Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | ₹8.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.4 L+₹253.73 (0.03%)Rejected-Finance | ₹8.4 L+₹253.73 (0.03%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.4 L+₹1,945.21 (0.23%)Rejected-Finance | ₹8.4 L+₹1,945.21 (0.23%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹16,915
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 76 ghantaghar kamruddin ke Makan se kafi carners Tak ujala dry cleaner se Rizwan ke Makan Tak CC sadak V nali Nirman karya
2026_DOLBU_1162287_1
FFC Ward 76 sn 82
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Nagar Nigam Gorakhpur
₹16,915
11 Sept 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling of old brick work in lime or cement mortar including stacking with in 60m. | 7.62 | Cum | 400 | ₹3,048 |
| 1.02 | Earth work in excavation in foul position soil lead 50mt& lift 1.5 mt. incl. lab. T&P etc all complete. | 1.12 | Cum | 120 | ₹134.4 |
| 1.03 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B Including mat. Lab. T&P,etc all complete. | 0.3 | Cum | 4,007 | ₹1,202.1 |
| 1.04 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. | 18.48 | Cum | 5,817 | ₹1,07,498.16 |
| 1.05 | 12mm thick cement plaster in 1:4 cement mortor with 1 cement and 4 course sand including etc. all complete of work. | 114 | Sqm | 159 | ₹18,126 |
| 1.06 | Laying C.C in 1:2:4 for top of drain work. with cement, Course Sand20 mm & Stone Grit including supply of all material and labour etc. | 2.05 | Cum | 8,186 | ₹16,781.3 |
| 1.07 | S/Laying of GSB 53.-9.5 mm thick S/B upto 10Cm loose Layer including etc. all complete of work. | 44.1 | Cum | 3,134.25 | ₹1,38,220.43 |
| 1.08 | Consolidation of GSB upto 10 cm thick loose layer by Road Roller including etc. all.complete. | 44.1 | Cum | 210 | ₹9,261 |
| 1.09 | Water allowance to be allowed on above incl.Lab. T&P,etc all complete. | 44.1 | Cum | 34.5 | ₹1,521.45 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
d.pdf
Tender Documents • 2.36 MB
BOQ_2178528.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .