| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹2.0 L+₹42,768.34 (27.2%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | L3₹2.4 L+₹80,721.60 (51.3%)Rejected-AOC | L3 | Rejected-AOC Found 3rd Highest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
17 Nov 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER, EDC, BANDA
Chilla Road, Banda
Electrification of 02 Nos. STWs under EDD, Banda
2020_DVVNL_518565_2
52/SE/EDCB/2020-21
Open Tender
Electrical Works
Item Rate
30 days
BANDA
As per annexured
2 documents required · 2 mandatory
₹1,180
DVVNL
₹2,000
O/O SE, EDC, BANDA
19 Aug 2021
5 Nov 2020
17 Nov 2020
5 Nov 2020
17 Nov 2020
5 Nov 2020
13 Nov 2020
Amount
The work of ERECTION OF 11 KV LINES & 63 KVA SUB-STATIONS for electrification of STW no. 49 Vill. Bilgaon (Mahua) & 249 Vill. Lauli-Tikamau (Akohala Purwa) (Bisanda) fed from 33/11 KV Sub-Station, HATHAURA/BISANDA under FULL DEPOSIT SCHEME Year 2020-21 at EDSD, BABERU (BANDA) as per passed package no. 06 & 07/BR/DEP./2020-21 under EDD, BANDA, including safe carriage of all required material from E.S.C., BANDA to work site and also cartage of old/damaged scraped line material from work site to E.S.C., BANDA, alongwith its loading, unloading & dragging at the respective ends, details of the work as given below :-
Safe cartage of 8.5 Mtr. long PCC poles
Safe cartage of line material
Safe cartage of 63 KVA Transformer
Erection & grouting of single support on 8.5 Mtr. long PCC poles, including complete HT/LT fittings as per RESSPO manual & direction of engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each) of best quality material.
Erection & grouting of double pole structure on 8.5 Mtr. long PCC poles, including complete HT/LT fittings as per RESSPO manual & direction of engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each) of best quality material.
Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material.
Erection & Fixing of earthing rod complete as per RESSPO manual.
Laying, sagging, stringing, binding and jumpering of new ACSR Weasel Conductor on the erected poles in 11 KV HT/LT lines as per RESSPO manual & direction of engineer incharge.
Laying, stringing, binding and termination of PVC Cable on the erected D/P as per RESSPO manual & direction of engineer incharge.
Erection & fixing of 11 KV Danger Board with fitting of all accessories as per RESSPO manual.
Installation of 63 KVA Transformers on the newly erected D/P structure in proper alignment as per direction of Engineer incharge/RESSPO manual.
Erection & fixing of Top Channel with fitting of all accessories as per RESSPO manual.
Erection & fixing of Dropper Channel with fitting of all accessories as per RESSPO manual.
Erection & Fixing of MS Base Angle with fitting of all accessories as per RESSPO manual.
Erection & fixing of T-Off Channel with fitting of all accessories as per RESSPO manual.
M/s. ACTIVE AUTOMOBILE, BEHIND ZILA PARISHAD, BANDA
M/s. SONU ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .