Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC | ₹17.7 L | L1 | Accepted-AOC Lowest Amount Accepted |
| 2 | L2₹17.7 LRejected-AOC | ₹17.7 L | L2 | Rejected-AOC Highest Amount Rejected |
| Sl No | Description | Qty | Unit | MCM AGENCY L1 | MCM ANDCO L2 |
|---|---|---|---|---|---|
| 1.00STRENGTHENING THE ROAD FROM Poraiyur PWD Bridge to Mottukadu H/O Kolnaickenpatti Village - km 0/0 - 1/200 -R385 at kolathur Block | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. Km 0/0- 1/2 | 806.4 | m2 | 6.3 ₹5,081 | 6.36 ₹5,129 |
| 3.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction. Km 0/0- 1/2 | 75.6 | m3 | 341 ₹25,780 | 341.07 ₹25,785 |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m. Km 0/0- 1/2 | 560 | m2 | 23.35 ₹13,076 | 23.35 ₹13,076 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2. Km 0/0- 1/2 | 216.57 | m3 | 2,886.7 ₹6.3 L | 2,886.7 ₹6.3 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0- 1/2 | 1,732.5 | m2 | 86.55 ₹1.5 L | 86.55 ₹1.5 L |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all. Km 0/0- 1/2 | 1,732.5 | m2 | 20.25 ₹35,084 | 20.25 ₹35,084 |
| 8.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5. Km 0/0- 1/2 | 43.32 | m2 | 12,140.4 ₹5.3 L | 12,140.4 ₹5.3 L |
| 9.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including eflectorishing glass beads @250 gms per sqm area ,thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 ,The finished surface to be leveluniform an. Km 0/0- 1/2 | 112 | M2 | 890 ₹99,680 | 890 ₹99,680 |
| 10.00 | Provision for Hecta Metre Stone - Nos | 2 | M2 | 574.65 ₹1,150 | 574.65 ₹1,150 |
Tender Value
Refer Docs
EMD Value
₹17,680
Closing Date
26 Feb 2026, 9:00 amClosed
BDO VP KOLATHUR
BDO OFFICE KOLATHUR
STRENGTHENING THE ROAD FROM Poraiyur PWD Bridge to Mottukadu H/O Kolnaickenpatti Village - km 0/0 - 1/200 -R385 at kolathur Block
2026_RDTN_663142_2
411/2026/T2
Open Tender
Civil Works - Roads
90 days
BDO OFFICE KOLATHUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,680
27 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
STRENGTHENING THE ROAD FROM Poraiyur PWD Bridge to Mottukadu H/O Kolnaickenpatti Village - km 0/0 - 1/200 -R385 at kolathur Block
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. Km 0/0- 1/2
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction. Km 0/0- 1/2
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m. Km 0/0- 1/2
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2. Km 0/0- 1/2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0- 1/2
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all. Km 0/0- 1/2
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5. Km 0/0- 1/2
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including eflectorishing glass beads @250 gms per sqm area ,thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 ,The finished surface to be leveluniform an. Km 0/0- 1/2
Provision for Hecta Metre Stone - Nos
Provision for LWF 1 % (Please Type 14810)
Provision for Name Board including painting,and Lettering
Provision for Photographic charges
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2PWDmottukadu.pdf
Tender Documents • 0.89 MB
BOQ_796143.xls
BOQ • 0.29 MB
AdditionalDocuments.pdf
Additional Documents • 0.24 MB
Download all tender documents and submit your bid