Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.1 L+₹275 (0.07%)Rejected-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | ₹4.1 L+₹275 (0.07%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | PERUMAL L1 | SHARVESH AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning the heavey jungle using Masdoor C1 etc., complete | 6 | L | 690 ₹4,140 Lowest | 700 ₹4,200 |
| 2.00 | Dismantling the damage brick work in cement motor etc., complete | 4 | M3 | 330 ₹1,320 Lowest | 330 ₹1,320 Lowest |
| 3.00 | Supply and fabrication of RTS rods with various dia including cost of bending, tying conveyance of all materials to work site etc., complete | 2 | Q | 9,540 ₹19,080 Lowest | 9,540 ₹19,080 Lowest |
| 4.00 | Supply and erecting shuttering including necessary supports for plane surfaces such as RCC plinth beam etc., completed complying with standard specification and as directed | 17 | M2 | 1,420 ₹24,140 Lowest | 1,425 ₹24,225 |
| 5.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 2 | M3 | 9,740 ₹19,480 Lowest | 9,740 ₹19,480 Lowest |
| 6.00 | Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") including cost of materials and labour charges etc., as per standard specification - 1m3 | 12 | M3 | 7,070 ₹84,840 | 7,000 ₹84,000 Lowest |
| 7.00 | Plastering in Cement Mortar 1:5 mix 12mm thick including cost and conveyance of all materials to work site etc., complete as per specifications. | 135 | M2 | 310 ₹41,850 Lowest | 310 ₹41,850 Lowest |
| 8.00 | Supply and fixing of Mild steet hollow pipe section in various sizes including cost of conveyance of all materials to work site etc., complete | 270 | kg | 115 ₹31,050 Lowest | 115 ₹31,050 Lowest |
| 9.00 | Painting with first quality emulsion paint two coats over a priming coat including through cleaning, scrapping, removal of dust and including necessary plaster of paris putty works wherever required etc., completed. | 502 | M2 | 290 ₹1,45,580 Lowest | 290 ₹1,45,580 Lowest |
| 10.00 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. (Sl.No.368) | 19 | M2 | 165 ₹3,135 Lowest | 165 ₹3,135 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
3 Dec 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Improvement Works to the Park at Periya Thottam Colony in Ward No 40 of West Zone
2025_MAWS_624559_16
E6/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
11 Apr 2026
21 Nov 2025
4 Dec 2025
22 Nov 2025
3 Dec 2025
22 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.32 MB
Additional Documents
Additional Documents • 0.26 MB
Tender Documents
Tender Documents • 0.66 MB
BOQ
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .