Loading…
Loading…
Tender Value
₹8.1 Cr
EMD Value
₹12.1 L
Closing Date
6 Oct 2026, 3:00 pm
General Manager (Contracts)
Bangalore Metro Rail Corporation Limited, Annex-1, Project and Planning 4th Floor, BMTC Complex, Shanthinagar, Bengaluru
Construction of Check Post at entrance of the Airport Depot approach road and construction of Boundary Wall for BMRCL acquired land surrounded by private properties in Airport Line, Bangalore Metro Rail Project- Package-3/Phase-2B.
2026_BMRCL_289995_1
BMRCL/Ph2B/Pkg3/CP_BW/156
Open Tender
Civil Works
Percentage
305 days
Bangalore
Please refer Tender documents.
9 documents required · 9 mandatory
₹11,800
Bangalore Metro Rail Corporation Limited
₹12.1 L
Bangalore
5 Sept 2026
5 Sept 2026
7 Oct 2026
5 Sept 2026
6 Oct 2026
30 Sept 2026
5 Sept 2026 - 21 Sept 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Check Post at entrance of the Airport Depot approach road and construction of Boundary Wall for BMRCL acquired land surrounded by private properties in Airport Line, Bangalore Metro Rail Project- Package-3/Phase-2B.
( Total of Schedule - A to Schedule - D of BoQ) | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Vol4CPBW.pdf
Tender Documents • 1.75 MB
Vol3CPBW.pdf
Tender Documents • 14.96 MB
Vol2CPBW.pdf
Tender Documents • 2.63 MB
Vol1CPBW.pdf
Tender Documents • 3.74 MB
Vol5CPBW.pdf
Tender Documents • 0.83 MB
BOQ_338244.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .