Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.5 L+₹21,000 (9.12%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹2.5 L+₹24,750 (10.7%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹4.5 L+₹2.2 L (96.1%)Accepted-Finance | L4 | Accepted-Finance L4 |
| Sl No | Description | Qty | Unit | TOUSEEF AHMED BAGWAN L3 | SAJID WANI L4 | Kither india power projects pvt ltd L2 | KHALEEK UL REHMAN L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Extraction of 518 No of stumps = 1190 qtls from enumerated old deodar stumps with roots by excavating the soil around the stump through skilled labour in compartments 49K & 50/K Kellar Range of Bhadarwah Forest Division. | 1,190 | Qtls. | 150 ₹1,78,500 | 299 ₹3,55,810 | 100 ₹1,19,000 Lowest | 102 ₹1,21,380 |
| 1.02 | Spiliting of 1190 qtls extracted old deodar stumps to make them carryable for head load carriage through poney wallas. | 1,190 | Qtls. | 100 ₹1,19,000 | 49 ₹58,310 Lowest | 80 ₹95,200 | 60 ₹71,400 |
| 1.03 | Head Load carriage of spilited old deodar stumps 1190 qtls from extraction site to road side (PLP) through ponies. Rate per Quintil/Km. | 1,190 | Qtls. | 50 ₹59,500 | 299 ₹3,55,810 | 60 ₹71,400 | 40 ₹47,600 Lowest |
Tender Value
₹4.2 L
EMD Value
₹8,330
Closing Date
9 Jan 2026, 4:00 pmClosed
DFO Bhadarwah
DFO Office Bhadarwah
BOQ
2026_FD_299824_1
46 of 2025-26 dated 03-01-2026
Open Tender
Agricultural or Forestry
Item Wise
30 days
49-50/K
SBD
2 documents required · 2 mandatory
₹600
DFO Bhadarwah
₹8,330
15 Jan 2026
3 Jan 2026
10 Jan 2026
3 Jan 2026
9 Jan 2026
3 Jan 2026
Amount
Extraction of 518 No of stumps = 1190 qtls from enumerated old deodar stumps with roots by excavating the soil around the stump through skilled labour in compartments 49K & 50/K Kellar Range of Bhadarwah Forest Division.
Spiliting of 1190 qtls extracted old deodar stumps to make them carryable for head load carriage through poney wallas.
Head Load carriage of spilited old deodar stumps 1190 qtls from extraction site to road side (PLP) through ponies. Rate per Quintil/Km.
Kither india power projects pvt ltd (BID ID -2693716)
TOUSEEF AHMED BAGWAN (BID ID -2693808)
SAJID WANI (BID ID -2693831)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_972714.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .