Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹678.1 CrAccepted-AOC NO 2 E 1 NEW INDUSTRIAL AREA MANDIDEEP | RAISEN | MADHYA PRADESH | 462046 | ₹678.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹712.7 CrRejected-Finance 114B E SYKES EXTENSION KOLHAPUR MAHARASTRA | KOLHAPUR | MAHARASHTRA | 416001 | ₹712.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹722.7 CrRejected-Finance | ₹722.7 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹746.3 CrRejected-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹746.3 Cr | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | Laxmi Civil Engineering Services Pvt Ltd L2 | GVPR ENGINEERS LIMITED L3 | SPML INFRA Limited L1 | LARSEN AND TOUBRO LIMITED L4 |
|---|---|---|---|---|---|---|---|
| 1.00Survey, Soil investigation, design and execution of various works for augmentation of water supply system which includes construction of an Intake of 1650 MLD capacity with RawWater pump house, Water Treatment Plant of capacity 400 mld with clear water booster pumping stations, pumping main & Electric sub station complete as required as per scope of work with 10 years of operation and maintenance of complete work under AMRUT 2.0 for Indore City. SECOND CALL | |||||||
| 1.01 | Survey, Soil investigation, Design , Construction & commisioning :-
A) Intake well cum sump and pump house of 1650 MLD, Approach bridge of length 475 mtr of minimum 15 mtrs width, with clear carriage way of minimum 15 mtrs starting from pump house upto and landed on existing intake phase-3, having support arrangement for pipe lines and power cables,approach channel,boundary wall all around intake ,Air Conditioning of Control Room, Furniture as per approved design & drawing.
B) Installation of raw water pumps for pumping water up to proposed WTP-400 MLD, existing WTP 360 MLD & existing WTP 180 MLD. The work shall include construction of substation transformers, 11KV and 33 KV HT feeder line substation of 33/11 KV.
C) Interconnection of Existing 1200 mm (phase-1 &2) existing pipeline with new intake, interconnection existing 2100 mm (phase-3) pipeline with new intake.
D) Providing, laying, jointing, testing and commissioning of raw water pumping main having dia of 2235mm from prop. intake well to Prop. 400 MLD WTP of length 14450 mtr including excavation refilling, road cutting/ dismantling, restoration, providing valves, surge protection system and specials and fittings all complete.
E) Construction of 400 MLD water treatment plant , sum & clear water pump house.
F) Installation of clear water pumps for pumping water from prop WTP-400 MLD up to booster pumping station-1, The work shall include construction of substation transformers, 33 KV HT feeder line substation of 33/11 KV.
G) Supply , laying , testing 132 KV line with 132 Kv Feeder Bay on existing second circuit of 132 KV DCSS line from 220 KV S/S Badwaha, dist.Khargone to Prop WTP 400 MLD at Bhaklai
H) Construction of 132 / 33 kv electric substation at prop. WTP-400 mld bhaklai
I) Providing, laying, jointing, testing, commissioning of clear water pumping main having diameter 2235 mm from WTP to booster pumping station-1 of length 6435 mtr,including excavation, refilling, road cutting/dismantling, restoration, providing valves, surge protection system and specials and fittings all complete.
J) Construction of pump house and sump &Installation of clear water pumps for pumping water from booster pumping station-1 to Proposed BPT, The work shall include construction of substation transformers, 33 KV HT feeder line substation of 33/11 KV.
K) Providing, laying, jointing, testing, commissioning of clear water pumping main having diameter 2337 mm from booster pumping station-1 to prop. BPT of length 1037 mtr, including excavation, refilling, road cutting/dismantling, restoration, providing valves, surge protection system and specials and fittings all complete.
L) Construction of break pressure tank having capacities of 12 MLD.
M) installation of instrument and operation by PLC- SCADA for monitoring and controlling of WTP -400 MLD, booster pumping station, intake etc.
N) Rehabhilation of existing WTP 180 MLD phase-1&2 & pump houses-2,3,4 & 5 , the works include all civil, mechanical & electrical work.
O) Interconnection of pump house no-5 of phase-1 & 2 of 1200 mm dia pipe to proposed BPT by laying new pipeline.
P) Rehabhilation of existing WTP 30 MLD devdharam & raw water pump, the works include all civil, mechanical & electrical work.
Q) Construction of new WTP 15 MLD at devdharam, the works include all civil, mechanical & electrical work.
R) Repalcement of damage pipeline at various location of raw water pipeline from yeshawant sagar to devdhram WTP.
S) installation of instrument and operation by PLC- SCADA for monitoring and controlling of WTP-15 MLD , 30 MLD, Raw water pumping station, intake etc.
T) Buy back of old pumps, valves , machinery, etc after commissioning of Proposed system | 1 | as per schedule | 7,12,65,55,555 ₹712.7 Cr | 7,22,74,50,000 ₹722.7 Cr | 6,78,13,74,308 ₹678.1 Cr | 7,46,28,10,000 ₹746.3 Cr |
Tender Value
₹579.8 Cr
EMD Value
₹50 L
Closing Date
5 May 2025, 5:30 pmClosed
THE EXECUTIVE ENGINEER WATER SUPPLY IMC
OFFICE OF THE EXECUTIVE ENGINEER WATER SUPPLY IMC
Survey, Soil investigation, design and execution of various works for augmentation of water supply system which includes construction of an Intake of 1650 MLD capacity with RawWater pump house, Water Treatment Plant of capacity 400 mld
2025_UAD_401569_1
01/AMRUT-2.0/IMC/2024-25
Open Tender
Civil Works - Water Works
912 days
INDORE
Please refer Tender documents.
8 documents required · 8 mandatory
₹50,000
₹50 L
5 Dec 2025
13 Feb 2025
6 May 2025
13 Feb 2025
5 May 2025
13 Feb 2025
Amount
Survey, Soil investigation, design and execution of various works for augmentation of water supply system which includes construction of an Intake of 1650 MLD capacity with RawWater pump house, Water Treatment Plant of capacity 400 mld with clear water booster pumping stations, pumping main & Electric sub station complete as required as per scope of work with 10 years of operation and maintenance of complete work under AMRUT 2.0 for Indore City. SECOND CALL
Survey, Soil investigation, Design , Construction & commisioning :- A) Intake well cum sump and pump house of 1650 MLD, Approach bridge of length 475 mtr of minimum 15 mtrs width, with clear carriage way of minimum 15 mtrs starting from pump house upto and landed on existing intake phase-3, having support arrangement for pipe lines and power cables,approach channel,boundary wall all around intake ,Air Conditioning of Control Room, Furniture as per approved design & drawing. B) Installation of raw water pumps for pumping water up to proposed WTP-400 MLD, existing WTP 360 MLD & existing WTP 180 MLD. The work shall include construction of substation transformers, 11KV and 33 KV HT feeder line substation of 33/11 KV. C) Interconnection of Existing 1200 mm (phase-1 &2) existing pipeline with new intake, interconnection existing 2100 mm (phase-3) pipeline with new intake. D) Providing, laying, jointing, testing and commissioning of raw water pumping main having dia of 2235mm from prop. intake well to Prop. 400 MLD WTP of length 14450 mtr including excavation refilling, road cutting/ dismantling, restoration, providing valves, surge protection system and specials and fittings all complete. E) Construction of 400 MLD water treatment plant , sum & clear water pump house. F) Installation of clear water pumps for pumping water from prop WTP-400 MLD up to booster pumping station-1, The work shall include construction of substation transformers, 33 KV HT feeder line substation of 33/11 KV. G) Supply , laying , testing 132 KV line with 132 Kv Feeder Bay on existing second circuit of 132 KV DCSS line from 220 KV S/S Badwaha, dist.Khargone to Prop WTP 400 MLD at Bhaklai H) Construction of 132 / 33 kv electric substation at prop. WTP-400 mld bhaklai I) Providing, laying, jointing, testing, commissioning of clear water pumping main having diameter 2235 mm from WTP to booster pumping station-1 of length 6435 mtr,including excavation, refilling, road cutting/dismantling, restoration, providing valves, surge protection system and specials and fittings all complete. J) Construction of pump house and sump &Installation of clear water pumps for pumping water from booster pumping station-1 to Proposed BPT, The work shall include construction of substation transformers, 33 KV HT feeder line substation of 33/11 KV. K) Providing, laying, jointing, testing, commissioning of clear water pumping main having diameter 2337 mm from booster pumping station-1 to prop. BPT of length 1037 mtr, including excavation, refilling, road cutting/dismantling, restoration, providing valves, surge protection system and specials and fittings all complete. L) Construction of break pressure tank having capacities of 12 MLD. M) installation of instrument and operation by PLC- SCADA for monitoring and controlling of WTP -400 MLD, booster pumping station, intake etc. N) Rehabhilation of existing WTP 180 MLD phase-1&2 & pump houses-2,3,4 & 5 , the works include all civil, mechanical & electrical work. O) Interconnection of pump house no-5 of phase-1 & 2 of 1200 mm dia pipe to proposed BPT by laying new pipeline. P) Rehabhilation of existing WTP 30 MLD devdharam & raw water pump, the works include all civil, mechanical & electrical work. Q) Construction of new WTP 15 MLD at devdharam, the works include all civil, mechanical & electrical work. R) Repalcement of damage pipeline at various location of raw water pipeline from yeshawant sagar to devdhram WTP. S) installation of instrument and operation by PLC- SCADA for monitoring and controlling of WTP-15 MLD , 30 MLD, Raw water pumping station, intake etc. T) Buy back of old pumps, valves , machinery, etc after commissioning of Proposed system
Laxmi Civil Engineering Services Pvt Ltd (BID ID -1198899)
GVPR ENGINEERS LIMITED (BID ID -1207342)
LARSEN AND TOUBRO LIMITED (BID ID -1245799)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid