Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74,000Financial bid opened Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | ₹74,000 | L1 | Financial bid opened |
| 2 | L2₹76,400+₹2,400 (3.24%)Financial bid opened Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | ₹76,400+₹2,400 (3.24%) | L2 | Financial bid opened |
| 3 | L3₹90,000+₹16,000 (21.6%) Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | ₹90,000+₹16,000 (21.6%) | L3 | - |
| 4 | L4₹90,500+₹16,500 (22.3%) Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). | ₹90,500+₹16,500 (22.3%) | L4 | - |
| 5 | - | - | - | - |
| Sl No | Description | Qty | Unit | ABM ENGG and SURVEYORS, Gurugram (M-9810295265) L2 | ALLIED ENGINEERS ED 54 A PITAMOURA DELHI - 110034 L1 | GEOTECH TECHNICAL ASSOCIATES PRIVATE LIMITED L4 | Royal Engineers and Construction L3 |
|---|---|---|---|---|---|---|---|
| 1 | Carrying out digitalized topographical land survey with Total Electronic Stations of high precision, marking position of each physical feature on the ground true of their position like building, sewer lines/ storm water drains with their invert levels, manholes with their invert levels, G.I. /C.I. lines, Trees (giving their girth, height and foliage etc) Overhead HT/LT electric lines, drain etc. Preparation of the Contour Plan at suitable contour intervals, depending upon the topography of the terrain and preparing drawing in A-1 size, recording reduced level at 5.0 m intervals, points of abrupt change in levels, fixing temporary bench marks (T.B.M) and marking them on ground with paint as required, calculation of area and other details of surveyed area with standard surveying software programme. Submission of three Nos. coloured drawings along with 3 Nos. soft copies on compact disc (C.D.) to be 1: 1000 or suitable scale and plotting on Auto cad and shall consist of contour plan showing all existing physical features with assumed Northing, Easting as required. Rate shall include cost of all operation described above i/c labour, machinery, stationery, T&P and clearing of minor jungle. The payment will be made for area actually surveyed and nothing extra shall be payable. The survey work will be carried out as per standards norms and directions of the Engineer –in-Charge.
Land Area = 49.23 Acre | 1 | Job | 76,400 ₹76,400 | 74,000 ₹74,000 Lowest | 90,500 ₹90,500 | 90,000 ₹90,000 |
Tender Value
Refer Docs
EMD Value
₹1,969
Closing Date
26 Dec 2025, 3:00 pmClosed
AE-C-2
HARINDRA KUMAR
Office of Executive Engineer, Gorakhpur, UP
Construction of Infrastructure at 66th Bn. Hqrs. SSB Campierganj UP (SH: Carrying out Topographical Survey). Subwork/Packages: One
136997
25/EE-GKP/2025-26/05/AE/GSDII/2025-26
OPEN
Survey Works
NCB
15 days
Gorakhpur, Uttar Pradesh
12 documents required · 12 mandatory
₹1,969
Not Applicable
26 Dec 2025
18 Dec 2025
26 Dec 2025
26 Dec 2025
24 Dec 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT_Campierganj_SSB_25.pdf
document • 1.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .