₹552 Lowest | 334 ₹801.6 | 330 ₹792 |
| 1.02 | ORDINARY SOIL (SS20B) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 4.75 | Cum | 52 ₹247 Lowest | 97 ₹460.75 | 100 ₹475 |
| 1.03 | Supplying and filling M-sand for foundation, with well watering and consolidation as per the standard specification etc, complete. | 0.6 | Cum | 650 ₹390 Lowest | 1,972 ₹1,183.2 | 1,970 ₹1,182 |
| 1.04 | Providing Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete. | 0.9 | Cum | 5,600 ₹5,040 Lowest | 6,000 ₹5,400 | 6,400 ₹5,760 |
| 1.05 | Providing Plain Cement Concrete 1:2:4 using 20mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete. | 0.25 | Cum | 7,010 ₹1,752.5 | 7,000 ₹1,750 Lowest | 7,500 ₹1,875 |
| 1.06 | Plastering with cement mortor 1:3, 20mm tk. Over flooring concrete portion including cost of all materials, labour needed safety arrangements, curing all lead, lift etc. complete | 14.55 | Sqm | 465 ₹6,765.75 | 450 ₹6,547.5 Lowest | 650 ₹9,457.5 |
| 1.07 | Supplying and fixing Good quality of CPVC (Chlorinated Poly Vinyl Chloride) pipe (Lesser pressure rating with lesser pipe thikcness) Standard dimension ratio 13.50in position of 25mm dia. CPVC pipe from the approved manufacturer etc., confirming to IS 4985 of 1968, 4984 of 1970 including cost of all special fixtures labour, lead, lift etc., complete. | 71.5 | RM | 352 ₹25,168 Lowest | 430 ₹30,745 | 450 ₹32,175 |
| 1.08 | Supplying and fixing of PVC Screw Down Tap Heavy Type D10 dia, labour charges for fixing ,lead &lift etc, complete. | 8 | Nos | 55 ₹440 Lowest | 116.5 ₹932 | 120 ₹960 |
| 1.09 | Supply and fixing of 500 litre capacity PVC tank of approved quality [ white colour Three layer ] including cost of all materials labour,lead,lift,etc,complete. | 1 | No | 5,010 ₹5,010 | 5,000 ₹5,000 Lowest | 5,330 ₹5,330 |
Tender Value
Refer Docs
EMD Value
₹1,793
Closing Date
16 Dec 2025, 2:00 pmClosed
SE/MEDC/METRO/MADURAI
Race Course Road, TNEB Complex, K.Pudur, Madurai
- Improvement Estimate for Fabricating of new tin roof Storage shed for regional oil test lab, laying new OHT with water line for Toilets at SCADA and EE/North office building and removal of existing damaged storage tank at parking area in CE/D/MDU
2025_EB_628213_1
SE/MEDC/METRO/MDU - 013/2025 - 26
Open Tender
Civil Works
Works
Madurai
as in specification
2 documents required · 2 mandatory
₹0
₹1,793
Yes
24 Dec 2025
2 Dec 2025
17 Dec 2025
2 Dec 2025
16 Dec 2025
2 Dec 2025
Amount
Improvement works such as with allied Civil works
Dismantling of existing Brick in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete.
ORDINARY SOIL (SS20B) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B)
Supplying and filling M-sand for foundation, with well watering and consolidation as per the standard specification etc, complete.
Providing Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete.
Providing Plain Cement Concrete 1:2:4 using 20mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete.
Plastering with cement mortor 1:3, 20mm tk. Over flooring concrete portion including cost of all materials, labour needed safety arrangements, curing all lead, lift etc. complete
Supplying and fixing Good quality of CPVC (Chlorinated Poly Vinyl Chloride) pipe (Lesser pressure rating with lesser pipe thikcness) Standard dimension ratio 13.50in position of 25mm dia. CPVC pipe from the approved manufacturer etc., confirming to IS 4985 of 1968, 4984 of 1970 including cost of all special fixtures labour, lead, lift etc., complete.
Supplying and fixing of PVC Screw Down Tap Heavy Type D10 dia, labour charges for fixing ,lead &lift etc, complete.
Supply and fixing of 500 litre capacity PVC tank of approved quality [ white colour Three layer ] including cost of all materials labour,lead,lift,etc,complete.
Supply and fixing of 1000 litre capacity PVC tank of approved quality [ white colour Three layer ] including cost of all materials labour,lead,lift,etc,complete.
Supply and fixing in position of best Indian make white / colour glazed earthenware lipped mouth flat back urinal of best quality and approved make of size 430mm x 260mm x 350mm with GI pipe, 32mm dia bell mouth PVC connection and waste pipe, 15mm dia GI pipe of required length, 15mm dia GM wheel valve, 15mm dia brass nipple 2 Nos., and fixing the urinals in position with necessary TW plugs, clamps, screws, etc., including dismantling masnory and re-doing the same to the original condition, etc., including painting the pipe with two coats of best quality approved synthetic enamel paint over one coat of red oxide primer and checked without any leakage etc. complete complying with standard specifications and as directed by the departmental officers. (The urinal should be got approved by the Executive Engineer before use on works.)
Supplying and fixing of CPVC Control valve (25mm) with accessories complete.
Supplying and fixing tin steel shed with MS angle for frame and coverd by Tin sheet including fabricating charges, accessories.
Fabricationg of MS anlges
Painting with enamel paint over one coat of primary coat including cost of all materials, lead, lift etc complete.
Providing Galvalume colour sheet of size 0.47 mm for sunshades including J bolts & Hooks on roof, Frame, labour, cost of allmaterials, lead, lift etc., complete.
GST for bidders within Tamilnadu
GST for bidders outside Tamilnadu
KARUNAKARAN (BID ID -1534592)
GANDHI LATHA (BID ID -1533169)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_751239.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .