| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.7 CrAccepted-Finance | ₹3.7 Cr | L-1 | Accepted-Finance Tender Awarded |
| 2 | L-2₹3.7 Cr+₹3.8 L (1.02%)Rejected-Finance | ₹3.7 Cr+₹3.8 L (1.02%) | L-2 | Rejected-Finance Tender Awarded to frist lowest |
Tender Value
₹3.8 Cr
EMD Value
₹8.0 L
Closing Date
27 Apr 2026, 6:00 pmClosed
Superintending Engineer 14 th Circle Rohru
Superintending Engineer 14 th Circle Rohru
Sub Head ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/000 to 3/425
2026_CEHP_147220_1
SE-XIV-13-27-DT-7-4-26
Open Tender
Civil Works - Roads
Percentage
547 days
Rohru
Please refer Tender documents.
16 documents required · 16 mandatory
₹7,000
₹8.0 L
18 Jul 2026
7 Apr 2026
28 Apr 2026
7 Apr 2026
27 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil , ordinary rock and hard rock .All work of rock cutting by blastingshall be carried out by taking all necesary precautions against soil erosion ,damages to hill side ,water pollution etc. and to protect stability of hill side .Rock shall be excavated with chiseling and wedging out of rock (where blasting is prohibited) .All earth work in cutting /excavation including rock excavation shall be carried out true to lines ,grades ,sides slopes,width,camber,super-elevation and level as shown on the drawing and as directed by the Engineer-in-Charge in conformity with the requirement of MoRD technical specification for Rural Road, Section. 300 & 1600 to achive designed formation width including hauling and stacking of materials useful for constrcution at suitable sites safe manner and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load and animal transport and mechanical means along with its levelling, fine dressing and carriage of machineries, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. During the mobilisation period, contractor should take the advanced x-sec in 15 m interval of whole road length in the presence of Engineer-in-charge or his representative. In case the advanced x-sec has been taken in the presence of Engineer-in-Charge representative, in that case the same has to be got approved from Engineer-in-Charge. The land for dumping sites shall be arranged by the contractors himself and nothing extra shall be paid on this account,filling of unevenness blind age and finishing of the road to specified dimensions or as directed by the Engineer-in-charge for smooth riding .The recovery for stones ,whether usefule or not for 1521.19 cum. (One Thousand five hundred twenty one point nineteen Cubic Metre) in all cases, @ Rupees 300/= only (Rupees three Hundred ) per cubic metre shall be effected on prorata basis in all circumstances .Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor ,which shall have to be duly compensated by him in all cases.. | - | Per cubic metre | - | - |
| 2 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drain and Parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks (Where blasting is prohibited) as per drawings and M.O.R.D. technical specification section 300 and 1600 and as per direction of the Engineer- In – Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and lift including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layer not executing 150 mm (one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth any quantam of water including cleaning of slush which may arise out during dewatering complete as per direction of Engineer-in-Charge. Including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic metre | - | - |
| 3 | Providing and laying concrete Mechanically mixed and vibrated 1:6:12 (one cement: six sand : twelve graded stone aggregates 40 mm (forty millimetre) nominal size) for plain/reinforced concrete in open foundations complete as per drawing and technical specification section 800 and 1200 curing complete including the cost of form work and hauling of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic metre | - | - |
| 4 | Providing and laying concrete mechanically mixed and vibrated PCC M-10 (Ten) nominal mix 1:3:6(one cement : three sand : six aggregate) design mix with cement contents not less than 220kg (two hundred Twenty kilogram per cubic metre) with 40 mm (Forty millimeter) nominaal size for plain/reinforced concrete in open foundation and plinths or similar works complete as per drawings and MoRD technical specification section 800, 900, 1200 and 1600 and curing complete including the cost of form work and hauling of materail in all leads and lifts as per the entire satisfication and direction of Engineer in charge.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic metre | - | - |
| 5 | Providing and laying concrete mechanically mixed and vibrated grade M-15 (M-fifteen) nominal mix 1:2.5:5 (one cement : two point five sand: five aggregate) design mix with cement contents not less than 275kg (two hundred seventy five kilogram per cubic metre) with aggregate 40 mm (forty millimeter) nominaal size for plain/reinforced concrete substructure complete as per drawings and MoRD technical specificcation section 800, 900,1200 and 1600 and curing complete including the cost of form work and hauling of materail in all leads and lifts as per the entire satisfication and direction of Engineer in charge . The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic meter. | - | - |
| 6 | Providind concrete for plain/reinforced concrete in open foundation complete as per drawing and technical specification clause 802,804 805, 806,807,1202 & 1204. Nominal mix P.C.C. M-20 (twenty) ( C.C. 1:2:4 ) (one cement : two sand : four aggregate) including the cost of form work and hauling of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic meter. | - | - |
| 7 | Providing and laying concrete Mechanically mixed and vibrated 1:4:8 (One Cement : four sand : eight graded crushed stone aggregate 25 mm (Twenty five milimetre) nominal size for plain /reinforced concrete in open foundations and plinths or similar works complete as per drawing and MoRD technical specification rural roads section 800, 900, 1200 and 1600 including carriage of materials upto all leads lifts and as per the direction of Engineer-in-Charge.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic meter. | - | - |
| 8 | Providing and laying reinforced cement concrete M-25 (twenty five) in substructure 20 mm (Twenty millimeter ) Aggrigate as per drawings and technical specification section 800 & 1200 .including all leads , Lifts and carriage of materials complete as per entire saisfication of the Engineer in Charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic meter. | - | - |
| 9 | Providing and laying cement concrete wearing course M 30 (thirty) grade including reinforcement 20 mm (Twenty millimeter ) Aggregate completeas per drawings and technical specification section 800 & 1200 .including all leads , Lifts and carriage of materials complete as per entire saisfication of the Engineer in Charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per cubic meter. | - | - |
| 10 | Supplying , fitting and placing HYSD bar reinforcement (Fe 415) in superstructure -structure complete as per drawing and HP.PWD. technical specifications section 1000 including all leads, lifts or as directed by the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | - | Per metric tonne. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
J-1FinalKawalta770.pdf
Tender Documents • 1.57 MB
BOQ_229202.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .