| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.2 Cr+₹6.2 L (5.65%)Rejected-Finance | ₹1.2 Cr+₹6.2 L (5.65%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
2 Jul 2020, 3:00 pmClosed
Project Director
DRDA, Collectorate, Erode
Erode District PMGSY Periodic Renewal of PMGSY roads 5 Nos. Group No. TN 12 03 R Perundurai Block OLD PACKAGE NO. TN 12 70,80,14 under Incentive Grant 2019 20
2020_RDTN_94839_1
Roc No 11587/2020/TU4 Dt. 12.06.2020
Open Tender
Civil Works - Roads
Item Rate
120 days
Perundurai Block
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹2.2 L
DRDA, Collectorate, Erode
19 Apr 2021
19 Jun 2020
2 Jul 2020
19 Jun 2020
2 Jul 2020
24 Jun 2020
24 Jun 2020
Amount
Clearing the Scrub jungle including all labour charges for burrying and burning etc. Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees cut earlierand disposal of unserviceable materials to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. Km 3/0 - 4/0
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc, complete. As per SS20 A Km Km 3/0 - 4/0
Providing and laying cost and conveyance of gravel from approved sources to work site includeing labour for spreading, watering and compacting by prower roller to achive the required Proctor density at 100% compaction at optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidenta; charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC HBG metal
Applying Tack coat over BT surface (not treated with primer) using 3 kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual workspot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification Km 0/0 - 12/178
PREMIX CARPET Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and type C as per technical specifications clause 510
Maintenance of the existing pmgsy Name board, Logo board, New board for periodical maintance
Citizen information board painting
Nameboard painting
logo board painting
sign board painting
Provision for HM stones
Clearing the Scrub jungle including all labour charges for burrying and burning etc. Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees cut earlierand disposal of unserviceable materials to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. Km 0/0 - 2/0
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc, complete. As per SS20 A Km Km0/0 - 2/0
Providing and laying cost and conveyance of gravel from approved sources to work site includeing labour for spreading, watering and compacting by prower roller to achive the required Proctor density at 100% compaction at optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidenta; charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 50mm using 45mm IRC HBG metal
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC HBG metal
Applying Tack coat over BT surface (not treated with primer) using 3 kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual workspot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification Km Km 0/0 - 2/0
PREMIX CARPET Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and type C as per technical specifications clause 510
Maintenance of the existing pmgsy Name board, Logo board, New board for periodical maintance
Citizen information board painting
Nameboard painting
logo board painting
sign board painting
Provision for HM stones
Clearing the Scrub jungle including all labour charges for burrying and burning etc. Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees cut earlierand disposal of unserviceable materials to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. Km 0/0 -1/0
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc, complete. As per SS20 A Km Km 0/0 - 1/0
Providing and laying cost and conveyance of gravel from approved sources to work site includeing labour for spreading, watering and compacting by prower roller to achive the required Proctor density at 100% compaction at optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidenta; charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 50mm using 45mm IRC HBG metal
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC HBG metal
Applying Tack coat over BT surface (not treated with primer) using 3 kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual workspot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification Km 0/0 - 12/178
PREMIX CARPET Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and type C as per technical specifications clause 510
Maintenance of the existing pmgsy Name board, Logo board, New board for periodical maintance
Citizen information board painting
Nameboard painting
logo board painting
sign board painting
Clearing the Scrub jungle including all labour charges for burrying and burning etc. Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees cut earlierand disposal of unserviceable materials to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. Km 0/0 - 1/6
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc, complete. As per SS20 A Km Km 0/0 - 1/6
Providing and laying cost and conveyance of gravel from approved sources to work site includeing labour for spreading, watering and compacting by prower roller to achive the required Proctor density at 100% compaction at optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidenta; charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 50mm using 45mm IRC HBG metal
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC HBG metal
Applying Tack coat over BT surface (not treated with primer) using 3 kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual workspot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification Km 0/0 - 12/178
PREMIX CARPET Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and type C as per technical specifications clause 510
Maintenance of the existing pmgsy Name board, Logo board, New board for periodical maintance
Citizen information board painting
Nameboard painting
logo board painting
Provision for HM stones
Clearing the Scrub jungle including all labour charges for burrying and burning etc. Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees cut earlierand disposal of unserviceable materials to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. Km 0/0 - 1/6
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc, complete. As per SS20 A Km Km 0/0 - 1/6
Providing and laying cost and conveyance of gravel from approved sources to work site includeing labour for spreading, watering and compacting by prower roller to achive the required Proctor density at 100% compaction at optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidenta; charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 50mm using 45mm IRC HBG metal
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC HBG metal
Applying Tack coat over BT surface (not treated with primer) using 3 kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual workspot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification Km 0/0 - 12/178
PREMIX CARPET Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and type C as per technical specifications clause 510
Maintenance of the existing pmgsy Name board, Logo board, New board for periodical maintance
Citizen information board painting
Nameboard painting
logo board painting
sign board painting
Provision for HM stones
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R . MURALIDHARAN
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .