| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H8₹44.5 L−₹4.7 L (9.48%)Accepted-AOC | H8 | Accepted-AOC Contract awarded to M/s Sadhan Kumar Mukherjee being lowest bidder | |
| 2 | H1₹49.1 LRejected-Finance | H1 | Rejected-Finance Higher rate quoted than H8 | |
| 3 | H2₹48.3 L−₹83,662.25 (1.70%)Rejected-Finance VILL BONOGRAM PO RANDIA P S BUDBUD DIST BURDWAN PIN 713120 WB | BURDWAN | BURDWAN | WEST BENGAL | 713120 | H2 | Rejected-Finance Higher rate quoted than H8 | |
| 4 | H3₹47.3 L−₹1.8 L (3.68%)Rejected-Finance BIDHAN NAGAR MANKAR ROAD PO PS BUD BUD DIST PURBA BARDHAMAN PIN 713403 | BUD BUD | PURBA BARDHAMAN | WEST BENGAL | 713403 | H3 | Rejected-Finance Higher rate quoted than H8 | |
| 5 | H4₹46.7 L−₹2.5 L (5.00%)Rejected-Finance | H4 | Rejected-Finance Higher rate quoted than H8 |
| Sl No | Description | Qty | Unit | M/s sadhan kumar mukherjee H8 | K L BAKSHI AND SONS H7 | S.D.ENTERPRISE H3 | M/s S A TRADING H2 | M/S DYNAMIC INDIA (PROJECT) CONSTRUCTION H6 | SANJAY KUMAR SUPAN H5 | HAZRA ENTERPRISE H1 | M/S JOYGURU ENTERPRISE H4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete(unreinforced) of any description and in any position not otherwise specifically provided for and removal of rubbish off the site complete all as spd and directed. | 32 | Cum | 510 ₹16,320 Lowest | 525 ₹16,800 | 620 ₹19,840 | 650 ₹20,800 | 550 ₹17,600 | 600 ₹19,200 | 680 ₹21,760 | 565 ₹18,080 |
| 2.00 | Demolition of cement concrete (reinforced) in ground floors and pavings n exc 15cm thickness (below or above ground level) complete all as spd and directed. | 2 | Cum | 599 ₹1,198 Lowest | 620 ₹1,240 | 720 ₹1,440 | 750 ₹1,500 | 650 ₹1,300 | 700 ₹1,400 | 780 ₹1,560 | 666 ₹1,332 |
| 3.00 | Demolition of brick work built in lime mortar or cement lime mortar incl all quoins, arches pillars etc and removing unserviceable material exc 100 mtr complete all as spd and directed. | 166 | Cum | 477 ₹79,182 Lowest | 499 ₹82,834 | 620 ₹1,02,920 | 650 ₹1,07,900 | 550 ₹91,300 | 600 ₹99,600 | 680 ₹1,12,880 | 580 ₹96,280 |
| 4.00 | Excavating in trenches , n.exc 1.5 m wide and n.exc 1.5 m depth for foundation etc or for shafts, wells, cesspits ,manhole pier hole, laying of cables, pipes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in any kind of soil
Note : Manual excavation to be done. During excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost. Contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.If contractor fails to repair it within 24 hrs penalty @ Rs 500/- will be charged to contractor. In this GE decision will be final, conclusive and binding. | 430 | Cum | 352 ₹1,51,360 Lowest | 360 ₹1,54,800 | 411 ₹1,76,730 | 450 ₹1,93,500 | 380 ₹1,63,400 | 400 ₹1,72,000 | 460 ₹1,97,800 | 382 ₹1,64,260 |
| 5.00 | M&L for pavings, with mix of fly ash, clinker & stone dust in the proportion of 1:3:6 (ie 10% fly ash, 30% clinker and 60% stone dust ) laying in layers n. exc 10cm thick, watering, ramming and compacted with hand/power roller 8 to 12 tonn roller to required camber and gradient complete all as directed by Engineer-in-Charge. | 64 | Cum | 1,716 ₹1,09,824 Lowest | 1,750 ₹1,12,000 | 1,852 ₹1,18,528 | 1,850 ₹1,18,400 | 1,800 ₹1,15,200 | 1,850 ₹1,18,400 | 1,866 ₹1,19,424 | 1,820 ₹1,16,480 |
| 6.00 | M & L for PCC (1:4:8) Type D2 using 40 mm graded aggregate used as in sub base for drain and finishing complete all as specified and as directed. | 87 | Cum | 6,377 ₹5,54,799 Lowest | 6,400 ₹5,56,800 | 6,520 ₹5,67,240 | 6,540 ₹5,68,980 | 6,425 ₹5,58,975 | 6,455 ₹5,61,585 | 6,600 ₹5,74,200 | 6,500 ₹5,65,500 |
| 7.00 | M&L Cement concrete 1:3:6, type C-2 (using 40mm graded stone aggregate) in foundations, filling and mass concrete complete all as specified and directed. | 88 | Cum | 7,189 ₹6,32,632 Lowest | 7,200 ₹6,33,600 | 7,422 ₹6,53,136 | 7,500 ₹6,60,000 | 7,222 ₹6,35,536 | 7,300 ₹6,42,400 | 7,600 ₹6,68,800 | 7,250 ₹6,38,000 |
| 8.00 | M&L for old size brick work with fly ash bricks straight or curved on plan exc 6 m mean radius build in CM 1:4 all as specified as directed. | 183.25 | Cum | 8,399 ₹15,39,116.75 Lowest | 8,422 ₹15,43,331.5 | 8,600 ₹15,75,950 | 8,625 ₹15,80,531.25 | 8,499 ₹15,57,441.75 | 8,550 ₹15,66,787.5 | 8,700 ₹15,94,275 | 8,530 ₹15,63,122.5 |
| 9.00 | All as per item No 8.00 here-in-before but except bricks complete all as spd and directed. | 55.75 | Cum | 3,922 ₹2,18,651.5 Lowest | 3,955 ₹2,20,491.25 | 4,100 ₹2,28,575 | 4,150 ₹2,31,362.5 | 4,020 ₹2,24,115 | 4,050 ₹2,25,787.5 | 4,200 ₹2,34,150 | 4,060 ₹2,26,345 |
| 10.00 | M&L for cement concrete type B-1, 1:2:4 (using 20mm graded stone aggregate) in surface channels and drains for benching complete all as spd and directed. | 36.2 | Cum | 7,655 ₹2,77,111 Lowest | 7,720 ₹2,79,464 | 7,800 ₹2,82,360 | 7,925 ₹2,86,885 | 7,795 ₹2,82,179 | 7,780 ₹2,81,636 | 8,000 ₹2,89,600 | 7,800 ₹2,82,360 |
Tender Value
₹46.6 L
EMD Value
₹93,200
Closing Date
23 May 2026, 6:00 pmClosed
GE PANNGARH
GARRISON ENGINEER PANAGARH, MILITARY ENGINEER SERVICES, PO-PANAGARH, DISTT- BURDWAN, STATE-WEST BENGAL PIN-713420
All as per BOQ
2026_MES_763098_1
8500-565/E8
Open Tender
Civil Works
Works
180 days
PANNGARH
As per tender docus
6 documents required · 6 mandatory
₹500
GE Panagarh
₹93,200
18 Jul 2026
2 May 2026
25 May 2026
2 May 2026
23 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete(unreinforced) of any description and in any position not otherwise specifically provided for and removal of rubbish off the site complete all as spd and directed. | 32 | Cum | - | - |
| 2 | Demolition of cement concrete (reinforced) in ground floors and pavings n exc 15cm thickness (below or above ground level) complete all as spd and directed. | 2 | Cum | - | - |
| 3 | Demolition of brick work built in lime mortar or cement lime mortar incl all quoins, arches pillars etc and removing unserviceable material exc 100 mtr complete all as spd and directed. | 166 | Cum | - | - |
| 4 | Excavating in trenches , n.exc 1.5 m wide and n.exc 1.5 m depth for foundation etc or for shafts, wells, cesspits ,manhole pier hole, laying of cables, pipes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in any kind of soil
Note : Manual excavation to be done. During excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost. Contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.If contractor fails to repair it within 24 hrs penalty @ Rs 500/- will be charged to contractor. In this GE decision will be final, conclusive and binding. | 430 | Cum | - | - |
| 5 | M&L for pavings, with mix of fly ash, clinker & stone dust in the proportion of 1:3:6 (ie 10% fly ash, 30% clinker and 60% stone dust ) laying in layers n. exc 10cm thick, watering, ramming and compacted with hand/power roller 8 to 12 tonn roller to required camber and gradient complete all as directed by Engineer-in-Charge. | 64 | Cum | - | - |
| 6 | M & L for PCC (1:4:8) Type D2 using 40 mm graded aggregate used as in sub base for drain and finishing complete all as specified and as directed. | 87 | Cum | - | - |
| 7 | M&L Cement concrete 1:3:6, type C-2 (using 40mm graded stone aggregate) in foundations, filling and mass concrete complete all as specified and directed. | 88 | Cum | - | - |
| 8 | M&L for old size brick work with fly ash bricks straight or curved on plan exc 6 m mean radius build in CM 1:4 all as specified as directed. | 183.25 | Cum | - | - |
| 9 | All as per item No 8.00 here-in-before but except bricks complete all as spd and directed. | 55.75 | Cum | - | - |
| 10 | M&L for cement concrete type B-1, 1:2:4 (using 20mm graded stone aggregate) in surface channels and drains for benching complete all as spd and directed. | 36.2 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
PS565.pdf
Tender Documents • 0.89 MB
BOQ_854766.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .