| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹11.2 L+₹1.7 L (18.3%)Rejected-AOC 368 PHASE 4 SAS NAGAR MOHALI 160059 PB | S A S NAGAR | PUNJAB | 160059 | L2 | Rejected-AOC Other than Lowest Bidder | |
| 3 | L3₹12.6 L+₹3.2 L (34.1%)Rejected-AOC HM 324 PHASE IX SAS NAGAR MOHALI PB | L3 | Rejected-AOC Other than Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
4 Dec 2020, 6:00 pmClosed
CWE (AF) Chandigarh
HQ CWE (AF) Chandigarh-160003
CAMOUFLAGE PAINTING TO VARIOUS BUILDINGS, HANGERS AND SECURITY WALL IN TECHNICAL AREA AT AF STATION CHANDIGARH
2020_MES_391923_1
CWE/AF CHD/CHD/T-43/2020-2021
Open Tender
Civil Works
Item Rate
183 days
Chandigarh
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) Chandigarh
₹30,000
Yes
9 Dec 2020
3 Nov 2020
7 Dec 2020
3 Nov 2020
4 Dec 2020
20 Nov 2020
Amount
Taking down cement plaster on brick or stone walls or concrete surfaces etc, any description including raking out joints, hacking for key, scrubbing down with water, etc and removal of rubbish outside MoD land, complete all as specified and directed.
Material and labour for rendering 15mm thick in cement mortar (1:4), using water proofing compound as per manufacturer's instructions, on brick/concrete surfaces of walls, finished even and fair , complete all as specified and directed. Note :- Supply only water proofing compound will be measured and paid for separately.
Supply only integral water proofing compound, complete all as specified and directed.
Material and labour for rendering 15mm thick in cement mortar (1:6), on brick/concrete surfaces of walls, finished even and smooth without using extra cement , complete all as specified and directed.
Material and labour for rendering 10 mm thick in cement mortar (1:3), on concrete surfaces (such as top & sides of chajjas, beams, balcony, ceiling etc) , finished even and smooth without using extra cement , complete all as specified and directed. Note :- 1. The qouted rate shall deem to include the cost of scaffolding and formwork not exceeding 8.50 metres height of building.
Material and labour for preparation of old painted steel or iron surfaces over 10 cm width or girth not otherwise described for external roofs and walls of hangers of height upto 12 metre and applying one coat of synthetic enamel paint (in camouflage pattern using number of colours as directed) complete all as specified and directed. Notes: 1. Number of colours and pattern of camouflage shall be approved by GE. 2. The rate quoted by contractor is deemed to include necessary scaffolding for painting upto required height. 3.All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the worrk and the cost for the same shall be deemed to be included in rate quoted by contractor.
Material and labour for preparation of old painted steel or iron surfaces over 10 cm width or girth not otherwise described for external roofs and walls of hangers of height upto 12 metre and applying two coats of synthetic enamel paint (in camouflage pattern using number of colours as directed) complete all as specified and directed. Notes: 1. Number of colours and pattern of camouflage shall be approved by GE. 2. The rate quoted by contractor is deemed to include necessary scaffolding for painting upto required height. 3.All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the worrk and the cost for the same shall be deemed to be included in rate quoted by contractor.
Material and labour for preparation of old surfaces of walls including brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc.; washing, rubbing down and stopping of surfaces using sand paper and applying one coat of exterior acrylic emulsion paint (in camouflage pattern using number of colours as directed) complete all as specified and directed by the Engineer-in-Charge. Note: Number of colours and pattern of camouflage shall be approved by GE.
Material and labour for preparation of old surfaces of walls including brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc.; washing, rubbing down and stopping of surfaces using sand paper and applying two coats of exterior acrylic emulsion paint (in camouflage pattern using number of colours as directed) complete all as specified and directed by the Engineer-in-Charge. Note: Number of colours and pattern of camouflage shall be approved by GE.
Material and labour for preparation of old painted steel or iron surfaces over 10 cm width or girth not otherwise described for steel stanchion and truss of hangers of height upto 12 metre and applying one coat of aluminium paint complete all as specified and directed. Notes: 1. The rate quoted by contractor is deemed to include necessary scaffolding for painting upto required height. 2. All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insuranse of workers shall be got done by contractor before execution of the worrk and the cost for the same shall be deemed to be included in rate quoted by contractor.
Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts trading oil greasy spot etc, rubbing down and stopping of surface using sand paper and applying one coat of oil bound distemper on wall , complete all as specified and directed. Notes: 1. The rate quoted by contractor is deemed to include necessary scaffolding for ditempering upto 12 metre height. 2. All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insuranse of workers shall be got done by contractor before execution of the worrk and the cost for the same shall be deemed to be included in rate quoted by contractor.
Preparation of new plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts trading oil greasy spot etc, rubbing down and stopping of surface using sand paper and applying two coats of oil bound distemper (oil emulsion) over and including a coat of primer , complete all as specified and directed. Notes: 1. The rate quoted by contractor is deemed to include necessary scaffolding for ditempering upto 12 metre height. 2. All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insuranse of workers shall be got done by contractor before execution of the worrk and the cost for the same shall be deemed to be included in rate quoted by contractor.
Material and labour for preparation of newly plastered surfaces of wall and applying two coats of cement based paint, complete all as specified and directed.
Baba Engineers and Contractors
M/s Matloob Ahmed
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .