Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.6 L+₹29,611 (2.61%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹11.8 L+₹42,700.83 (3.77%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹11.8 L+₹51,088.50 (4.51%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹11.9 L+₹62,144.96 (5.49%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹12.7 L
EMD Value
₹1.3 L
Closing Date
3 Sept 2026, 12:00 pmClosed
Chief Engineer civil
NAGAR NIGAM AGRA
Zone-1, Chhatta (Ward Area) No. 60 Beautification work of the community center in Satya Nagar, Narayach.
2026_DOLBU_1180574_1
03-08-2026/NAGAR NIGAM AGRA/03-09-2026/163
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Nagar Nigam
₹1.3 L
9 Oct 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) | 31.2 | Cum | 5,325 | ₹1,66,140 |
| 2 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.
(c) 1 Cement : 4 Coarse sand.
(Chapter No.13 Si.No.2) | 570.6 | Sqm | 200 | ₹1,14,120 |
| 3 | Finishing Wall Putty Aproved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all material. (15-Chapter Si.No.27 New) | 570.6 | Sqm | 75 | ₹42,795 |
| 4 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 Itr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work. (Chapter No.15 Si.No.17) | 570.6 | Sqm | 140 | ₹79,884 |
| 5 | Supply and Fixing of Light Fitting Switch Board. (None Sheduled) | 10 | Nos | 71 | ₹710 |
| 6 | Supply and Fixing Wiring of Light Point. (None Sheduled) | 10 | Nos | 361 | ₹3,610 |
| 7 | S/L/J of 20mm dia PVC Cunduct Pipe etc. all complete. | 30 | Mtr | 26 | ₹780 |
| 8 | Supply & Fixing of wiring Sub Main. | 8 | Mtr | 118 | ₹944 |
| 9 | Supply & Fixing of Plug Point 15Amp. | 5 | Nos | 142 | ₹710 |
| 10 | Supply & Fixing of 27watt. CFL etc. all complete. | 10 | Nos | 315 | ₹3,150 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.81 MB
BOQ_2219830.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .