Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | ₹10.4 L | L1 | Accepted-AOC Workorder |
| 2 | L2₹10.4 LRejected-Finance | ₹10.4 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | K R BUILDERS L2 | velmurugan.s L1 |
|---|---|---|---|---|---|
| 1.00Construction of Kitchen shed Type IV at Vadamadurai Govt. Hr. Sec. school (Boys) H/O Vadamadurai | |||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard gravelly soil for foundation etc. complete. | 11.9 | CUM | 264 ₹3,141.60 | 263 ₹3,129.70 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 15.19 | CUM | 1,714 ₹26,035.66 | 1,713 ₹26,020.47 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete | 5.44 | CUM | 5,412 ₹29,441.28 | 5,411 ₹29,435.84 |
| 5.00 | Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete. | 25.65 | CUM | 6,112 ₹1.6 L | 6,111 ₹1.6 L |
| 6.00 | Supplying and erecting shuttering including necessary support for plane surface in foundation Basement and Roof labs strutting upto 3.29M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations | 125.77 | Sqm | 1,100 ₹1.4 L | 1,095 ₹1.4 L |
| 7.00 | Supplying, fabricating and placing in position mild steel or ribbed to steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete. | 1.22 | MT | 91,900 ₹1.1 L | 91,865 ₹1.1 L |
| 8.00 | RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 15.28 | CUM | 9,187 ₹1.4 L | 9,186 ₹1.4 L |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 33.75 | Sqm | 309 ₹10,428.75 | 308 ₹10,395 |
| 10.00 | Plastering with CM 1:3 mix 10mm thick including cost and conveyance of all materials to site and labour charges etc. complete. | 12 | Sqm | 328 ₹3,936 | 327 ₹3,924 |
Tender Value
Refer Docs
EMD Value
₹10,600
Closing Date
12 Nov 2025, 3:00 pmClosed
Block Developement Officer Vadamadurai
Block Developement Officer Vadamadurai
NPMTMS - 2025 -26 TN 05 01 BLOCK DEVELOPMENT OFFICE VADAMADURAI PANCHAYAT UNION
2025_RDTN_622123_1
1654/2025/A5/04.11.2025
Open Tender
Civil Works
270 days
Block Developement Office Vadamadurai
NPMTMS - 2025 -26 TN 05 01 BLOCK DEVELOPMENT OFFICE VADAMADURAI PANCHAYAT UNION
2 documents required · 2 mandatory
₹0
₹10,600
15 May 2026
11 Nov 2025
12 Nov 2025
11 Nov 2025
12 Nov 2025
11 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.40 MB
BOQ
BOQ • 0.29 MB
Download all tender documents and submit your bid