| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 accepted |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹1.3 CrRejected-Finance | ₹1.3 Cr | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S.ARUMUGAM BUILDERS L2 | Venkatesan L3 | L D SRIKANTH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged plastering from walls and racking out joints 20mm deep etc complete complying with standard specification and as directed by the departmental officers at site of work. | 24.75 | m2 | 14 ₹346.50 | 15 ₹371.25 | 14 ₹346.50 |
| 2.00 | Dismantling, the old damaged, broken, RCC etc., complete complying with standard specification and as directed by the departmental officers at site of work. | 4.5 | m3 | 5,090 ₹22,905 | 5,100 ₹22,950 | 5,080 ₹22,860 |
| 3.00 | Dismantling the damaged Paver block and clearing away carefully disposal of unserviceable materials to a lead of 50m etc complete complying with std specfn. and as directed by the deptl officers. | 254.95 | m2 | 19 ₹4,844.05 | 20 ₹5,099 | 17 ₹4,334.15 |
| 4.00 | Dismantling the damaged, twisted Aluminium windows etc complete complying with standard specification and as directed by the deptl officers. | 3.25 | m2 | 25 ₹81.25 | 30 ₹97.50 | 25 ₹81.25 |
| 5.00 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 45.6 | m3 | 275 ₹12,540 | 280 ₹12,768 | 270 ₹12,312 |
| 6.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 242.15 | m3 | 1,980 ₹4.8 L | 2,000 ₹4.8 L | 1,955 ₹4.7 L |
| 7.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 24.6 | m3 | 5,750 ₹1.4 L | 5,800 ₹1.4 L | 5,730 ₹1.4 L |
| 8.00Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 8.01 | For Foundation and basement | 26.2 | m3 | 7,950 ₹2.1 L | 8,000 ₹2.1 L | 7,900 ₹2.1 L |
| 8.02 | For Super structure in Ground floor | 8.4 | m3 | 8,000 ₹67,200 | 8,100 ₹68,040 | 8,000 ₹67,200 |
Tender Value
₹1.2 Cr
EMD Value
₹69,800
Closing Date
30 Jan 2026, 3:00 pmClosed
Superintending Engineer PWD
Office of the Superintending Engineer PWD Buildings Construction and Maintenance Circle 2, Chepauk Chennai 5
Special Repairs to Compound Wall, Openyard pavement, Walls. Sunshade, shelter, ramp and certain other works in Madras High Court Guest House at Malligai Campus at Greenways Road, Adyar, Chennai-28.
2026_PWD_646289_1
TNPWD/50 BCM/2025-26
Open Tender
Civil Works
Adyar
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹69,800
14 Mar 2026
24 Jan 2026
30 Jan 2026
24 Jan 2026
30 Jan 2026
24 Jan 2026
Dismantling the damaged plastering from walls and racking out joints 20mm deep etc complete complying with standard specification and as directed by the departmental officers at site of work.
Dismantling, the old damaged, broken, RCC etc., complete complying with standard specification and as directed by the departmental officers at site of work.
Dismantling the damaged Paver block and clearing away carefully disposal of unserviceable materials to a lead of 50m etc complete complying with std specfn. and as directed by the deptl officers.
Dismantling the damaged, twisted Aluminium windows etc complete complying with standard specification and as directed by the deptl officers.
Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means
Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge.
For Foundation and basement
For Super structure in Ground floor
Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
For tie beam
For curved surface
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix
For foundation and basement
For Super structure in Ground floor
Cement Concrete 1:2:4 (One Cement, Two crushed stone sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix
For foundation and basement
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Plastering with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick mixed the Fibre modified compound using the Fosroc Nito Bond SBR or equivelent branded 2% by weight of cement used including mortar plasticizer at 200ml per 50Kg of cement used, finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick using fine M sand and mixing the Fibre modified compound using the Fosroc Nito Bond SBR or equivelent branded 2% by weight of cement including curing etc., complete complying with standard specification and as directed by the departmental officers.
Renewing the old damaged, M.S Vertical post with newone of supplying and fixing the MS pipe 50 mm x 50mm square hallow box section (4.98 kg/m) of approved quality and make including cutting the MS pipe of required length and removing the Bend welding with 10 guage electrode grinding smoothy and conveying the post to the site and erecting the same with necessary scaffolding materials Bolts, nuts including two coats primer coat etc complete complying with standard specification and as directed by the departmental officers at site work.
Renewing the damaged View Breaker with new one of Wood Design Plank & Boards by Ecopro Shera plank of size 2440mm x 150mm x 8mm thickness over the MS Box Section by bolt and nuts with necessary arrangements , including labour for fabrication , labour for pretty iron works etc., Complete complying with standard specification and as directed by the departmental officers at site work.
Supplying and laying of Rubber moulded Hydraulic Pressed paver block 60mm thick over a base layer of crushed stone sand filling including cost of materials laying and labour charges etc., complete complying with standard specification and as directed by the departmental officers at site work.
Supplying, erecting , manufacturing and fixing the tensile roof structure using the steel structure and membrane shall be 2 KN / m in both warp and minimum 950 GSM. The structure is to be tensioned after erection to maintain a smooth surface to minimum of 10% specefied as priested levels. The complete steel structure will be 76mm dia circular pipes for truss and 80 x 40mm MS rectangular section purlin, with thickness with necessary bolts, nuts wire rope, corner plate finished with two coats of Epoxy primer, two caots of Epoxy paint and approved colour, the memberane fabric patterned with high frequency ferrari 902 Fabrics and welding rigidly and fixing the necessary special aluminium extrusions at the end of the roof truss and special screws etc and finally finishing the surface neatly as directed by the departmental officers. Etc., complete complying with standard specification.
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications and as directed by the departmental officers. (The wall putty shall be got approved by the Executive Engineer before use of work).
Painting the wall two coats with approved weather proof Exterior Emulsion paint on cement plastered wall surface etc., complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat on cement plastered wall surface etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Louvered Ventilators of from the profile the size of outer frame 60mm x 58mm and shutter profile size of 60 x 78mm both profiles are reinforced with GI/1mm 125GSM and 100% corrosion free, the profile are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with all over the edges of frame and shutter. The corners and joints should be welded and cleaned. Radiations pin headed glass 4mm thick should be provided in the louvers. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The ventilator should be got approved from the Executive Engineer before use on work
Supplying erecting and fixing precast concrete reinforced bench with rest bench of seating size 1500mm x 420mm shall consist of 2 Nos, L shaped base support in natural cement colour of thickness 10mm back height 1000mm, front height 450mm, base width 620mm and 5 Nos reinforced concrete planks in red colour and size 1500 x 100x 50mm and 1 No reinforced concrete planks of 150 x 200 x 50mm manufactured by using M-30 grade concrete & Reinforced suitably all parts to be joined with galvanized nuts and bolts of suitable size etc.
Collecting the scattered debries using tipper machinery from work spot and loading into the tipper lorry and conveying away the same to outside by lorry to a lead of 3km entirely with in city limit including loading and unloading charges and dumping in low places and levelling neatly etc., complete complying with standard specification and as directed by the departmental officers. (200 cft volume capacity)
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS 1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST at 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
CONDITIONSSpecialrepairs.pdf
Tender Documents • 0.41 MB
BOQ_774700.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid