| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance | ₹11.6 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹12.0 LAccepted-Finance | ₹12.0 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | C.S.R ENTERPRISES | NSR AND COMPANY |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all material, labours, lead, lift, safety measures, etc. complete. | 72 | Rm | 1,08,720 ₹1.3 L | 1,04,400 ₹1.2 L |
| 2.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete. | 5.35 | M3 | 26,857 ₹31,691.26 | 26,482.5 ₹31,249.35 |
| 3.00 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 60.03 | M2 | 3,121.56 ₹3,683.44 | 2,821.41 ₹3,329.26 |
| 4.00 | Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc., complete. | 1.5 | M3 | 592.5 ₹699.15 | 570 ₹672.60 |
| 5.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 74.1 | M2 | 963.3 ₹1,136.69 | 741 ₹874.38 |
| 6.00 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer including cost of labour, Lead, lift, T&P etc., complete. | 255.5 | M2 | 14,308 ₹16,883.44 | 13,541.5 ₹15,978.97 |
| 7.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc., complete. | 40.2 | M2 | 45,426 ₹53,602.68 | 44,220 ₹52,179.60 |
| 8.00 | Providing RCC 1:1/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all material, labours, lead, lift, curing, etc. complete excluding cost of reinforcement and form work. | 2.8 | M3 | 30,520 ₹36,013.60 | 28,560 ₹33,700.80 |
| 9.00 | Supplying & providing RTS /Ms rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc., complete. | 168 | Kg | 16,800 ₹19,824 | 15,960 ₹18,832.80 |
| 10.00 | Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, Labours, lead, curing, etc. complete | 2.5 | M3 | 17,050 ₹20,119 | 16,750 ₹19,765 |
Tender Value
Refer Docs
EMD Value
₹10,100
Closing Date
6 Mar 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Renovation and Repair Works to Type 4 Quarters Block No. 5 to enhance the stability and aesthetic environments of the Quarters Building at Analmin Nagar
2026_EB_661364_1
CE SE C TTPS Spec.No. 422 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,100
Yes
9 Mar 2026
19 Feb 2026
7 Mar 2026
19 Feb 2026
6 Mar 2026
19 Feb 2026
Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all material, labours, lead, lift, safety measures, etc. complete.
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete.
Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc., complete.
Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete.
Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer including cost of labour, Lead, lift, T&P etc., complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc., complete.
Providing RCC 1:1/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all material, labours, lead, lift, curing, etc. complete excluding cost of reinforcement and form work.
Supplying & providing RTS /Ms rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc., complete.
Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, Labours, lead, curing, etc. complete
plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete
Plastering with CM 1:5, 20mm thick for brick wall surface including cost of all materials, labour, lead, lift, curing etc. complete
Plastering with CM 1:5, 20mm thick with Nitobond AR mixed in cement mortor at 250ml/bag of cement including cost of all materials, labour, lead, lift, curing etc. complete
Fabrication of erection of boiler tubes and welding the boiler tubes with M.S. plates at bottom rate including cost of fabrication charges, cutting charges, oxy acetylene gas, welding rods, lead, lift etc., complete. (Boiler tubes and MS plates will be supplied at free of cost)
Supplying and fixing Cuddapah slab for fixing over the water tank roof slab including cost of all materials, labour, lead, lift etc., complete.
Providing Terrace tiles of single 200 x 230 x 20mm tiles using CM 1:3, mixed with crude oil 1% by weight of cement and pointing with same oiled mortar etc, including cost of all materials, lead, labours, lift curing etc., complete.
Providing Plinth P.C.C 1:4:8 using OP cement with 20mm to 12mm chips machine crushed HBG metal including cost of all materials, labour, lead, lift, Curing, etc., complete.
Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete.
Painting old wall surface with two coat of ready mixed plastic emulsion (interior walls) of first class quality paint and approved colour without priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc., complete.
Painting old wall surface with two coat of Asian make ACE exterior paint (or) equivalent over the existing wall surface over a priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc., complete.
Painting two coats with ready mixed enamel paint for the old wooden doors, windows including cost of all materials, through cleaning of surface, labours, lead, lift curing, etc. complete.
Replacing the damaged Indian Water Closet of size 450mm white glazed earthware with ‘P’ trap with sand cushion and forming flooring alround the water closet using 20mm brick jelly in lime concrete and plastering with CM 1:3, 20mm thick including cost of all materials, labour, lead, lift etc. complete.
Supplying and fixing 6Kg/cm2 PVC pipe for sanitary arrangements of approved quality size of 110mm dia and 75mm dia including cost of specials, all other materials required labour, lead, lift, etc., complete. (a)110mm dia PVC pipe
(b)75mm dia PVC pipe
Supplying and providing GI pipe of various size in water tanks as delivery/drain pipes including dismantling brick work, fixing the GI pipe inclusive of cutting and threading and finishing the hole with PCC 1:1.5:3 concrete wherever necessary including cost of all materials, labour, lead, lift etc, complete. (a) 25mm dia GI Pipe
(b)32mm dia GI pipe
Supplying and fixing in position of various size in GM Gate valve / Wheel valve of heavy duty by replace the existing damaged wheel valve including cost of valve, labour, Lead, lift, etc, complete (a) 25mm dia Wheel Valve
(b)32mm dia Wheel Valve
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_793802.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid