Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹81.3 LAdmitted-Finance | -7.96% | ₹81.3 L | H1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹88.3 L
EMD Value
₹1.8 L
Closing Date
4 Jul 2026, 6:00 pmClosed
Superintending Engineer
Office of SE, WDSC, Balotra
Construction of Various Watershed Structure in GP Mewanagar and Tilwara MJSA 2.2 Block Balotra Distt Balotra
2026_WDSC_569027_1
NIT-07/2026-27/BALOTRA BLOCK BALOTRA
Open Tender
Civil Works - Water Works
Percentage
180 days
MJSA-2.2 PROJECT AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER BID
₹1.8 L
29 Jul 2026
18 Jun 2026
6 Jul 2026
18 Jun 2026
4 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) (BSR 2026-27 Item No 196(ब)) | 1,670.81 | Cum | 80.06 | ₹1,33,765.05 |
| 2 | E/W for in ordinary soil for trench for aagor wall ( item no. 2 अ) | 84 | Cum | 143.92 | ₹12,089.28 |
| 3 | C.C1:4:8 wit 40mm broken stone , mixing&laying on foundation bottom of tanka (Item no 10 अ) | 429.94 | Cum | 3,349.93 | ₹14,40,268.9 |
| 4 | R.R.stone masonary in1:6 above ground ( item no- 29(ब) ) | 860.48 | Cum | 4,134.11 | ₹35,57,318.97 |
| 5 | supply and fixing of lintal ( item No-36 ब ) | 67.2 | sqm. | 2,028.33 | ₹1,36,303.78 |
| 6 | Jodhpur stone slab roofing and pointing in CM 1:4 For filling Space (item no. 45b) | 573.65 | sqm. | 1,817.15 | ₹10,42,408.1 |
| 7 | 50mm thick CC 1:2:4 for flooring and Roofing of Tanka (item No. 14(a)) | 4,087.3 | sqm. | 421.75 | ₹17,23,818.78 |
| 8 | 25 mm thick Plaster plaster C M1:4 of Tanka (item no-76 (a) ) | 1,462.48 | sqm. | 316.68 | ₹4,63,138.17 |
| 9 | 20 mm thick plaster C M1:6 (item no-77ब) | 263.03 | sqm. | 184.97 | ₹48,652.66 |
| 10 | Ruled pointing ( item no-79 अ) Inner Wall | 984.2 | sqm. | 130.55 | ₹1,28,487.31 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BID07BALOTRA.pdf
Tender Documents • 1.98 MB
BOQ_1012610.xls
BOQ • 0.29 MB
corigendumnit0310.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .