Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.0 LAccepted-AOC BOOTH NO 102 SEC 2 UE KURUKSHETRA HARYANA 136118 | KURUKSHETRA | HARYANA | 136118 | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹22.0 L+₹4.0 L (22.5%)Rejected-Finance | 2 | Rejected-Finance Reject |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
10 Nov 2020, 3:00 pmClosed
Executive Engineer
Executive Engineer, Water Services Division, Kurukshetra.
Laying CC paver block M-35 at Canal Rest House at RD 15800 of Thanesar Disty.
2020_HRY_149748_1
10.11.2020/7
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
Kurukshetra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹36,000
Yes
5 Feb 2021
3 Nov 2020
10 Nov 2020
3 Nov 2020
10 Nov 2020
3 Nov 2020
Amount
Earth work in excavation in foundation, trenches, etc. in all kinds of soils not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres (HSR 6.6)
Shuttering for faces of concrete foundations and foundation beams (vertical or battering) (HSR 9.13)
Earth work in excavation in filling in all kind of soil with averge lead of 1.0 km.HSR 5.2(b)+4.1
Cement concrete 1:4:8 with stone aggregate 20mm nominal size in foundation and plinth HSR 10.38
Cement concrete 1:2:4 with 20mm stone aggregrate in foundation and plinth (HSR 10.41)
Extra for laying and watering the earth in 25CM layer and dressing HSR 6.2(g)(i)(ii)(iii)(v)
Preparing watering and ramming surface for laying concrete on horizontal portion HSR10.122(a)(I)
First class Brick work laid incement sand morter 1:4 in foundation and plinth .HSR No.11.4
Providing and laying 60 mm thick paving block of all shape and colour in design mix M. 35 over a bed of 25 mm thick fine sand complete in all respect . H.S.R No. 10.158 A&C Slip No. 20 dated 22.03.2018
15mm thick cement plaster 1:3 (HSR 15.9)
Cement concrete 1:2:4 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centring and shuttering, laid in position, complete in all respect (HSR 10.82)
Steel reinforcement TMT Bars FE-500 EQR/FE-500D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, handers and annealed steel wire etc. and placing in position complete in all respect for all heights/depths/storeys/basements etc. NOTE:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work excluding overlaps. Wastage, overlaps, coupling, welded joints, spacer bars, chairs, stays and annealed steel wire or other methods for binding and placing shall not be measure and cost of these items shall be deemed to be included in the rates for reinforrcement. (HSR 18.22)
Gian Sharma
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .