| 1 | L1₹1.3 CrAccepted-AOC 107 1F TOLLYGUNGE ROAD KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | ₹1.3 Cr | L1 | Accepted-AOC Being L1 and reasonable |
| 2 | L2₹1.9 CrRejected-Finance SIKONA CHANDIPUR BALASORE ORISSA 756025 | BALESHWAR | ODISHA | 756025 | ₹1.9 Cr | L2 | Rejected-Finance Being other than L1 |
| 3 | Rejected-Technical 107 1A TOLLYGAUNG ROAD KOLKATA 700026 WB | KOLKATA | WEST BENGAL | 700026 | - | - | Rejected-Technical Please refer Technical bid evaluation summary |
| 4 | Rejected-Technical | - | - | Rejected-Technical Please refer Technical bid evaluation summary |
| Sl No | Description | Qty | Unit | S.M.CONSTRUCTIONS L1 | RANA ENTERPRISES L2 |
|---|---|---|---|---|---|
| .01Schedule "A" Part – I to Schedule "A" Part – VI NOTE: Schedule "A" Part – I to Part – IV are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only and for Items of Part V & VI Bidders shall insert unit Rate of each items of work in Green coloured field under Column - 6 only. | |||||
| 1.00 | Lump Sum price worked out by the contractor for "BUILDINGS & STRUCTURES" as listed in Schedule 'A' Part - I | 1 | Each Job | 20,99,925 ₹21.0 L | 31,00,000 ₹31 L |
| 2.00 | Price worked out by the contractor for "PILES & PILE CAPS ", as listed in Schedule 'A' Part - II | 1 | Each Job | 10,93,482 ₹10.9 L | 15,00,000 ₹15 L |
| 3.00 | Price worked out by the contractor for "LIFT AND CONNETED ITEMS" as listed in Schedule 'A' Part - III | 1 | Each Job | 23,56,960 ₹23.6 L | 33,00,000 ₹33 L |
| 4.00 | Price worked out by the contractor for "DEMOLITION AND DISMANTLING" as listed in Schedule 'A' Part - IV | 1 | Each Job | 15,011.71 ₹15,011.71 | 21,000 ₹21,000 |
| 4.01Schedule "A" Part - V [Miscellaneous Items] | |||||
| 4.02PILE FOUNDATION | |||||
| 5.00 | Boring for Bored cast in situ piles 500 dia to any depth in any type of soil strata/soft/weather rock by DMC or any other approved method all as specified and as directed including mobilization & demobilization of piling equipment, making approaches to site etc and getting out and disposal of spoil to a distance 50 metres using complete all as specified and as directed. | 198 | RM | 4,700 ₹9.3 L | 2,100 ₹4.2 L |
| 6.00M&L for Carrying out initial load test on 500mm dia piles following tests all as per IS complete all as specified and directed including necessary anchoring and support piles suitable load/ size to be casted as required. | |||||
| 6.01 | (a) Compression Test | 1 | Each | 3,75,000 ₹3.8 L | 3,00,000 ₹3 L |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹2.0 L
Closing Date
21 Oct 2025, 6:00 pmClosed
CE CG Visakhapatnam
Office of HQ Chief Engineer (CG), Near Varma Complex, Muralinagar, Visakhapatnam-530007
PROVISION OF LIFT FOR P1 ADMINISTRATIVE BUILDING AT CGDHQ 7 PARADIP, UNDER GE(I)(CG) BHUBANESWAR
2025_MES_723152_2
C. A. No. CE (CG) /VIZ/BBSR/ 80231 OF 2025-26
Open Tender
Civil Works
365 days
Bhubaneswar
As per NIT
8 documents required · 8 mandatory
₹1,000
GE (I) (CG) Bhubaneswar
₹2.0 L
Yes
16 Feb 2026
23 Sept 2025
28 Oct 2025
23 Sept 2025
21 Oct 2025
7 Oct 2025
Amount
Schedule "A" Part – I to Schedule "A" Part – VI NOTE: Schedule "A" Part – I to Part – IV are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only and for Items of Part V & VI Bidders shall insert unit Rate of each items of work in Green coloured field under Column - 6 only.
Lump Sum price worked out by the contractor for "BUILDINGS & STRUCTURES" as listed in Schedule 'A' Part - I
Price worked out by the contractor for "PILES & PILE CAPS ", as listed in Schedule 'A' Part - II
Price worked out by the contractor for "LIFT AND CONNETED ITEMS" as listed in Schedule 'A' Part - III
Price worked out by the contractor for "DEMOLITION AND DISMANTLING" as listed in Schedule 'A' Part - IV
Schedule "A" Part - V [Miscellaneous Items]
PILE FOUNDATION
Boring for Bored cast in situ piles 500 dia to any depth in any type of soil strata/soft/weather rock by DMC or any other approved method all as specified and as directed including mobilization & demobilization of piling equipment, making approaches to site etc and getting out and disposal of spoil to a distance 50 metres using complete all as specified and as directed.
M&L for Carrying out initial load test on 500mm dia piles following tests all as per IS complete all as specified and directed including necessary anchoring and support piles suitable load/ size to be casted as required.
(a) Compression Test
(b) Pull out Test
(c) Lateral Test
M&L Carrying out routine load testing on 500mm dia pile of following tests all as per IS complete all as specified and as directed :
(a) Compression Test
(b) Pull out Test
(c) Lateral Test
M&L Carrying out Pile Integrity testing on 500mm dia piles including analysing the results as per ASTM D 5882 complete all as specified and as directed
LIFT AND CONNECTED ITEMS
S&F VTPN DB double door,IK 09,IP43-Metal door, 4 way, made of CRCA sheet steel ,RAL 9003,powder coated with bus bar, neutral link, earth bar with provision for DU125A MCCB,4 pole as incomer and SP/TP MCBs as Outgoings complete. Make/Model- DBVTL004DD of L&T or equivalent model in HPL/Legrand/Havells/C&S
S&F MCCB 4 pole,100 Amps, for Incomer of VTPN with fixed thermal & magnetic release of breaking capacity 30kA,DU100H(Icu=30kA,Ics=50% Icu), 415 Volts. Make: L&T,Cat No.CM97933OOK2 or equivalent model in Standard/ HPL/Havells/C&S)
S & F MCB 06 to 32 Amps SP `C` series, complete all as specified and directed Make:L&T,Cat No-BB 10320C or equivalent model in Standard/Legrand/HPL/Havells/C&S
SCHEDULE 'A' PART -VI (COMPREHENSIVE MAINTENANCE MAINTENANCE AND MANNING & OPERATION OF LIFTS)
Outsourcing of services during defect liability period (DLP) for Operation and maintenance of Electrical Lift (8 Passenger lift) by deploying one operator(Skilled) in each Shift per day in two shifts (Each shift of 8 hours) including Sundays and Holidays for 01 lift for building(G+3) who will also act as a assistant for rescue in case of any failure of lift/in emergency all as specified and directed complete for following period.
(a) 1st year after completion i.e during defects liability period (1st Year) ( for 01 Lifts)
(b) 2nd year after completion i.e during defects liability period (2nd Year) ( for 01 Lifts)
(c) Operation and maintenance during 1st year after expiry of defects liability period
(d) Operation and maintenance during 2nd year after expiry of defects liability period
(e) Operation and maintenance during 3rd year after expiry of defects liability period
Comprehensive maintenance, servicing and repairs including renewal/replacement of defective parts of electrically operated 08 passengers Lift after completion of 2 years of defect liability period suitable for ground plus three floors ( G + 3 upper floors ) with speed 1.5 m/s and Automatically operated door system for the following period.
(a) Comprehensive maintenance during 1st year after expiry of defects liability period (3rd year after completion of Phase I work)
(b) Comprehensive maintenance during 2nd year after expiry of defects liability period (4th year after completion of Phase I work)
(c) Comprehensive maintenance during 3rd year after expiry of defects liability period (5th year after completion of Phase I work)
Notes for Serial Item Nos -13.01 to 13.03 above :- (i) The rate quoted is deemed to include all/any charges related to renewal of lift license and lift insurance from State Govt/Other Agency. (ii) The rate is inclusive of all items as required at site including any spares to keep the lift operated all the time. (iii) The Maintenance of the lifts should be done through the OEM. (iv) The contractor should attend the complaint/breakdown immediately. (v) Maintenance of the lift should be done as per manufacturer instructions
RANA ENTERPRISES (BID ID -3454784)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
80231Prepriced.pdf
Additional Documents • 0.56 MB
BOQ_819958.xls
BOQ • 0.28 MB
80231Tender.pdf
Tender Documents • 1.73 MB
80231StucturalandArchDrgs.pdf
Additional Documents • 2.74 MB
Download all tender documents and submit your bid