Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.3 L+₹4,506 (1.40%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.4 L+₹16,706 (5.18%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹4.2 L+₹93,206 (28.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical 00 LALPUR KICHHA ROAD RUDRAPUR KICHHA RUDRAPUR UDHAM SINGH NAGAR UTTARAKHAND 263148 | UDAM SINGH NAGAR | UTTARAKHAND | 263148 | - | Rejected-Technical ITR FOR FY 2024-25,FINENCIAL TURNOVER CERTIFICATEFOR 3 YRS,RELEVENT WORK EXPERIENCE NOT SUBMITTED |
| Sl No | Description | Qty | Unit | M/S ELECTRICAL AND INSTRUMENTATION ENGINEERS L1 | SHIV MAHADEV ENGINEERING WORKS L4 | M.A.K. CONSTRUCTION CO. L2 | M/S NOSAD CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Fabrication of Piping arrangement between main valve and pressure regulator.
(As per sample) | 2 | JOB | 4,747 ₹9,494 Lowest | 6,000 ₹12,000 | 18,000 ₹36,000 | 18,500 ₹37,000 |
| 2.00 | Fabrication of Piping arrangement between pressure regulator and three-way valve. (As per sample) | 2 | EA | 23,500 ₹47,000 | 30,000 ₹60,000 | 18,000 ₹36,000 Lowest | 18,500 ₹37,000 |
| 3.00 | Fabrication of Piping arrangement between both pressure regulator and main filling valve. (As per sample) | 1 | EA | 23,500 ₹23,500 | 30,000 ₹30,000 | 18,000 ₹18,000 Lowest | 18,500 ₹18,500 |
| 4.00 | Fabrication of Union for hydrogen cooler and exciter cooler drain line.
(As per sample) | 10 | EA | 3,280 ₹32,800 | 4,100 ₹41,000 | 2,880 ₹28,800 Lowest | 2,950 ₹29,500 |
| 5.00 | Painting of IP and SP Bus Duct of Generator of
UNIT No.6,
2X250MW, PTPP, Parichha | 1,500 | M2 | 140 ₹2,10,000 | 182 ₹2,73,000 | 139 ₹2,08,500 Lowest | 145 ₹2,17,500 |
Tender Value
₹3.7 L
EMD Value
₹8,000
Closing Date
20 Sept 2025, 4:00 pmClosed
SE OMC4 CTPS PTPP PARICHHA JHANSI
OFFICE OF SE OMC4 CTPS PTPP PARICHHA JHANSI
Miscellaneous works of Repairing and Fabrication As per Sample of pipes, union etc. for Hydrogen Gas Room and painting work of IP and SP Bus Duct of Generator UNIT 6 2X250MW, CTPS Parichha
2025_RVUNL_1052017_2
N-PAR/C/OMC4/EMD1/6000008725
Open Tender
Metal Fabrication
Fixed-rate
365 days
PARICHHA
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
DY CAO CFA AND BO PTPP
₹8,000
13 Nov 2025
2 Aug 2025
22 Sept 2025
2 Aug 2025
20 Sept 2025
2 Aug 2025
Amount
Fabrication of Piping arrangement between main valve and pressure regulator. (As per sample)
Fabrication of Piping arrangement between pressure regulator and three-way valve. (As per sample)
Fabrication of Piping arrangement between both pressure regulator and main filling valve. (As per sample)
Fabrication of Union for hydrogen cooler and exciter cooler drain line. (As per sample)
Painting of IP and SP Bus Duct of Generator of UNIT No.6, 2X250MW, PTPP, Parichha
M.A.K. CONSTRUCTION CO. (BID ID -5547396)
M/S NOSAD CONTRACTOR (BID ID -5547550)
SHIV MAHADEV ENGINEERING WORKS (BID ID -5547244)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .