| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.3 L+₹1,118.50 (0.13%)Rejected-AOC | ₹8.3 L+₹1,118.50 (0.13%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Viya Enterprises L2 | S.P BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 6 | M3 | 129 ₹774 | 128 ₹768 Lowest |
| 2.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 5 | M3 | 5,072 ₹25,360 | 5,071 ₹25,355 Lowest |
| 3.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 14 | M3 | 572 ₹8,008 | 570 ₹7,980 Lowest |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 40 | M3 | 128 ₹5,120 | 125 ₹5,000 Lowest |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 14 | M3 | 5,962 ₹83,468 | 5,960 ₹83,440 Lowest |
| 6.00Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | |||||
| 6.01 | Drain | 187 | M2 | 534 ₹99,858 | 532 ₹99,484 Lowest |
| 6.02 | Slab bottom | 6 | M2 | 1,181 ₹7,086 | 1,180 ₹7,080 Lowest |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 24 | M3 | 6,722 ₹1,61,328 | 6,721 ₹1,61,304 Lowest |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 41 | M2 | 309 ₹12,669 | 305 ₹12,505 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
3 Dec 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain, Providing Covering Slab and Maintenance and Repair Works to the Cement Concrete Flooring at Anna Street, Ramasamy Pillai Street, Nadesa Mudhaliyar Street, Thiruvalluvar Street and Maa.Poo.See. Street in Ward no 36
2025_MAWS_624559_8
E6/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
11 Apr 2026
20 Nov 2025
4 Dec 2025
21 Nov 2025
3 Dec 2025
21 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.32 MB
Additional Documents
Additional Documents • 0.26 MB
Tender Documents
Tender Documents • 0.66 MB
BOQ
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .