| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹3.8 L (3.55%)Admitted-Finance | ₹1.1 Cr+₹3.8 L (3.55%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹10.1 L (9.37%)Admitted-Finance | ₹1.2 Cr+₹10.1 L (9.37%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹15.1 L (14.0%)Admitted-Finance | ₹1.2 Cr+₹15.1 L (14.0%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 Cr+₹18.4 L (17.0%)Admitted-Finance | ₹1.3 Cr+₹18.4 L (17.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Gyana Ranjan Mohanty L3 | SUSANTA KUMAR SWAIN L1 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L5 | Bidyadhar Swain L6 | M/S.Parikshita Chuli and Sons L2 | Aakar Engineers and Contractors L7 | Naresh Chandra Bhatta L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing 300mm dia Single under reamed RCC M-20(Bored Compaction) Pile of 9m length from cut off level including welding of cages, boring through all strata from existing ground level with removal of obstruction if any, using bentonite, providing required reinforcement as per drawing, welded properly and disposing the boring earth out from the work site, including supply of all labour, materials, taxes, tollage, royalties,port entry fees, T&P etc complete exlcuding GST and as per direction of Engineer in charge. (Payment shall be made from cut off level).
(Excluding Cost of Reinforcement. Bending, Binding Charges) | 58 | Each No. | 9,500 ₹5,51,000 | 7,900 ₹4,58,200 | 10,000 ₹5,80,000 | 12,500 ₹7,25,000 | 7,073 ₹4,10,234 | 750 ₹43,500 Lowest | 12,000 ₹6,96,000 |
| 2.00 | Cutting of pile heads upto 0.30m from cut off level and disposing the debrises clear out of the work site with supply of all labour, T&P, port entry fees,etc. complete excluding GST and as directed by Engineer in charge. | 58 | Each No. | 100 ₹5,800 | 900 ₹52,200 | 200 ₹11,600 | 30 ₹1,740 | 25 ₹1,450 Lowest | 200 ₹11,600 | 40 ₹2,320 |
| 3.00 | Initial load Test for Pile including kenteledge of required load and supply of all testing equiments including construction of test pile cap and sismantling the same after completion of test and submitting the test report as per ISI-2911(PT-IV) with supply of all labour, materials, taxes, tollage, royalties, transportation, T&P etc complete exlcuding GST and as per direction of Engineer in charge. | 1 | Each No. | 50,000 ₹50,000 | 65,000 ₹65,000 | 30,000 ₹30,000 | 40,000 ₹40,000 | 88,500 ₹88,500 | 5,000 ₹5,000 Lowest | 20,000 ₹20,000 |
| 4.00 | Earth work in excavation in all kinds of soil with lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place with a lead of 5 km distance and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, port entry fees,loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge. | 450 | Each cum | 150 ₹67,500 | 120 ₹54,000 | 250 ₹1,12,500 | 250 ₹1,12,500 | 100 ₹45,000 Lowest | 120 ₹54,000 | 250 ₹1,12,500 |
| 5.00 | Sweet Sand filling at required lacations including watering & ramming in layer not exceeding 300mm. Including cost of all materials, labour, T&P, transportation charges, royalties, taxes,port entry fees, etc. all complete as per direction of Engineer-in-charge but excluding GST.
NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity. | 549 | Each Cum | 400 ₹2,19,600 Lowest | 850 ₹4,66,650 | 600 ₹3,29,400 | 750 ₹4,11,750 | 708 ₹3,88,692 | 1,600 ₹8,78,400 | 600 ₹3,29,400 |
| 6.00 | P.C.C(1:3:6) of using C.B.H.G chips of approved quality in foundation & plinth including mixing, hosting, laying to proper level & slope consolidating, curing, watering charges, finishing smooth to the exposed surface with including cost & supply of all materials, labour, Transportation,Curing, port entry fees,T&P, all taxes, excluding GST etc all complete as directed by Engineer-in-charge. | 97 | Each Cum | 3,500 ₹3,39,500 Lowest | 4,200 ₹4,07,400 | 5,500 ₹5,33,500 | 5,500 ₹5,33,500 | 4,719 ₹4,57,743 | 5,200 ₹5,04,400 | 5,000 ₹4,85,000 |
| 7.00 | Reinforced Cement concrete (1 cement:1.5 Coarse sand:3 chips) using 12mm to 20mm size C.B.H.G. chips of approved quality in foundation & plinth , Ground Floor etc. of including mixing in a mixer machine, hoisting, laying in proper level, consolidating by mechanical vibrator,finished smooth to the form work and exposed surface, curing, water charges, including cost of all materials, labour, Transportation,port entry fees, all testing, engagement & hire charges of all mechaniries,T&P , tollage, royalties, all taxes excluding GST etc.all complete but excluding cost of reinforcement,formwork and bending/binding charges as directed by Engineer-in-charge. | 355 | Each Cum | 6,000 ₹21,30,000 | 5,800 ₹20,59,000 Lowest | 6,800 ₹24,14,000 | 7,000 ₹24,85,000 | 5,888 ₹20,90,240 | 8,200 ₹29,11,000 | 7,000 ₹24,85,000 |
| 8.00 | Providing reinforcement steel of required diameter manufactured by SAIL/TISCON/VIZAG Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges,port entry fees,loading at one end & unloading at other end,T&P, all taxes,etc. all complete as per the direction of Engineer-in-charge but excluding GST.
(NB: No Wastage shall be Paid, Steel Coefficient shall be considered as per IS1786 for Payment Purpose.) | 468 | Each Qntl | 10,000 ₹46,80,000 | 6,900 ₹32,29,200 Lowest | 8,000 ₹37,44,000 | 10,500 ₹49,14,000 | 8,500 ₹39,78,000 | 9,500 ₹44,46,000 | 8,000 ₹37,44,000 |
| 9.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank & MS pipes, jacks and other accessories of approved quality for R.C.C. work for following structures and deshuttering, removing the same after due period with paining with coal tar /lubricants on the ply/steel surface after each use with supply of all materials, labour,transportation,port entry fees, T&P, all taxes, royalties, tollage, but excluding GST etc. complete for all floors / any height as directed by Engineer-in-charge. | ||||||||||
| 9.01 | Foundation | 360.7 | Each sqm | 115 ₹41,480.5 | 280 ₹1,00,996 | 150 ₹54,105 | 120 ₹43,284 | 100 ₹36,070 Lowest | 400 ₹1,44,280 | 115 ₹41,480.5 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
20 Apr 2022, 5:15 pmClosed
Pradosh Ku Mohanty,EE,HWD-III,PPT
Pradosh Ku Mohanty,EE,HWD-III,PPT
Construction of new (G Plus1) Electrical substation Building adjacent to E-1 house at IOHP inside Harbour Area.
2022_MoS_681285_1
CE/HWDIII/ACCTS-03/21/65
Open Tender
Civil Works
Works
365 days
Paradip
Refer Tender Document and e-TCN
4 documents required · 4 mandatory
₹3,000
Yes
As per Tender Document and e-TCN
₹2.4 L
Yes
11 Jul 2022
30 Mar 2022
22 Apr 2022
30 Mar 2022
20 Apr 2022
30 Mar 2022
Amount
Providing 300mm dia Single under reamed RCC M-20(Bored Compaction) Pile of 9m length from cut off level including welding of cages, boring through all strata from existing ground level with removal of obstruction if any, using bentonite, providing required reinforcement as per drawing, welded properly and disposing the boring earth out from the work site, including supply of all labour, materials, taxes, tollage, royalties,port entry fees, T&P etc complete exlcuding GST and as per direction of Engineer in charge. (Payment shall be made from cut off level). (Excluding Cost of Reinforcement. Bending, Binding Charges)
Cutting of pile heads upto 0.30m from cut off level and disposing the debrises clear out of the work site with supply of all labour, T&P, port entry fees,etc. complete excluding GST and as directed by Engineer in charge.
Initial load Test for Pile including kenteledge of required load and supply of all testing equiments including construction of test pile cap and sismantling the same after completion of test and submitting the test report as per ISI-2911(PT-IV) with supply of all labour, materials, taxes, tollage, royalties, transportation, T&P etc complete exlcuding GST and as per direction of Engineer in charge.
Earth work in excavation in all kinds of soil with lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place with a lead of 5 km distance and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, port entry fees,loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge.
Sweet Sand filling at required lacations including watering & ramming in layer not exceeding 300mm. Including cost of all materials, labour, T&P, transportation charges, royalties, taxes,port entry fees, etc. all complete as per direction of Engineer-in-charge but excluding GST. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity.
P.C.C(1:3:6) of using C.B.H.G chips of approved quality in foundation & plinth including mixing, hosting, laying to proper level & slope consolidating, curing, watering charges, finishing smooth to the exposed surface with including cost & supply of all materials, labour, Transportation,Curing, port entry fees,T&P, all taxes, excluding GST etc all complete as directed by Engineer-in-charge.
Reinforced Cement concrete (1 cement:1.5 Coarse sand:3 chips) using 12mm to 20mm size C.B.H.G. chips of approved quality in foundation & plinth , Ground Floor etc. of including mixing in a mixer machine, hoisting, laying in proper level, consolidating by mechanical vibrator,finished smooth to the form work and exposed surface, curing, water charges, including cost of all materials, labour, Transportation,port entry fees, all testing, engagement & hire charges of all mechaniries,T&P , tollage, royalties, all taxes excluding GST etc.all complete but excluding cost of reinforcement,formwork and bending/binding charges as directed by Engineer-in-charge.
Providing reinforcement steel of required diameter manufactured by SAIL/TISCON/VIZAG Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges,port entry fees,loading at one end & unloading at other end,T&P, all taxes,etc. all complete as per the direction of Engineer-in-charge but excluding GST. (NB: No Wastage shall be Paid, Steel Coefficient shall be considered as per IS1786 for Payment Purpose.)
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank & MS pipes, jacks and other accessories of approved quality for R.C.C. work for following structures and deshuttering, removing the same after due period with paining with coal tar /lubricants on the ply/steel surface after each use with supply of all materials, labour,transportation,port entry fees, T&P, all taxes, royalties, tollage, but excluding GST etc. complete for all floors / any height as directed by Engineer-in-charge.
Foundation
Coulmn & Beam
ROOF/Slab
Stair Case
Brick work(1:6) with flyash Brick having crushing strength not less than 75kg/CM2 in cement mortar(1:6) inclduing splay/cutting, racking out the joints, curing, hoisting, stagiing, at any height with cost and supply of all materials, labour, T & P, taxes, royalties, transportation charges,port entry fees, curing, testing charges but excluding GST etc. all complete as per direction of Engineering-in-charge.
12 mm thick Cement plaster (1:6) proportion, over brick & R.C.C. surface finished smooth to the exposed surface, rounding the corners providing grooves,beading,raincuts, wherever found necessary including cost & supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, port entry fees, tollage, royalties, safety arrangements but .excluding GST etc. all complete as per direction of Engineer-in-charge
12mm. Cement plaster (1:6)
16mm. Cement plaster (1:6)
40 mm thick graded concrete with C.C(1:2:4) by using C.B.H.G chips of 6mm and down grade of approved quality adding 2% WPC of approved brand as sugested by department ,chipping the roof surface preparing the surface before concrete work, laying concerete to required slope & level, compacting etc. all complete with supply of all materials, labour T&P, taxes royalties, curing, per requirment excluding GST etc all complete as per direction of Engineer in-charge.
Providing AS flooring of 25mm (avg.) thick, finished smooth to the exposed surface with neat cement punning of C.C(1:2:4) by using C.B.H.G chips of 12 mm and down grade of approved quality laid to proper level and slope , curing with supply of all materials, labour T&P, taxes royalties, curing, , as per requirment excluding GST etc all complete as per direction of Engineer in-charge.
Supplying, fitting, fixing fully glazed powder coated Aluminum window/ventilator shutters with anodized aluminum section of 63mm. x 37mm. x 1.50mm. thick as per approved design fixing with 5.5mm. thick plain/frosted/coloured glass panes, providing rubber beading, aluminum U channels, angle, clips, required nos. of handles, tower bolts, hooks as per requirement IS specification, all finished including cost & supply of all materials, labour, T&P, taxes, transportation charges, staging, scaffolding, making the windows waterproof using sealicon sealant but excluding GST etc all complete and as per direction of Engineer-in-charge.
Supplying,Fabricating,fitting fixing of MS Grill,made of solid Square bar /MS Flat/MS Angle/MS Channel etc.fixing position with screws,clamps,nails including grouting if required with cost and supply of all materials, labour, Port entry fees, T&P, taxes, transportation, welding charges, grinding, staging, scaffolding, finishing the joints & exposed surfaces curing but excluding GST etc all complete as directed by the Engineer-in-charge
Supply fitting fixing of G.I rolling Shutter of approved quality with all mechanical accessories and fiiitngs like roller, jack, clams, locking arrangement, plate, nut nolt, sprong,axle,etc. all complete with supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding but excluding GSTetc all complete and as per direction of Engineer-in-charge.
Painting two coats of Enamel paint of approved quality shade over a coat of primer,after scrapping, cleaning the surface, applying paint uniformly including cost and supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding but excluding GSTetc all complete and as per direction of Engineer-in-charge.
Providing and applying termite treatment to soil under floors at the junction of floors and walls, floor surface by drilling 12mm holes vertically at 300mm interval to reach the soil below and squirted chemical emulsion into these hole using a hand operated pressure pump and the holes then sealed with white cement. including all cost of insecticide, labour, transportation. taxes, staging, scaffolding etc excluding cost of GST all complete as per the direction of engineer in charge.
Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, Providing ,fitting fixing of partly Gypsum board and partly microlook edged false ceiling or full Microlook edged false ceiling with using 12mm to 15mm thick Gypsum board of size (1800mm X 1200mm ) & 12mm to 15mm thick light weight densified Microlook edged false ceiling tiles of size (595mm X 595mm) with using of GI Channels like main parameter GI channel of size (25mm X 25mm X 0.70-1.00mm) ,GI Cross channel at 25mm X 63mm X 0.70-1.00mm), GI main Channel 50mm X 12mm X 0.70-1.00mm) ,GI hanger 600mm C/C of size (25mm X 12mm ) , GI fastner 8mm dia, GI clips , GI wall angle of (25mm x 25mm ), Microlook grid channel (50mm/55mm X 15mm) fastner with GI rod/GI wire all Screws clips etc. with supply of all fittings , T&P, Labour, Materials including Two coats of Putty one coat primer & two coats of Plastic Emulsion painting.As per direction of Engineer-in-charge.
Providing and fixing 12 mm thick frameless toughened glass door shutter of approved brand and manufacture, including providing and fixing top & bottom pivot & spring type fixing arrangement and making necessary holes,Door handle, lock and stopper,etc,includinng all material for fixing required door fittings, including all taxes,transporatation,Port Entry fees, all complete excluding cost of GST as per direction of Engineer-in-charge..
Supplying, of Full nano polished Vitrified tile of size (600mm X 600mm) of any approved brand for Floors, as per latest relevant IS-code and laying in cement mortar bedding of required thickness in C:M 1:4 with neat white /grey/colour cement slurry fixed in correct line, level in approved design and pattern. The work will be excuted in all floors including pointing the joints with matching colour cement, cleaning the surface, curing, acid cleaning the tile work Loading at one end and unloading at the other end, port entry fees etc., all complete as per directions of the Engineer-in-Charge. ( Excluding GST)
Applying two coat of approved quality wall Putty over the wall surface having resistance to Fungus, moisture, Fading including cost and supply of all materials, labour, T&P, taxes, transportation, staging, scaffolding, etc but excluding GST complete and as directed by the Engineer-in-charge.
Painting two coats with Weather Coat of approved quality & shade over a coat of primer, at any floors with applying the paint uniformly including cost of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, but excluding GST etc all complete and as per direction of Engineer-in-charge.
Supplying, fitting and fixing & laying of 110 mm OD PVC grey pipes of type-B schedule-40 conforming to IS-13592 with all accessories & fittings conforming to IS-14735 & all related accesorries fittings for laying of Pipe line for water supply & sanitary works with supply all accessories fittings, labour, material, T&P, transportation, taxes, staging, scaffolding, but excluding GST etc all complete as per direction of Engineer-in-charge.
Engagement the following machineries for Cutting & removal of Extra earth & debrises from the work site including loading one end & unloading at the other end,engagement,hire and running charges, operator expenses,fuel,lubricants with all materials, labour, T&P, taxes,Port Entry Fees, Cost of Operator but excluding GST etc all complete and as per direction of Engineer-in-charge. NB-No idle Charges shall be paid.
Earth Excavator 1 Cum bucket Capacity
Engage Hyva
M/S.Parikshita Chuli and Sons
Gyana Ranjan Mohanty
Naresh Chandra Bhatta
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
Bidyadhar Swain
Aakar Engineers and Contractors
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_716960.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .