Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹51.9 L+₹10.0 L (23.8%)Rejected-Finance NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical BQR Not satisfied |
Tender Value
Refer Docs
EMD Value
₹49,500
Closing Date
7 Jul 2025, 2:00 pmClosed
The Superintending Engineer, GCC,Madurai
The Superintending Engineer, General construction circle,TANTRANSCO, K.Pudur,Madurai-625 007
Labour charges for dismantling, loading and transporting of 10MVA/16 MVA/25MVA(SH) 110 KV power transformers from various places and unloading, erection,HOC, earthing, painting, and commissioning at various places in Tirunelveli region
2025_EB_571672_1
SE/GCC/MDU/ELEC SPEC NO-03/2025-26
Open Tender
Electrical Works
Works
365 days
Madurai
As per BOR
2 documents required · 2 mandatory
₹0
₹49,500
28 Jul 2025
20 Jun 2025
8 Jul 2025
20 Jun 2025
7 Jul 2025
21 Jun 2025
Amount
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators,H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes,Cooler fans, Pumps etc. and Draining the oil to the required level as directed by Field Engineer.10 MVA Power Transformer (and/(or) Labour charges for erection of Power Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings ,Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer ( Gasket to be supplied by board) 10 MVA Power Transformer.
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators,H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes,Cooler fans, Pumps etc. and Draining the oil to the required level as directed by Field Engineer.16 MVA Power Transformer (and/(or) Labour charges for erection of Power Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings ,Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer ( Gasket to be supplied by board) 16 MVA Power transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators,H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes,Cooler fans, Pumps etc. and Draining the oil to the required level as directed by Field Engineer.25 MVA Power Transformer(and/(or) Labour charges for erection of Power Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings ,Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer ( Gasket to be supplied by board) 25 MVA Power Transformer
Labour charges for Pulling of Power transformer(Allotted and Failed at existing SS and new SS) from plinth to safer side or vice versa as directed by the Field Engineer
Labour charges for loading /unloading Power transformer with complete accessories including released oil, initial lead of 5 Metres as directed by the Field Engineer
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer.From 31 Ton to 50 Ton, Upto 100 Kms
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer.From 51 Ton to 100 Ton, Upto 100 Kms
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer. Above 100KM
Labour Charges for loading /unloading of power transformer oil barrel with new/ released oil from store to site or vice versa as directed by the Field Engineer.
Labour charges for draining of oil from main tank (To Barrel) as directed by the Field Engineer.
Labour charges for Intial filling of oil under vacuum from spare tank / barrel to main tank as directed by the Field Engineer.
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.10 MVA Power Transformer
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor.Oil circulation required only in Main tank -Upto 5,000 Litres
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor.Oil circulation required only in Main tank -Above 5,000 Litres
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)Upto 8 core cable.
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)Above 8 core cable
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.32 mm
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.28 mm
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.25 mm
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.19 mm
Termination of cable core end dressed neatly including the cost of cable socket (lug) ferrules, sleeves, tags, ties, stropes, etc., as directed by the field engineer.(No.of core ends in unit of 1000).
Supply of various steel materials and Labour machinery consumables for the double earthing of neutral , main tank and other panel etc.as directed by the field engineer.
Labour charges for one finish coating of aluminium painting works with spray gun for transformer complete including T&P etc. and painting of valves, bushings with red, yellow, blue and black paint including cost of paint of reputed make company viz Asian, Berger etc., and Consumables as directed by the field engineer. 10 MVA to 25 MVA Power Transformer
Supply and erection of silica gel breather flange type including the cost of 4-6 mm blue mesh silica gel.5Kg
Supply and erection of Neutral omega copper with copper M-42 Nut & washer of suitable length and diameter as per drawing and as directed by the field engineer.Up to 16MVA
Supply & erection of 1 no. Oil Temperature indicator
Supply & erection of 1 no. Winding temperature indicator with four control switch
Supply and erection of various sizes of GI bolts &Nuts and washers of required sizes to be used for erection of Turret, Radiator, wheel bolts, Conservator, Foundation bolts for A frame etc. as per the requirement during erection.
Supply ,transporting and erection of Power Transformer accessories- PRV with operating pressure 0.42,0.49,0.56 Kg/cm2,operating tolerance+ 0.1Kg/cm2, port opening Nominal 70 mm.
Supply ,transporting and erection of Power Transformer accessories -Surge relay as per IS 3637
Supply ,transporting and erection of Power Transformer accessories- Magetic Oil Gauage dial with minimum,maximum and normal (at 30C) marking and pointer and low oil level contact of 0.5 Amps , 110/30 V DC rating.
Supply ,transporting and erection of Power Transformer accessories- Buchholz relay as per IS 3637
Supply ,transporting and erection of Power Transformer accessories -Butterfly valve as per required size
Supply ,transporting and erection of Power Transformer accessories- Bushing CT's -HV CT'S as per required ratio
Supply ,transporting and erection of Power Transformer accessories -Bushing CT's -LV CT's as per required ratio
Labour Charges for Overhauling of Power/Auto Transformer OLTC mechanism including cleaning and replacing of defective spares and gaskets etc. as directed by the Field Engineer.(Gasket & Spares will be supplied by TANTRANSCO) (10MVA and above)
Charges for Transport insurrance for power Transformer from the released SS Site to the Allotted SS Site with nationalised insurrance company( Billed as per actual)
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
SHRI MEENATCHI ENGINEERING (BID ID -1390571)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .