| 1 | L1₹57.7 LAccepted-AOC | ₹57.7 L | L1 | Accepted-AOC L1 CONTRACTOR, LOA ISSUED ON 21.03.2024 UPDATED |
| 2 | L2₹57.9 L+₹25,770.25 (0.45%)Rejected-Finance | ₹57.9 L+₹25,770.25 (0.45%) | L2 | Rejected-Finance L2 CONTRACTOR |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
3 Jan 2024, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Periodic Renewal and Maintenance of PMGSY Road From Trichy road to kothampatti road in Kottampatti Block of Madurai District under PMGSY Incentive Grant 2022-2023 Package No. TN08-71
2023_RDTN_130204_1
DIPR/5580/Tender/Kott04
Open Tender
Civil Works - Roads
Item Rate
120 days
Kottampatti
Refer Tender document
3 documents required · 3 mandatory
₹0
₹1.2 L
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
1 Nov 2025
22 Dec 2023
3 Jan 2024
23 Dec 2023
3 Jan 2024
27 Dec 2023
27 Dec 2023
Amount
Renewal Of Block Topping the Road from Trichy road to kothampatti road 0/0-3/350 in Kottampatti Block under PMGSy Incentive Fund (2022-23)
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using roviding and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0
Supply and fixing of KM stone SI No. 43 A.
Supply and fixing of HM stone SI No. 44 A
Provision for MS Name Board.
Renewal Of Block Topping the Road from Trichy road to kothampatti road 0/0-3/350 in Kottampatti Block under PMGSy Incentive Fund (2022-23)
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Balathandayyudapani
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .