Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 140 MANISH NAGAR SOMALWADA ROAD SHYAM NAGAR NAGPUR MAHARASHTRA 440015 INDIA UDYAM MH 20 0136008 | NAGPUR | MAHARASHTRA | 440015 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
28 Feb 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer EDC
A37 HYDEL COLONY KAVI NAGAR GHAZIABAD
Work of release the different new connection, Increase and decrease load etc. (running) in deposit scheme under the area of Electricity Distribution Division Muradnagar
2022_PVVNL_674542_2
36/2021-22/E.D.C./GZB
Open Tender
Electrical Works
Item Rate
365 days
Ghaziabad
Please refer tender Documents
2 documents required · 2 mandatory
₹3,540
Superintending Engineer EDC
₹10,000
3 Mar 2022
14 Feb 2022
28 Feb 2022
14 Feb 2022
28 Feb 2022
14 Feb 2022
90 days
Amount
Cartage of PCC/ST poles 8.5/11 MTR LONG from store center or from any other place to the respective site of work through the kuchha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc and also including the cost of labor, T&P carrier etc. required for proper completion of work,(up to 50 KM) (A) PCC POLE 8.5 MTR LONG ST POLE 11 MR LONG
Cartage of line material, Stay Rod, ACSR rabit ABC conductor ear thing rod Cross arms11KV pin Insulator ,Disc fitting MS Channel ,MS Angle, clamps all complete material etc&. from store Center Ghaziabad /Hapur /JE store to site of work including loading and unloading at both end.
Cartage of 25/100 KVA T/F from store centre or from any other place to the respective site of work trough the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc, and also including the cost of labour, T&P and carrier etc. required for proper completion of work (0-50KM)
Cartage of CT/PT UNIT, METERING CUBICAL from store centre or from any other place to the respective site of work trough the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc, and also including the cost of labour, T&P and carrier etc. required for proper completion of work (0-50KM)
Erection of single/double support P.C.C/ ST poles 8.5/11 meter long including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labor, T & P and carrier etc. required for proper completion of work.
(A) Errection Charge singal Support P.C.C/ S.T. Pole. 8.5/11 Mtr. long.
(B) Errection Charge doubleS.T. Pole. 11 Mtr. long.
(C) Grouting of support.
Laying sagging stringing and binding and jump ring etc of ACSR Weasel conductor/LT ABC on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labor, T&P, carrier etc required for proper completion of work
(A) ACSR WEASEL CONDUCTER/RABBIT/DOG
(B) L.T ABC
Erection and grouting of stay set including the work of nuzzling etc. as per RESPO manual and also including the cost of all grouting material, labor, T&P etc required for proper completion of work
Ear thing of each supports with MS earth rod of 2.5 Mtr long including excavation of pit and driving of MS rod up to proper depth and connection the earth electrode with the help of GI wire and SWG.
Installation of 25/63/100 KVA T/F () on D/P & Making Connection At Both side of transformer.
B. CT PT & MET.CUBICAL
Laying of 11 kv cable 3*70/120/185 XLPE after making trench & cable shall be duly protected by bricks in both side of cable by laying bricks vertically on top of vertically laid bricks along the cable for connecting the d/p to M/C
Body & neutel earthing of 250 KVA T/F installed by digging of pit upto water level marked confirming to the requirement of is specification & then connecting the top of the inserting pipe & T/F body through GI strip of size 50*6 mm with the help of nut bolt & through gas welding as per direction of supervision engineer. The cost of material labour & T&P carrier etc. required for proper completion of work (for 11 KV CT/PT & M/C)
Removing & dismentaling of ACSR weasel conducter for existing line
Removing & dismentaling of PCC pole /ST pole for existing line.
carriage of all line material & pole from site to store.
Supply of Stay clamp made of MS Flat size 50X6mm suitable for PCC/ST Poles.
Supply of cross arm MS holding clamp PCC/ST poles
Supply of MS bolt & Nuts of size (16X150mm ,4”X1/2” Ench,1.5”X1/2” Ench,1”X1/2” Inch ) & off size half threaded of good quality.
Supply of LT pin clamp made of MS Flat size 50X6mm suitable for PCC/ST Poles.
Supply of 11 KV cable box 3*70 /120/185mm.
Supply of Dead end clamp with I hook.
Supply of suspension clamp with J hook.
Supply of Peircing clamp.
Supply of LT insulator.
SHREE TECH ENTERPRISES
R K Engineering Co
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .