| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹5.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.0 L+₹4,516.79 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,516.79 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹5.0 L+₹4,516.79 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,516.79 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹5.0 L+₹4,516.79 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,516.79 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹5.0 L+₹4,516.79 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹5.0 L+₹4,516.79 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹5,100
Closing Date
19 Sept 2026, 5:00 pmClosed
Executive Officer,Baripada Municipality
Executive Officer,Baripada Municipality
Imp. of BT road from Kanhu Panda house towards Sunil Das Mohapatra house in Ward No.2
2026_ORULB_140655_1
BPDM 7 of 2026-2027
Open Tender
Civil Works - Roads
Percentage
60 days
Baripada Municipality
As per DTCN
3 documents required · 3 mandatory
₹4,000
₹5,100
Yes
21 Sept 2026
9 Sept 2026
21 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning the existing black topped surface incl. removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous. | 1,101.2 | Sqm | 5.46 | ₹6,012.55 |
| 2 | Labour for scraping, cleaning the road surface applying tack coat using 3.0kg of bitumen for 10Sqm. and laying 37.5mm.thick built up spray grouting in one layer using 0.45cum.of 25mm. to 40mm. size BHGCB metal and 12.00kg. of bitumen for 10Sqm.in each layer with 0.12cum.of 12mm.size chips as key stone for 10Sqm.etc.complete. | 148.6 | Sqm | 406.19 | ₹60,359.83 |
| 3 | Providing laying & rolling of 20mm thick permix carpet using0.27cum of 13.2mm to 5.6mm size chips and 14.60kg penetration grade of bitumen for 10sqm including hand packing to proper camber and consolidation with PRR , hot mix plant,bitumen tar boilers and all other T&P & all cost materials, labour etc, including cost of bitumen complete. | 1,249.8 | Sqm | 249.57 | ₹3,11,912.59 |
| 4 | Providing laying & rolling of 6mm thick precoated seal coat Type-B by using 0.06cum of 6mm chips and down graded as per sieve analysis and with 6.8 kg of bitumen for 10sqm including hire charge of P.R.R. bitumen mixture, tar boler etc &all cost materials,labour including cost of bitumen complete. | 1,249.8 | Sqm | 90.22 | ₹1,12,756.96 |
| 5 | Binding road surface 6mm thick with good quality sand including, cost, conveyance, royalities, taxes, duties, labour T & P etc. complete as dirceted by the E.I.C. | 1,249.8 | Sqm | 7.81 | ₹9,760.94 |
| 6 | Cost of Photo & Signboard | 1 | Full set | 1,062 | ₹1,062 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.32 MB
BOQ_608890.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .