SE, EDCH, MVVNL
SE, EDCH, ASHA NAGAR, HARDOI
Construction of 11 0.4 KVA Transformer Plinth suitable for 250 KVA T F, Fencing AND Its H.T. L.T. Side Fuse Unit AND Others associated work in Bajiganj, Mallawan under Jurisdiction of EDD-I, Hardoi.
2020_MVVNL_522170_2
111/EDCH/2020-21
Open Tender
Miscellaneous Works
Fixed-rate
45 days
HARDOI
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
A/C No. 11102369142 , IFSC Code SBIN 0000649
Exempted
14 Dec 2020
12 Nov 2020
26 Nov 2020
12 Nov 2020
25 Nov 2020
12 Nov 2020
Amount
Erection of 11 KV line/H.T./L.T.
Construction 2×2×1.5 Mtr. Plinth from Bricks & Ballast, on the top of plinth fixing 2 No. 125×65 mm. channel with plastering outer for the erection and commissioning 250 KVA T/F (All the material will be arranged by the contractor at his own cost.)
Construction of retaining well, fabrication & erection of wire mesh fencing of size 2 (5+3) × 2.0 M height around Transformer and Distribution Pillar Box with retaining well & 1 No. gate made of ms angel, ms channel, ms flat together with locking arrangement its installation including the cost of civil material, angle 50×50×6 mm, channel, extra. (All the material will be arranged by the contractor at his own cost.)
Construction of Missionary type DP Box (1 No. I/C & 3 No O/G) include lugs (All the material will be arranged by the contractor at his own cost.)
Boring earthing with 30 meter or up to water level providing GI pipe 1.5'' dia (''B'' Class) and earthing must be joint by GR Stripe of 32×5 mm thick long attached with nut & bolts and GI pipe cap (All the material will be arranged by the contractor at his own cost.)
Safe Dismounting & Mounting of 250 KVA T/F on the trolley from old and damaged plinth by technical equipment like Hydra or Crane & energised them. (Trolley, Hydra Or Crane arranged by the contractor at his own cost)
Safe Mounting & Dismounting of 250 KVA T/F on the New Plinth from the trolley by technical equipment like Hydra or Crane. Copper L-Piece with Aluminium lugs Provided by contractor
Supply & Installation of HT side Fuse unit Complete Work
Proper commissioning & energization of 250 KVA T/F balancing of load on Transformer.
Neeraj Electricals
M/S S.K. CONTRACTOR AND SUPPLIER
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .