Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹4,717.79 (3.39%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.5 L+₹9,321.69 (6.71%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Residence certificate not uploaded | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Residence certificate nit uploaded |
Tender Value
₹1.9 L
EMD Value
₹3,860
Closing Date
24 Sept 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction of Culvert with Hume Pipe from Army gate no.6 to Mohalla Manohar Panch and others ward No.6 Block Nagrota Pyt. Nadore, Block Nagrota Under scheme PRIs Component District Capex Budget For the year 2026-27, Block Level , 2nd Call
2026_RDPR_324576_1
e-NIT No. 581 REWJ of 2026-27 dated 15-09-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹3,860
14 Oct 2026
15 Sept 2026
25 Sept 2026
15 Sept 2026
24 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes,
cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on
plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth
and disposal of surplus excavated earth as directed, within a lead of 50 metres: In all kind of soil | 6.8 | cum | 256.85 | ₹1,746.58 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of
centring and shuttering. All work upto plinth level with: 4.4.8 1:5:10 (1 cement : 5 coarse sand : 10 graded
stone aggregate 40 mm nominal size) | 1.57 | cum | 4,826.5 | ₹7,577.61 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of
centring and shuttering. All work upto plinth level with: 4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone
aggregate 20 mm nominal size) | 21.17 | cum | 5,733.6 | ₹1,21,380.31 |
| 4 | bolders | 9.09 | cum | 937 | ₹8,517.33 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations,
footings, bases for columns | 24.49 | sqm | 286.5 | ₹7,016.38 |
| 6 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff
mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.
complete. (20.6.2) Non-pressure NP-3class (medium duty) R.C.C. pipes (20.6.2.3) 900 mm dia. R.C.C. pipe
including Supplying and Placing. | 7.93 | sqm | 3,921.5 | ₹31,097.5 |
| 7 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km
also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of
foundation etc. complete. | 16.31 | sqm | 276.6 | ₹4,511.35 |
| 8 | Carriage of sand and aggregate avg. 5 km by MT | 32 | rmt | 200.47 | ₹6,415.04 |
| 9 | Stone avg. 03 km lead by MT | 9.09 | sqm | 195.1 | ₹1,773.46 |
| 10 | Add Cost of Sign Board including painting and writting complete job | 1 | sqm | 3,000 | ₹3,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_1095075.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .