Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.8 L+₹2.5 L (22.3%)Rejected-AOC H NO G162 SECTOR 10 FARIDABAD 121006 | FARIDABAD | FARIDABAD | HARYANA | 121006 | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹42,500
Closing Date
14 Jan 2023, 5:00 pmClosed
Bhupinder Singh XEN
HSVP office complex Sec-12 PALWAL
Maintenance of complete sewerage system i/c running and operation of all sewerage line of size inc cleaning and desilting sewer line by sewermans / jetting machine opt. and Mtc.of the temporary sewerage disposal in Sec-2 PALWAL
2022_HBC_249825_2
404/EE/HSVP/DIV PALWAL
Open Tender
Civil Works
Works
365 days
sector 2 Palwal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹42,500
Yes
15 Mar 2023
9 Jan 2023
16 Jan 2023
9 Jan 2023
14 Jan 2023
9 Jan 2023
Amount
Maintenance of complete sewerage system i/c running and operation of all sewerage line of size from 200 mm i/d to 600 mm i/d including cleaning and desilting sewer line by sewermans / jetting machine with driver and diesel and operational & maintenance, watch and ward of the temporary sewerage disposal in Sector-2, Palwal and all other works contingent thereto.” The mtc. job including the work of cleaning desilting of sewer lines and manholes by mechanically, plugging-out the sewer line, active redressal to sort out the day to day complaints/occasionally pumping required if any, on sewer line in order to maintain smooth running and operation of sewerage system. Repair of starter, main switch, panel board, electric cable. HRC fuse or any other items including cost of labour & material. Repair of pump & motor including the cost of rewinding of motor including cost of material and labour, repair of pump including the cost of induction motor, impellor, cable or any other parts complete in all respect. The contractor shall provide all kinds of safety equipments, gogals, gum boots, uniform, raincoat, soap, mustered oil and other material to the sewer man workers engaged on work. All tools & plants and other consumable items such as kassi, chain pulley basket, tourch, bamboo rodding set and any other equipment shall be provided the contractor at his own expenses. Note:- The contractor may keep proper watch & ward with regard to dislocation, misplacement, damage & unauthorized use of machinery. The contractor shall have to give contact No. for getting information of complaints for residents/JE/SDE & the contractor shall have to report back about the compliance to JE/SDE.
Allied Engineers and Errectors
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .