Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.7 Laccepted-finance | ₹8.7 L | accepted-finance |
Tender Value
₹8.7 L
EMD Value
₹26,000
Closing Date
2 Jun 2026, 9:30 pmClosed
Directorate of Municipal Administration
Construction of cc road , rcc drain sewage pipeline in wno 19, 10, 20, 03 2 stage work under TMC ugarkhurd limit.
DMA/2026-27/WS/WORK_INDENT58807
DMA/2026-27/WS/WORK_INDENT58807
Open
Water supply/sewage lines
DMA Town Municipal Council Ugar-khurd
₹500
₹26,000
2 Jun 2026
25 May 2026
30 May 2026
Construction of cc road , rcc drain sewage pipeline in wno 19, 10, 20, 03 2 stage work under TMC ugarkhurd limit.
Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means (PWD CSR 2023-24 vol-3 P.No 17 I.No.3.3 )
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
PQC Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade...
1.13 Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/Soft rock & depth not exceeding 300mm as p...
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work sit...
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work sit...
6.18 Providing Tile brick masonry with common burnt clay Non Modular tile bricks of class designation 5.0 conforming to IS 2690 (Part I) in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coa...
8.3.2 Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Drain Form Works Consider 35% PWD Common DSR ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW1 tendor document.docx
Tender Document • 0.13 MB
Download all tender documents and submit your bid