| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹68.5 L+₹15,876.92 (0.23%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Deenadayalan Manickkam L1 | MASS ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary.Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc.complete complying with standard specification. | |||||
| 1.01 | FOOTING | 224 | M3 | 237 ₹53,088 Lowest | 240 ₹53,760 |
| 1.02 | PLINTH BEAM | 9 | M3 | 111 ₹999 Lowest | 115 ₹1,035 |
| 2.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 26 | M3 | 2,285 ₹59,410 Lowest | 2,290 ₹59,540 |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 26 | M3 | 5,614 ₹1,45,964 Lowest | 5,615 ₹1,45,990 |
| 4.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 156.6 | M3 | 157 ₹24,586.2 Lowest | 160 ₹25,056 |
| 5.00 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 61 | M3 | 317 ₹19,337 Lowest | 320 ₹19,520 |
| 6.00Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||
| 6.01 | Footing, Plinth Beam, etc. | 83 | M2 | 686 ₹56,938 Lowest | 690 ₹57,270 |
| 6.02 | Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works. | 514 | M2 | 1,082 ₹5,56,148 Lowest | 1,085 ₹5,57,690 |
Tender Value
₹70 L
EMD Value
₹70,000
Closing Date
22 Aug 2025, 3:00 pmClosed
Commissioner , Ambur Municipality
Commissioner , Ambur Municipality
Construction 2 Number of additional class room in Ground floor ( 2 Class room) and First Floor ( 2 Class room) at Govindapuram Municipal Middle School in Ambur Municipality
2025_MAWS_593449_1
E1/1375/2025
Open Tender
Civil Works - Buildings
Works
180 days
Ambur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹70,000
Yes
Ambur Municipality
11 Oct 2025
15 Aug 2025
22 Aug 2025
15 Aug 2025
22 Aug 2025
15 Aug 2025
18 Aug 2025
Amount
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary.Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc.complete complying with standard specification.
FOOTING
PLINTH BEAM
Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site.
Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Footing, Plinth Beam, etc.
Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works.
Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works.
Providing and laying in position, M-20 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials).
Foundation & Basement
Ground Floor
First Floor
Terrace Floor
Steel - Fe 500 D: Supply, fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. complete and supply & use of 18G black annealed binding wire double fold to tie the bars in position and providing precast cement/ PVC cover blocks for main reinforcement to ensure specified cover and complete., including all labor charges etc as directed by departmental officers.
Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification.including scaffolding curing cost of reinforcement etc.all complete as per specifications and drawings as directed by the Engineer in-charge.
Foundation & Basement
Ground Floor
First Floor
Terrace Floor
Brick partition walls of 11.50cm thickness using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" in Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron reinforcement if found necessary including curing etc. complete and as directed by the departmental officers.
Ground Floor
Terrace Floor
Providing and applying 10 mm thick Cement plaster in Cement mortar 1:3 ( One part of Cement and Three parts of Sand ), to finishing the exposed surfaces of R.C.C. items of works such as Roof (or) floor slabs, beams, and Sun shades etc.to correct plane and level including scaffolding, hacking of surface, chiselling the undulated surface wherever necessary and curing etc., all materials and labour complete in all respects including all lead, lift and descent and as directed by the Enineer in charge. This rate includes the cost of providing Cement Mortar beadings for sun shades, steps,landing slabs, elevation etc. complete complying with standard specifications.
Providing & applying 12 mm thick cement plaster in CM 1:5 (1 part of cement: 5 parts of sand) to walls internally in single coat at all levels to correct line and level including chicken wire mesh at all joints of brick and concrete surfaces with minimum overlap of 150 mm in all directions, scaffolding, rounding off or chambering of corners, offsets, fin/ bands, projections, etc. and cleaning of surface, raking out joints, roughening of surface, chiseling the undulated surface wherever necessary and curing, etc., all materials and labor complete in all respects including all lead, lift and descent and as directed.
Providing & applying 20 mm thick cement plaster in CM 1:4 (1 part of cement: 4 parts of sand) to walls externally in single coat at all levels to correct line and level including scaffolding, rounding off or chambering of corners, offsets, fin/ bands, projections, etc. and cleaning of surface, raking out joints, roughening of surface, chiseling the undulated surface wherever necessary and curing, etc., all materials and labor complete in all respects including all lead, lift and descent and as directed. Flooring & Dadooing
Paving the floor with Stain free Nano Vitrified tiles of approved quality and colour of size 600x600x8mm thick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of 0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specifications and as directed by the departmental officer. The colour & quality of tiles should be got approved by Municipal Engineer before use on work
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining,curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers).
Providing, fabricating and fixing M.S. grills Windows, and ventilator, gates, ladders, rail pipes, nosing angles, with M.S.lugs in staircase steps etc., made out of M.S rods, flats, angles, pipes, channels etc. including necessary fixtures complete as per drawings and specifications and as directed by the Engineer.
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between. The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc. complete
Manufacturing supplying and fixing of MILD STEEL Window made out of 40 x 40 x 6 mm M.S angle for outer frame, 35 X 35 X 5mm M.S.Angle for outer frame of shutter. The entire shutter area shall be covered with CRC sheets ( 18 G ) with 5Nos,of stiffners using M.S.Flats of size 25 X 6mm at equal intervals horizontally. The corners of the frames and shutter with CRC sheets shall be welded by adopting flash butt welding or any other suitable method. Provision towards 3Nos, of Hinges incase of single shutters / 6Nos,of Hinges incase of Double shutters of 125 X 31 X 1.25mm size placed at appropriate intervals and provisions shall be made for Tower bolts 2Nos, Aldrop 1No. The frame shall be provided with 6Nos,of Hold fast of 200mm length using 50 X 6mm M.S.Flat. The entire frame and shutter shall be provided with one coat of red oxide primer including cost of hold fasts,hinges, locking arrangements, handles wind appliences etc., complete and as directed by the departemental officers.
Manufacturing supplying and fixing of MILD STEEL DOOR made out of 50 x 50 x 6 mm M.S angle for outer frame,35 X 35 X 5mm M.S.Angle for outer frame of shutter. The entire shutter area shall be covered with CRC sheets (18 G) with 5Nos, of stiffners using M.S.Flats of size 25 X 6mm at equal intervals horizontally. The corners of the frames and shutter with CRC sheets shall be welded by adopting flash butt welding or any other suitable method. Provision towards 3Nos, of Hinges incase of single shutters / 6Nos,of Hinges incase of Double shutters of 125 X 31 X 1.25mm size placed at appropriate intervals and provisions shall be made for Tower bolts 2Nos, Aldrop 1No. The frame shall be provided with 6Nos,of Hold fast of 200mm length using 50 X 6mm M.S.Flat. The entire frame and shutter shall be provided with one coat of red oxide primer including cost of hold fasts,hinges, locking arrangements, handles wind appliences etc., complete and as directed by the departemental officers
Supplying and painting the walls with one coat of wall primer and two coats of Exterior emulsion (apex or equivalent) as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as direct.
Provision for GST @ 18 %
Labour Welfare Fund 1%
MASS ENTERPRISES (BID ID -1437236)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .