Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.8 L+₹6,870.46 (4.04%)Admitted-Fee/PreQual/Technical/Finance KANCHALHKOOT | KANNAUJ | UTTAR PRADESH | 209720 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.1 L+₹36,937.96 (21.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹7,500
Closing Date
12 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
const. Of Flood Protection wall In Front of Daruloom Ashatul Binat Dardpora B
2026_RDPR_319681_37
NIT NO 87 OF 2026-27 GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹7,500
18 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
6 Aug 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 13.6 | Cum | 479.3 | ₹6,518.48 |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | 3 | Cum | 1,000 | ₹3,000 |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:3:6 coarse sand 20mm nominal size crushed stone agg.)using 20% plum | 31.7 | Cum | 5,733.6 | ₹1,81,755.12 |
| 4 | Centring and shuttering of kit ply including proping, strutting & removal of the same.foundation | 74.3 | Sqm | 286.35 | ₹21,275.81 |
| 5 | carraige of sand bajrie 25 km & H/L of 200 Mts. | 42.8 | cum | 740.74 | ₹31,703.67 |
| 6 | Add cost of Sign Board & Photo graphs | 1 | No | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1059766.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .