| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-AOC V P O BUDH SAILI DISTT BHIWANI PIN 127046 | BHIWANI | HARYANA | 127046 | ₹3.2 Cr | 1 | Accepted-AOC 1st |
| 2 | 2₹3.5 Cr+₹30.4 L (9.42%)Rejected-AOC | ₹3.5 Cr+₹30.4 L (9.42%) | 2 | Rejected-AOC 2nd |
| 3 | Rejected-Technical VILLAGE BINDRABAN TESHIL DISTT CHARKHI DADRI 127310 | CHARKI DADRI | HARYANA | 127310 | - | - | Rejected-Technical Technically not qualified |
| 4 | Rejected-Technical H NO 16 SECTOR 13 PART II HISAR | HISAR | HISAR | HARYANA | - | - | Rejected-Technical Technically not qualified |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
17 May 2021, 5:00 pmClosed
Executive Engineer
Provincial Division PWD BR Charkhi Dadri
Construction of new road from Kalyana Bye Pass km 1.44 in Provl. Divn.PWD BR Br., Charkhi Dadri
2021_HRY_169843_1
pwd/292.00/Kalyana By-pass
Open Tender
Civil Works - Roads
Works
180 days
Charkhi Dadri
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹5.8 L
1 Jun 2021
23 Apr 2021
18 May 2021
23 Apr 2021
17 May 2021
23 Apr 2021
Amount
Construction of embankment, sub grade and shoulders of new road with soil of minimum CBR (4 days soaked) of 8% obtained from borrow area with all lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by employer with respect to GTS. At no place top of sub grade of raised road shall not be less than 0.90 m above adjoining NSL. NSL for a block of 100m will be worked as mean of 6 levels taken on 20 m center to center length of road. These six levels are at three location on both side one at edge ROW. Other at 5 m and 10 m away from ROW. In case the quantity of earth work calculated with NSL and finished level found to be less than 7461.00 cum. Then actual quantity (less than 7461.00 cum) will be paid. In case quantity worked out is more than 7461.00 cum, then only 7461.00 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS.However, typical X-section attached at section 5 of DNIT.
Providing and laying 150 mm thick granular sub base consisting of filter layer upto both side edge confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying 100 mm thick Dry Lean Cement Concrete Sub –Base Construction of dry lean Cement Concrete M-10 sub base over a prepared sub grade with coarse and fine aggregate conforming to IS 383 the size if course aggregate not exceeding 25 mm aggregate cement ratio not to be exceed 15:1 aggregate gradation after blending to be as per table 600-1of MoRT&H specification (5th edition) cement content not to be less than 150 kg/ cum optimum moisture content to be determined during trail length construction, concrete strength not to be less than as 10 MPA at 7 days mixed in the batching plant transported to site laid with a paver compacting with 5-10 tonne vibratory roller, finishing and curing as per clause 601 of MoRT&H specification (5th edition ) 2013. Note: - If cement contents are required more than 150 Kg. per cum to achieve strengthening it will be incidental to work and nothing shall be payable on this account.
Providing and laying 280 mm cement concrete of un-reinforced, dowel jointed, plain cement concrete pavement M-40 over a prepared sub base with 43 grade cement @ minimum 400 Kg. per cum, coarse and fine aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a slip form paver, spread, compacted and finished in a continuous operation including provision and cost of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, de-bonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, panel size 2.75 mtr. x 3.5 mtr., Dowel bars 400mm long 30mm dia MS bar. @300mm C/C, tie bars - 640mm deformed bars, 12mm dia @720mm C/C, provide 125 micron PVC sheet between DLC & PQC and MoRT&H specification No.602. 5th edition 2013 (NS) Note: - Minimum cement content for this item will be 400 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 400 kg /cum, then the extra cement will be incidental to work and nothing shall be payable on this account.
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Earth work in excavation in foundations, trenches, etc. in all kind of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres (HSR 6.6).
Cement concrete 1:6:12 with stone aggregate 40 mm nominal size in foundation and plinth. (HSR 10.32)
First class brick work laid in cement sand mortar 1:5 in foundation and plinth(HSR 11.3)
Cement pointing 1:2 deep variety on brick and tile work (HSR 15.60)
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Reinforced Cement Concrete 1:2:4 Kilometre Stone of Standard design, fixed in position, including finishing, including painting- (iii) Kilometre Stone on village roads. (HSR 10.129(ii) + 16.75 b(ii)) Oridinary KM Stone
Reinforced cement concrete 1:2:4 200 mtr. stone of standard design, fixed in position, including finishing and painting. (NS) Note: In case of any difference in the unit & nomenclature of any of the HSR/MORD items depicted in this DNIT and that given in HSR/Mord the unit and nomenclature given in HSR/MORD shall be applicable.
M/s K.K. Construction Company
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .