| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 LAccepted-AOC 402 C WING BUILDING NO 86 NAVRANG CO OP HSG SOCIETY LTD TILAKNAGAR CHEMBUR MUMBAI 89 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400089 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹58.0 L+₹72,910.25 (1.27%)Rejected-Finance 23 1 MANDIR LINE MW SINGTAM NAGAR PANCHAYAT SINGTAM EAST SIKKIM 737134 | EAST DISTRICT | SIKKIM | 737134 | L2 | Rejected-Finance Higher bid value | |
| 3 | L3₹95.2 L+₹37.9 L (66.1%)Rejected-Finance | L3 | Rejected-Finance Higher bid value | |
| 4 | L4₹96.3 L+₹38.9 L (67.9%)Rejected-Finance | L4 | Rejected-Finance Higher bid value | |
| 5 | L5₹96.5 L+₹39.2 L (68.4%)Rejected-Finance VIVEKANANDA PALLY NEAR MARUTI TEA FACTORY P O BAGDGORA DIST DARJEELING | DARJEELING | WEST BENGAL | 734001 | L5 | Rejected-Finance Higher bid value |
Tender Value
₹85 L
EMD Value
₹1.5 L
Closing Date
14 Mar 2025, 6:00 pmClosed
CWE (AF) BAGDOGRA
Commander Works Engineers (AF) Bagdogra Bagdogra Airport (WB) Pin- 734 421 Tele 0353 - 2698308
PROVN OF PU FLOORING IN TECH FLT HANGER AND DEMOLITION OF 350M (APPROX) PERIMETER WALL AND TWO WHEELER PARKING SHED AT AF STN BAGDOGRA UNDER GE (AF) BAGDOGRA.
2025_MES_697850_1
8618/BAG/2024-25/E8
Open Tender
Civil Works
Item Rate
180 days
BAGDOGRA
MES Contractor enlisted as Class C category a(i) having deposited Standing Security of Rs 175000.00 with dept. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
10 documents required · 10 mandatory
₹1,000
GE (AF) BAGDOGRA
₹1.5 L
Yes
10 May 2025
14 Feb 2025
17 Mar 2025
14 Feb 2025
14 Mar 2025
7 Mar 2025
Amount
Note 1:- (Applicable for all parts/items) : The bidders/contractors are advised to read tender documents & all corrigendum/amendments and general condition of contracts before entry/quoting the rates. Note 2:- Attention to bidder is hereby invited to upload revised BOQ if published during their bid submission. Uploading of incorrect/ pre-revised BOQ shall be treated as non bonafide and rejected. Fixed credit has been given in technical documents which shall be taken into account during acceptance of bid/tender.
Hangar floor: Epoxy Underlay 3.0mm( Nitoflor EU5) + Heavy duty polyurethane based flow applied,2mm thick floor topping ( Nitoflor SL 2000 UB) (total - 5mm thick approx.) Followed by application of UV resistant Aliphatic PU Top coat Trafficguard Wear Course. 1. Epoxy Underlay : Nitoflor EU5 is designed for application in the range of 3.0 mm A) Surface Preparation: It is essential that Nitoflor EU5 is applied to sound, clean and dry surfaces in order that maximum bond strength is achieved between the substrate and the flooring system. All dust and debris should be removed prior to application of the product. constructive solutions New concrete floors: Should be at least 28 days old with a maximum moisture content not exceeding 5%. Laitance deposits on new concrete floors are best removed by light grit blasting, mechanical scabbling or grinding. B. Epoxy Underlay: Providing mixing and laying to the designated area the epoxy underlay, Nitoflor EU5 consists of special resins and graded aggregates formulated to withstand chemical attack and impactshock. Shall be supplied as a 3 component system comprising resin base, resin hardener and fillers. When correctly laid Nitoflor EU5 will provide a surface ready to receive applications of other Fosroc flooring systems. Epoxy Underlay shall have mix density 1.80 - 1.85 g/cc, Pot life >115 minutes ,achieve a minimum compressive strength of 60 N/mm^2 (As per ASTM C579)in 7 days, Flexural strength of 22 N/mm^2 (As per ASTM 6319 part 3and Tensile strength of 11N/mm^2 @ 7 days(As per ASTM 6319 part 7,Tensile Modulus =>880 N/mm2(As per ASTM 6319 part 3, Water absorption- Nil( as per (BS 1881 Part 122);Curing characteristics @ 35ºC is Initial hardness 16 hrs,Full cure-7 days;;Pull of Adhesion Strength Crushing Resistance (BS 8204 part 1) is >2.2 N/mm2. The epoxy underlay shall achieve a minimum compressive strength of 61 N/mm2 as per ASTM C579. Flexural strength of 22 N/mm2 and Tensile strength of >10N/mm2 @ 7 days as per BS 6319. The underlay shall have nil water absorption when tested as per BS1881 Part 122. The adhesion strength ofthe epoxy underlay shall be greater than the tensile strength of concrete. 2. Heavy duty polyurethane based flow applied, 2mm thick floor topping-SL 2000 UB a). Priming: All surfaces treated with Nitoflor SL2000 should be primed with Nitoprime 25, a solvent based epoxy resin primer designed for maximum adhesion to substrates. Add the entire contents of the hardener tin to the base tin and mix the two primer components thoroughly for at least 2 minutes - under no circumstances should part mixing be considered. Once mixed, the primer should be applied immediately to the prepared substrate using stiff brushes or rollers. The primer should be well ‘scrubbed’ into the substrate to ensure full coverage, but care should be taken to avoid over application or ‘ponding’. Allow the primer to dry before proceeding to the next stage, do not proceed whilst the primer is ‘tacky’ as this will lead to unsightly marks in the finished surface. Properties of Trafficgaurd Wear Course: Pot life at 27°C -Min.2 hours, Initial cure at 30°C : 16 hours, Final cure at 30°C : 5 days, Flash point : 35°C, Crack Bridging ability (ASTMC1305) : Pass, Wet film thickness : 100 - 200 microns/coat, Adhesive bond strength (ASTM D 4541) : >1.5N/mm2 Weathering (30 days)ASTM G53: No change in original appearance, Corrosion resistance(30 days) (ASTM B117) : No change in original appearance, Humidity resistance(30 days) (Water fog exposer): No change in original appearance, Humidity resistance(30 days) (Water fog exposer) : No change,Abrasion Resistance : <45mg (ASTM D4060, CS17, 1Kg load 1000 cycles).
3. Expansion Joints: (a) Surface preparation: clean the surface and remove any dust, unsound or contaminated material, plaster, oil, paint, grease, corrosion, deposit or algae, oil and grease deposit should be removed by mechanical means. (b) Priming: prime sealing slot surface with primer 7E using a clean dry brush colpor 200 must be applied between 30 minutes and 2 hours after priming. (c) PU sealant: providing, mixing and laying cold applied, high performance, pitch free, two part polyurethane sealant colpor 200PF complies with US federal specifications SS-s200E:1984 and british standard 5212: 1990-types N,F and FB, it has specific gravity of 1.45 g/cc, movement accomodation factor (IRC-57-2006): butt joints 30%, chemical cure, full cure: : 5-7 days @ 25degree celcius hardness sore A at 25 degree C: 10+/-2, including priming of the substrate with primer 7E using a clen dry brush, fixing of backer rod with straight edge finish complete all as specified and as dirceted. Health and safety: colpor 200 PF, primer 7E and nitoflor sol may cause sensitisation by inhaling and skin contact. weat suitable protective clothing, gloves and eye/face protection. Barrier creams provide additional skin protection. Should accidental skin contact occur, remove immedietely with a resin removing cream, followed by soap and water. Do not use solvent. In case of contact with eyes, rinse immedietly with plenty of clean water and seek medical advise. Use only in well well ventilated areas.
M&L for preparation of existing joints by manually/mechanically raking out to depth of 20 to 25mm and width of joints 5 to 10mm,cleaning the joints with coir brushes and removing all the fine particles, cleaning to concrete surfaces and joints with the help of air compressor and removing away the existing sealing compound and all other loose materials to a distance exc 200 meter but n.exc 250meter as directed and provided a back rod/debonding strip (thickness 10 to 12mm) applying primer to joint with light pressure and filling the joints with polyurethane base sealing compound (pitch free) ISI marked single compound including fixing masking tape to prevent edges of joints becoming dirty due to spillage of sealant complete all as specified and directed. Make:- M/S Cipy Polyurethene Pvt Ltd, M/S SIKA India Pvt Ltd, STP Ltd, M/S Sosroc chemicals, M/S Choksey India Pvt Ltd, M/S Bostik India Pvt Ltd, Asian Paint or equivalent.
M&L for preparation of existing joints by manually/mechanically raking out to depth of 20 to 25mm and width of joints 11m to 15mm cleaning the joints with coir brushes and removing all the fine particles, cleaning to concrete surfaces and joints with the help of air compressor and removing away the existing sealing compound and all other loose materials to a distance exc 200 meter but n.exc 250meter as directed and provided a back rod/debonding strip (thickness 10 to 12mm) applying primer to joint with light pressure and filling the joints with polyurethane base sealing compound (pitch free) ISI marked single compound including fixing masking tape to prevent edges of joints becoming dirty due to spillage of sealant complete all as specified and directed . Make:- M/S Cipy Polyurethene Pvt Ltd, M/S SIKA India Pvt Ltd, STP Ltd, M/S fosroc chemicals, M/S Choksey India Pvt Ltd, M/S Bostik India Pvt Ltd, Asian Paint or equivalent.
M&L for 75mm epoxy base bay line marking: Supply and application of two components epoxy floor coating for 75mm width yellow line marking by nitoflor FC 150, fixing of masking tapes on both sides of the line and cleaning the surface using solvents, mixing the two components high build coating in two coats of 0.5mm (min) thickness each and removing the masking tape followed by neat finish complete all as specified and directed.
Demolition of Reinforced cement concrete reinforced (reinforcement cut as required to facilitate demolition) of any description and in any position not otherwise specifically provided for complete all as specified and directed.
M&L for Separating, scraping and cleaning of reinforcement (Demolition of concrete measures separately) complete all as specified and directed.
Removing grouting in between precast RCC panels and taking out precast RCC panels safely with mechanical means from column slot complete all as specified and directed.
Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed.
Dismantling fencing wire mesh, concertina coil etc of any type complete all as specified and directed.
Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern in roof coverings complete all as specified and directed.
Demolition of brick work built in cement mortar incl all piers, quions arches etc complete all as specified and directed.
Demolition of cement Concrete (un-reinforced) in ground floors and pavings n exc 15 cm thickness complete all as specified and directed.
S.N.MARKETG (BID ID -3259845)
RAMKRISHNA NARAYAN ROY & CO (BID ID -3259783)
RABI BANIK (BID ID -3260256)
M/s Prakash Traders (BID ID -3260698)
SARKAR ENGINEERING CO. (BID ID -3260494)
UNISON CONSTRUCTION (BID ID -3260352)
SHRI P P SHARMA (BID ID -3261077)
SHRI SANJAY KUMAR GUPTA (BID ID -3260954)
R.N.Construction Co. (BID ID -3261127)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .